Utah Statewide Growth Trends

Strategic Goals Take care of what we have

Make the system work better

Improve safety

Increase capacity

Preserve Infrastructure

Optimize Mobility

Improve Safety

Strengthen the Economy

Preserve Infrast Preserve Infrastructure

Pavement Conditions

3 Maintenance Levels to Prioritize Resources Interstate and Level 1

• 53% of all State Highway Lane Miles

• 96% of all Vehicle Miles Traveled on State System

Level 2 • Less than 2,000 vehicles

per day

Condition of Utah State Roads

• Overall Condition of UDOT Highways are Good

• Majority of Roads in Poor Condition are Low Volume/Rural (Level 2)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

% o

f Mile

s

Ride Quality - Projected with 60 million / year

% Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (95 to 98%)

Pavement Condition

Historical – Projected

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

% o

f Mile

s

Ride Quality - Projected with 90 million / year

% Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (90 to 95%)

(Interstate – 935 miles) (Level 1 – 2,185 miles)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

% o

f Mile

s

Ride Quality – Projected at Current Funding Levels

% Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%)

Pavement Condition

Historical – Projected (Level 2 – 2,735 miles)

Over 500 centerline miles in poor condition today At current funding levels, poor condition roads double by 2020

Pavement Condition

Historical – Projected (Level 2 – 2,735 miles) (Level 2 – 2,735 miles)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

% o

f Mile

s

Ride Quality – Projected at Current Funding Levels

% Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

% o

f Mile

s

Ride Quality - Projected with an Additional 40 million / year *

% Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%)

* Governor’s proposed 2013 budget

Condition of UDOT Bridges

Age Distribution

Optimize Mobility Optimize

Mobility

Delay Along the Wasatch Front Davis, Weber, Salt Lake & Utah Counties

Mountain View Corridor 15 miles under construction

All 22 bridges and structures complete or underway

Mountain View Corridor Sections of pavement, curb, gutter, and trails placed

Completion date – December 2012

Midas Creek at the start of construction

Midas Creek Dec. 2011

I-15 CORE 24 miles, 10 interchanges, 63 bridges

35-month schedule makes this the fastest billion-dollar project in U.S. history

On schedule for Dec. 2012 completion

Construction Progress 75% complete

95% of traffic on new concrete

2 million square yards of concrete placed

Southern Parkway

Southern Parkway I-15 to airport complete

7 miles of new road

Future – St. George Airport to Sand Hollow Reservoir

West Davis

EIS began: Jan 2010

EIS funding: $8 mil

Aug 2010 - 46 Alt

West Davis

Sept 2011 8 alternatives and options

9 Open houses

5,000 public comments

Draft EIS late summer 2012

Annual User Hours and Cost Savings H

ours

of u

se

Improve Safety Improve Safety

Zero Fatalities

A Goal We Can All Live With

Interstate Serious Injury and Fatal Crashes Engineering Solutions | Saving Lives

Interstate Serious Injury and Fatal Crashes Involving a Vehicle that Crossed the Median

vs Total Miles of Cable Barrier Installed

Strength EconomStrengthen

the Economy

Economic Impact

Number of contractor and consultant companies

(P rimes and S ubs )

602 Private sector employees

associated with current construction projects

13,063

Strengthen the Economy

Accelerated Techniques

Accomplishments 2012 Finishing 28 projects worth more than $3 billion