Belen Energy Center: Reliable, Low-Cost, Renewable Energy 24/7/365
• Zero emissions power plant
• Fits New Mexico’s new energy plan1
• Will provide 5% of New Mexico electric energy consumption
• Lower cost than fossil-fuel plants
• Approval will create jobs in New Mexico
• Supports EPA’s haze compliance plan
• New technologies (solar + storage)
• New Mexico – Home of world’s largest solar + storage plant
• Goal: Commissioned by December 2016
• Substantial economic development
2
Accelerate New Mexico’s goal: 20% renewable by 2020
1 www.EMNRD.state.nm.us/EnergyPolicy/
By The Numbers
Enough electric energy for 38,000 New Mexico homes 24/7/3651
Lower carbon emissions207,000 tons per year less than gas turbines2
Lower capital costsCapEx lower than current (fossil fuel) plan
Lower operations and maintenance costs47% less than gas turbines
No fuel costs
Photovoltaic plant4,300 gearless dual-axis trackers400,000 solar panels100,000,000 ac watts (100 MW)333,000,000 kWh per year (333 GWh)1
Battery storageNameplate: 50,000,000 watts (50 MW)Peak: 60,000,000 watts (60 MW)200,000 kWh (200 MWh)
4
1 PVSyst (Albuquerque). 2 US EPA – http://www2.epa.gov/energy#results
Team• Developer: MaxxSolar USA – Gerald Rauch, CEO
Samsung C&T (www.SamsungCNT.com)
• Project engineering and construction (EPC): Eaton (www.Eaton.com)
• Solar panels: RECOM (www.Recom-Solar.com)
• Gearless dual-axis trackers: Mechatron Solar (www.Mechatron-Solar.com)
• Storage batteries: UniEnergy Technologies (www.UETechnologies.com)
• Battery integration: Nitebloom Energy (www.NitebloomEnergy.com)
• Energy consulting: ECCO International (www.EccoIntl.com)
8
Why Solar + Storage?
10
-12,00 0
-7, 000
-2,0 00
3,00 0
8, 000
13,000
18,0 00
0:14 2:14 4:14 6:14 8:14 10:14 12:14 14:14 16:14 18:14 20:14 22:14
-12,00 0
-7, 000
-2,0 00
3,00 0
8, 000
13,000
18,0 00
0:14 2:14 4:14 6:14 8:14 10:14 12:14 14:14 16:14 18:14 20:14 22:14
Demand – 40,000 homesOctober 19
Demand data from University Of Arizona Southwest Variable Energy Resource Initiative – www.sveri.org (Tucson)
Why Solar + Storage?
11
-12,00 0
-7, 000
-2,0 00
3,00 0
8, 000
13,000
18,0 00
0:14 2:14 4:14 6:14 8:14 10:14 12:14 14:14 16:14 18:14 20:14 22:14
Solar – ground mountDemand – 40,000 homesOctober 19
Solar data from PVSyst – www.PVSyst.com (Albuquerque).
Why Solar + Storage?
12
-12,00 0
-7, 000
-2,0 00
3,00 0
8, 000
13,000
18,0 00
0:14 2:14 4:14 6:14 8:14 10:14 12:14 14:14 16:14 18:14 20:14 22:14
Solar – dual-axis trackers
Solar – ground mount
Demand
Solar data from PVSyst – www.PVSyst.com (Albuquerque).
Why Solar + Storage?
13
-12,00 0
-7, 000
-2,0 00
3,00 0
8, 000
13,000
18,0 00
0:14 2:14 4:14 6:14 8:14 10:14 12:14 14:14 16:14 18:14 20:14 22:14
Solar – dual-axis trackers
Demand
Solar data from PVSyst – www.PVSyst.com (Albuquerque).
Why Solar + Storage?
14
-12,00 0
-7, 000
-2,0 00
3,00 0
8, 000
13,000
18,0 00
0:14 2:14 4:14 6:14 8:14 10:14 12:14 14:14 16:14 18:14 20:14 22:14
Solar – into the grid
Solar – excessDemand
Solar data from PVSyst – www.PVSyst.com (Albuquerque).
Why Solar + Storage?
15
-12,00 0
-7, 000
-2,0 00
3,00 0
8, 000
13,000
18,0 00
0:14 2:14 4:14 6:14 8:14 10:14 12:14 14:14 16:14 18:14 20:14 22:14
Solar – excess
Solar – into battery storage
From batteries to grid From batteries to grid
Solar – into the grid
Demand
Why Solar + Storage?
16
-12,00 0
-7, 000
-2,0 00
3,00 0
8, 000
13,000
18,0 00
0:14 2:14 4:14 6:14 8:14 10:14 12:14 14:14 16:14 18:14 20:14 22:14
-12,00 0
-7, 000
-2,0 00
3,00 0
8, 000
13,000
18,0 00
0:14 2:14 4:14 6:14 8:14 10:14 12:14 14:14 16:14 18:14 20:14 22:14
100% of demand met by renewable energy
Demand
Capital Cost
18
Capital cost after tax credits, normalized by GWh per year. Based on PNM estimates.
Aeroderivative gas turbine
PV Tier 1
PV Tier 2
Gas turbine
PV
Storage
$0
$50,000,000
$100,000,000
$150,000,000
$200,000,000
$250,000,000
$300,000,000
$350,000,000
$400,000,000
Current resource plan Solar + storage
$90,500,000 lower
Operations And Maintenance Cost Per Year (Equal MWh)
Copyright 2015 Mechatron Solar.19
Fixed O&M
Fixed O&M
Variable O&M
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
$10,000,000
Current resource plan Solar + storage
48% lower annual cost
Mechatron Gearless Dual-Axis Trackers
500 kW
S140 Gearless Azimuth Trackers
Copyright 2015 Mechatron Solar Inc.22
0
20
40
60
80
100
120
7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00
MWhper
hour
0
200
400
600
800
1,000
1,200
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
MWhperday
More Energy From Dual-Axis Tracking
26
Trackers Trackers
Solar on fixed racksSolar on fixed racks
Albuquerque September 12
Albuquerque PVSyst
4:00 p.m.89% more
Solar data from PVSyst.
Copyright 2015 Mechatron Solar Inc.
Uptime
99.0%
99.2%
99.4%
99.6%
99.8%
100.0%
2008 2009 2010 2011 2012 2013 2014
100.00% 99.99% 99.99% 99.97%99.93%
99.97% 99.97%
Copyright 2015 Mechatron Solar Inc.28
Mechatron Trackers: Manufacturing In New Mexico
Initial production: 500 trackers per month (1 shift)
Full capacity: 1,000 trackers per month (1 shift)
Trackers needed for Belen Energy Center: 4,340
Estimated jobs: 40 (1 shift)
Assembly technicians: 25
Facility management, engineering, quality assurance, procurement, IT, etc.: 15
30
Belen Energy Center: New Mexico Jobs
• 200-300 on-site construction
• 15-30 on-site operation
• 50-100 local manufacturing and assembly
31
1 www.EMNRD.state.nm.us/EnergyPolicy/
Timeline
2015 2016Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
ContractsSite prepExcavation, padsSubstationBatteries on siteESS – 50 MWCommissionPV – 1 trackerPV – 50 MW acCommissionPV – 50 MW acCommission
34
Belen Energy Center: Reliable, Low-Cost Clean Energy 24/7/365
36
• Zero emissions
• Gearless dual-axis trackers
• New battery technology: Reliable 24/7 energy
• New Mexico jobs