Mining Business Managementfor Cost Reduction () 2551
Mining Business Mission
(Cost Reduction) VC FC FO DP IC TC Vop or Economic Scale OEE (Income Improvement) price Other Income new product/new services Value Added (Opportunity Search) ( )
(Price) (Quality Upgrade) (Recovery) (Zero Waste)
Management Systemsconcern Cost Reduction
1) 2) 3) 4) 5) Performance Index ( TQM )
TPM TQM Why-Why Analysis Cause and Effects Diagram Fact and Data ManagementDOEBalance ScorecardsLoss Tree AnalysisInventory Control
Loss Management
7 Wastes overproduction: producing more, sooner and faster than required by the next process excess transportation: any transport that adds cost but no value to the product excess inventory: this not only is a waste, but also creates waste excess processing: doing more work than necessary waiting: operator or machine idle time correction: repairs to products motion: walking or wasted motion to pick up or store parts.
(Loss Definition) (Loss Tree) (Priority) (Feasibility Study) (Project Setting) (Action Plan) (Review) (Zero Loss)
Quarry Loss Reduction
- - - - - - - - () - - - - ? Check - #5 - Dump -
- 45 - - - - - - Dump - ? - - Just in time - - - Bio-diesel - - - OT - >>> CR CR >>> - OEE
- CD - - Double Handing - - - - - - PDCA -
Cost Reduction Principle
() =
- -
()
1: 2: 3: 4:
= () ()
e-commerce
- () - 3 Mu Muri= Muda= Mura= 3 Mu = () / () QC Story
Good Mining Plan for Cost Reduction
Mining Design for Cost Reduction
Mining Operation Excellence
() Waste Blending for Cost Reduction1. % 2. 25 % 3. Operator % 4. % 35%
Crushing Effectiveness
/. / . / . / / / / / . / . , ,
(/.) Spec. 750/. 543/.207/. - / /. Spec. 750 /. X 100 .= 75,000 543 /. X 138 .= 75,000 38 / (Downtime)
() () () Output16:00 .08:00 .
PM PM
/ .
/ / /
/. () GAP () /.
3
Excavation and Transportation
- /.- Metal Detector Grinding Path - -
- /.- /. - /.- 3 2 1 /.
- ( C) /. () /. - ( B) () /.- ( A) /. /.
- A B B C /. - C A B /.- /. -
- /.- - - - - /.-
- - /. -
- /.- /.-
- /.- /.- - /.
- /.- /. ( - ()
- /. Impact Plate Peak Load - Impact Plate /. - /.
- - Impact Plate /.- Grinding Path /. /. 25 . - GAP /. ()
Conveyor Excellence
- - /.- - /.- /.
- /.- /. - /.
Pile Stocking
- /. /. -
- /. /. /.- - ()
Products Delivery
/ (Bin and Stock Pile) (Stock and Loader) (Stacker and Reclaimmer)
- - - - 25,000 /. /. - /.
Maintenance Effectiveness
(Mine Machine) (Support Function) (Crushing Plant) (ME, EE, CE) (Miscellneous)
- - Downtime - PM
- (Condition Base) (Time Base) 5,000 . 50 - - - - - (Standby) - - (Failure Analysis) - - (Service Contract) - -
Machine Utilization
(% Utility) 50 % Utility
- - - - - 1 2 3 3 Pressure Loss
Spare Parts Management
Just in Time
Manpower Management
Competency
Energy Management
NGV Off Peak On Peak Demand Charge Energy Charge Peak Fuel Max Tejohn
Overtime Management
1. 2. OT 3. (Break Down) 4. ( Multi-skill) 5. 6. 7. 8. 3 9. 10. 7 3 11. 12. OT 13. 14. OT 15. 16. 17. 18. 90 19. OT 20. OT OT 21.
1) 2) OT (% OT ) 3) 4) ( MA) 5) (Multi-skill) 6) OT 7) 8) 1 07:00 - 15:00 . 2 16:00-24:00 . 15:00 - 16:00 . 9) OT 10)
1) Inpit Crusher Semi Mobile Crusher 2) / 3) 1 3 2 7 6 4) " 45,000 5,000 / 10,000 / () 5) 6) 6-10 1 24 7) 35 / 90 / 90 / 120 / 8)
Blasting Cost Reduction
Pentolite Emulsion Delay
Others Cost Reduction
www.budmgt.comBudding Wisdom in Management