Projec t Sum m ary Agency: Lancaster County Division: Engineering
1. SW 40th Street - Lincoln West, Bridge - L-218 Bridge over Middle Creek, Bridge, Grading, Culverts Guardrail Note: ( Part of City’s SW 40th Street Viaduct Project) BRO-7055(90) 0.2 Miles 2. West Denton Road - SW 56th Street to SW 12th Street
Reconstruct roadway. STPE-3305(9) 3.0 Miles
3. South 68th Street, R.R. Viaduct Bridge, Grading, Paving, Culverts, Guardrail, etc C55-S-401(6) 1.0 Mile
4. North 14th Street - Lincoln North, Bridge F - 88 Bridge, Grading, Paving, Culverts, Guardrail, etc BR-3405(5) 0.2 Miles
5. Panama Road - Hickman Southeast, X - 117 Bridge, Grading, Culverts, Guardrail, etc. BR-3270(4) 0.2 Miles 6. West Raymond Road - Raymond East, Bridge C - 91 Bridge, Grading, Paving, Culverts, Guardrail, etc. BH-3370(2) 0.2 Miles 7. South 68th Street – Hickman North, Hickman Road to Roca Road Reconstruct Roadway STPE-3265(7) 1.5 Miles 8. Agnew Road, - Waverly Northwest, Bridge A - 136 Bridge, Grading, Culverts, Guardrail, etc. BR-3380(4) 0.2 Miles 9. Waverly SE Bridge on Fletcher Ave. over a small stream., Bridge Replacement. CN12865 10. Malcolm SE Bridge on NW 98th Street over Middle Creek Bridge Replacement CN12864 11. West Sprague Road Bridge over Salt Creek Bridge Replacement CN12786 B-1
Status of Previous Years Projects Completed or Under Construction in FY 2005-06
• Pioneers Blvd. – Lincoln West, Bridge O -174 • Firth Road Overpass • Panama Road – Bridge X – 117,
(Scheduled for 06-07) (Preliminary Eng. Completed)
• S. 68th Street Railroad Viaduct, C55-S-40(6),
(ROW Acquisition) • Rock Creek Road – Waverly North, Bridge A-76,
Bridge, Grading, Culverts, Guardrail, etc. BRO-7055(101)
• NW 48th Street, Raymond South, Bridge F-44, Bridge, Grading, Culverts, Paving, Guardrail, etc. STPD-BR-34-6(133)
B-2
List of Projects Agent : Lancaster County Engineering Project Project Number Title
1. SW 40th Street - Lincoln West, Bridge - L-218 2. West Denton Road - SW 56th Street to SW 12th Street 3. South 68th Street, R.R. Viaduct 4. North 14th Street - Lincoln North, Bridge F - 88 5. Panama Road - Hickman Southeast, X - 117
6. West Raymond Road - Raymond East, Bridge C - 91 7. South 68th Street – Hickman North, Hickman Road to Roca Road 8. Agnew Road, - Waverly Northwest, Bridge A – 136 9. Waverly SE Bridge on Fletcher Ave. over a small stream., 10. Malcolm SE Bridge on NW 98th Street over Middle Creek 11. West Sprague Road Bridge over Salt Creek B-3
!!
!!
!!
!!
!!12T
N
T
N11
T
N10
T
N9
T
N8
T
N7
R 5 E R 6 E R 7 E R 8 E
12T
N
T
N11
T
N10
T
N9
T
N8
T
N7
R 5 E R 6 E R 7 E R 8 E
S. 19
0th S
T.
S. 17
6th S
T.
S. 16
2nd S
T.
S. 14
8th S
T.
S. 13
4th S
T.
S. 12
0th S
T.
S. 11
0th S
T.
S. 96
th ST
.
S. 82
nd ST
.
S. 68
th ST
.
S. 54
th ST
.
S. 38
th ST
.
S. 25
th ST
.
S. 12
th ST
.
S.W. 2
nd S
T.
S.W. 1
4th S
T.
S.W. 2
9th S
T.
S.W. 4
2nd S
T.
S.W. 5
8th S
T.
S.W. 7
2nd S
T.
S.W. 8
6th S
T.
S.W. 1
00th
ST.
S.W. 1
14th
ST.
S.W. 1
28th
ST.
S.W. 1
42nd
ST.
N. 19
0th S
T.
N. 17
6th S
T.
N. 16
2nd S
T.
N. 14
8th S
T.
N. 13
4th S
T.
N. 14
1st S
T.
N. 12
0th S
T.N.
112th
ST.
N. 98
th ST
.
N. 84
th ST
.
N. 70
th ST
.
N. 56
th ST
.
N. 40
th ST
.
N. 27
th ST
.
N. 14
th ST
.
N. 1s
t ST.
N.W.
12th
ST.
N.W.
27th
ST.
N.W.
40th
ST.
N.W.
48th
ST.
N.W.
56th
ST.
N.W.
70th
ST.
N.W.
84th
ST.
N.W.
98th
ST.
N.W.
105th
ST.
N.W.
112th
ST.
N.W.
126th
ST.
N.W.
140th
ST.
24000ASHLAND RD.
22500LITTLE SALT RD.
21000AGNEW RD.
19500ROCK CREEK RD.
18000DAVEY RD.
BRANCHED OAK RD.16500
RAYMOND RD.15000
MILL RD.13500
WAVERLY RD.12000
BLUFF RD.10500
McKELVIE RD.9000
ALVO RD.7500
FLETCHER AV.6000
HAVELOCK AV.4600
ADAMS ST.3000
HOLDREGE ST.1500
000"O" ST.
"A" ST.1400
VAN DORN ST.2800
PIONEERS BLVD.4300
OLD CHENEY RD.5700
PINE LAKE RD.7000
YANKEE HILL RD.8500
10000ROKEBY RD.
11500SALTILLO RD.
BENNET RD.13000
WITTSTRUCK RD.14500
ROCA RD.16000
MARTELL RD.17500
HICKMAN RD.19000
20500STAGECOACH RD.
PANAMA RD.22000
OLIVE CREEK RD.23500
PRINCETON RD.25000
PELLA RD.26500
FIRTH RD.28000
29500GAGE RD.W. GAGE RD.
29500
W. HALLAM RD.28000
W. PELLA RD.26500
25000W. PRINCETON RD.
W. OLIVE CREEK RD.23500
W. PANAMA RD.22000
20500W. STAGECOACH RD.
W. SPRAGUE RD.19000
W. MARTELL RD.17500
W. ROCA RD.16000
W. WITTSTRUCK RD.14500
W. BENNET RD.13000
W. SALTILLO RD.11500
W. ROKEBY RD.10000
W. YANKEE HILL RD.8500
W. DENTON RD.7000
W. OLD CHENEY RD.5700
W. PIONEERS BLVD.4300
W. VAN DORN ST.2800
W. "A" ST.1400
W. "O" ST.000
W. HOLDREGE ST.1500
W. ADAMS ST.3000
W. SUPERIOR ST.4600
W. FLETCHER AV.6000
W. ALVO RD.7500
W. McKELVIE RD.9000
W. BLUFF RD.10500
W. WAVERLY RD.12000
W. MILL RD.13500
W. RAYMOND RD.15000
W. BRANCHED OAK RD.16500
W. DAVEY RD.18000
W. ROCK CREEK RD.19500
W. AGNEW RD.21000
22500W. LITTLE SALT RD.
W. ASHLAND RD.24000
Lincoln
Davey
MalcolmWaverly
Bennet
Firth
Sprague
Roca
Denton
Hickman
Panama
Hallam
Raymond
2
7
3
8
6
5
4
1
Lincoln TIP (County Projects)2006-2012
Public Works & UtilitiesEngineering Services
Lincoln's Future Service Limit Shown as Grey
µ 0 2.5 5 7.5Miles
LEGEND
Map Prepared by
ES GIS Section !! Bridge ##* Interchange "" Noise Walls Road Improvement
Prepared By: WSMRNAPrinting Date: April 25, 2006
File: N:\Major Projects\TIP\2006\TIP_2006_8x11-County.mxd
2007-2012 LINCOLN CITY/LANCASTER COUNTY, NEBRASKA AGENCY: Lancaster County FORM A
TRANSPORTATION IMPROVEMENT PROGRAM DIVISION: County Engineer
(1) (2) (3) (4)
PROJECT PROGRAMMED EXPENDITURES & FUNDING SOURCES (FS) (000’s)
PROJ (Location & Distance) PRIORITY PROJECTS OUT YEAR PROJECTS
NO (Improvement Description) (Work PROJ
(Map) (Control Number) (Project Number) Phase) PRIO 2006-07 FS 2007-08 FS 2008-09 FS 2009-10 FS 2010-11 FS 2011-12 FS
1 SW 40th Street - Lincoln West 797.7 BR
Bridge - L-218 49.8 NE
Bridge, Grading, Culverts, Guardrail, etc. 149.6 CO
STPN-BR-TMT-5267(1) 0.2 Miles
TOTAL 997.1
2 West Denton Road - Denton East 1,400.0 PE
SW 56th Street to SW 12th Street 350.0 CO
Reconstruct roadway
STPE-3305(9) 3.0 Miles
TOTAL 1,750.0
3 South 68th Street Railroad Viaduct 71.0 RT 325.0 RT 4,757.0 RT
Bridge, Grading, Paving, Culverts, Guardrail, etc.
C55-S-401(6) 1.0 Miles
TOTAL 71.0 0.0 325.0 4,757.0
4 North 14th Street - Lincoln North 571.7 BR
Bridge F - 88 35.7 NE
Bridge, Grading, Paving, Culverts, Guardrail, etc. 107.2 CO
BR-3405(5) 0.2 Miles
TOTAL 714.6
5 Panama Road - Hickman Southeast 552.4 BR
Bridge X-117 34.5 NE
Bridge, Grading, Culverts, Guardrail, etc. 103.6 CO
C.N. 12762 BR-3270(4) 0.2 Miles
TOTAL 690.5
6 West Raymond Road - Raymond East 131.0 BR
Bridge C - 91 32.8 SO
Bridge, Grading, Paving, Culverts, Guardrail, etc.
C.N.12402 BH-3370(2) 0.2 Miles
TOTAL 163.8
7 South 68th Street - Hickman North
Hickman Road to Roca Road 720.0 PE
Reconstruct Roadway 180.0 CO
STPE-3265(7) 1.5 Miles
TOTAL 900.0
8 Agnew Road - Waverly Northwest 247.6 BR
Bridge A-136 15.5 NE
Bridge, Grading, Culverts, Guardrail, etc. 46.4 CO
BR-3380(4) 0.2 Miles
TOTAL 309.5
9 Waverly SE Bridge, on Fletcher Ave
Bridge Replacement CN12865 20.0 BR
TOTAL 20.0
10 Malcolm SE Bridge on NW 98th Street over Middle Creek
Bridge Replacement CN12864 25.0 BR
TOTAL 25.0
11 West SPrague Road Bridge over Salt Creek
Bridge Replacement CN12786 20.0 BR
TOTAL 20.0
Date Submitted : April 24, 2006 Date Revised: June13, 2006 Page B-5 (a)
FORM B
(5) (6) (7) (8) (9) (10) (11) (1)
COST TOTAL COST BREAKDOWNS FOR SIX-YEAR EXPENDITURES (000’s)
TOTAL FOR BEYOND PRIOR PROJ COST COMP STATUS PROJ
SIX YEARS 2011-12 APPROPRIATIONS (000’s) PLAN OF PRELIM FINAL LAND EQUIPMENT/ OTHER NO
(000’s) (000’s) (000’s) YEAR FS (5)+(6)+(7) CONFORM PLANS PLANS PLANS ACQUISITION CONST FURNISHING (Explain) (Map)
997.1 None None 997.1 GCP 1
1,750.0 None None 1,750.0 GCP 2
5,153.0 None 7.1 None 5,160.1 GCP 3
714.6 None None 714.6 GCP 4
690.5 None 12.0 None 702.5 GCP 5
163.8 None None 163.8 GCP 6
900.0 None 35.0 935.0 GCP 7
309.5 None None 309.5 GCP 8
324.0 324.0 9
638.0 638.0 10
540.0 540.0 11
Page B-5 (b)
2007-2012 LINCOLN CITY/LANCASTER COUNTY, NEBRASKA AGENCY: Lancaster County FORM A
TRANSPORTATION IMPROVEMENT PROGRAM DIVISION: County Engineer
(1) (2) (3) (4)
PROJECT PROGRAMMED EXPENDITURES & FUNDING SOURCES (FS) (000’s)
PROJ (Location & Distance) PRIORITY PROJECTS OUT YEAR PROJECTS
NO (Improvement Description) (Work PROJ
(Map) (Control Number) (Project Number) Phase) PRIO 2006-07 FS 2007-08 FS 2008-09 FS 2009-10 FS 2010-11 FS 2011-12 FS
FEDERAL FUNDING: IM (Interstate Maintenance) 0.0 0.0 0.0 0.0 0.0 0.0
BR (Bridge Replacement) 1,110.3 552.4 0.0 702.7 0.0 0.0
PE (STPE - Non-Urban Area) 1,400.0 0.0 0.0 720.0 0.0 0.0
PC (STPPC - Urban Area) 0.0 0.0 0.0 0.0 0.0 0.0
PD (STPD - Sub-Allocation, State) 0.0 0.0 0.0 0.0 0.0 0.0
PM (STPM - Sub-Allocation, Protective Devices) 0.0 0.0 0.0 0.0 0.0 0.0
PP (STPP - Sub-Allocation, Safety) 0.0 0.0 0.0 0.0 0.0 0.0
NH (National Highway System) 0.0 0.0 0.0 0.0 0.0 0.0
SUB-TOTAL FEDERAL FUNDING: 2,510.3 552.4 0.0 1,422.7 0.0 0.0
STATE FUNDING: NE (State Revenue / Aids) 65.3 0.0 0.0 68.5 0.0 0.0
SUB-TOTAL STATE FUNDING: 65.3 0.0 0.0 68.5 0.0 0.0
LOCAL FUNDING: CO (Lancaster County) 396.4 103.6 0.0 287.2 0.0 0.0
RT (Railroad Trans. Safety District) 71.0 34.5 325.0 4,757.0 0.0 0.0
SUB-TOTAL LOCAL FUNDING: 467.4 138.1 325.0 5,044.2 0.0 0.0
TOTAL: 3,043.0 690.5 325.0 6,535.4 0.0 0.0
NOTE:For planning purposes, these projects have been accepted by the County. Substitution of categories of federal funds are acceptable and will not require a TIP revision.
Date Submitted : April 24, 2006 Date Revised: June13, 2006 Page B-6 (a)
FORM B
(5) (6) (7) (8) (9) (10) (11) (1)
COST TOTAL COST BREAKDOWNS FOR SIX-YEAR EXPENDITURES (000’s)
TOTAL FOR BEYOND PRIOR PROJ COST COMP STATUS PROJ
SIX YEARS 2011-12 APPROPRIATIONS (000’s) PLAN OF PRELIM FINAL LAND EQUIPMENT/ OTHER NO
(000’s) (000’s) (000’s) YEAR FS (5)+(6)+(7) CONFORM PLANS PLANS PLANS ACQUISITION CONST FURNISHING (Explain) (Map)
0.0 0.0
2,300.4 2,300.4
2,120.0 2,120.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
4,420.4 4,420.4
133.8
133.8 133.8
787.2
5,187.5
5,974.7 5,974.7
10,528.9 10,528.9
Page B-6 (b)