CAT BOSS

OPERATING INSTRUCTIONS

It is important that tools are

hydro-tested prior to each use.

Do not modify, change or adapt

any other equipment to these

tools. Do not use in confined

spaces. Do not use any

leverage device or pipe wrench

to assist tool.

• 1. Connect nitrogen hose

(with swivel) to tool.

• 2. Be certain packing

gland is tight and will not

leak during use.

• 3. Close vent valve (1/4

turn ball valve on side of

tool)

• 4. With tool fully

retracted, attach tool to

process connection.

Tighten sufficiently to

prevent leaks. Open

nitrogen supply to tool.

• 5. Open process valve

and check for leaks. If

any leaks, immediately

close process valve. If

no leaks appear, open

process valve to the full

open position.

• 6. Rotate ratchet handle

and push fully into

process

• 7. Open vent valve to

allow catalyst to be

removed from aeration

tap.

• 8. When aeration tap has

been cleared, there will

be no catalyst debris

venting from valve.

• 9. Close vent valve and

retract tool fully. When

fully retracted the

process valve can be

closed and the tool

removed from the

process connection.

NITROGEN FLOW

NITROGEN FLOW

1. connect

nitrogen

hose

2. check for

leaks at

packing

gland 3. close valve

4. attach tool to process

5. open process valve

6. rotate ratchet

handle and push

fully into process

NITROGEN FLOW

7. Open valve and vent catalyst debris