Post on 31-Jul-2020
2017 FACILITY ASSESSMENT BOARD UPDATE
S C O P E O F W O R K
NON-INVASIVE VISUAL ASSESSMENT AND ASSOCIATED REPORT FOR: • BETTENDORF HIGH SCHOOL
• BETTENDORF MIDDLE SCHOOL
• EDISON ACADEMY
• HERBERT HOOVER ELEMENTARY SCHOOL
• MARK TWAIN ELEMENTARY SCHOOL
• PAUL NORTON ELEMENTARY SCHOOL
• THOMAS JEFFERSON ELEMENTARY SCHOOL
DID NOT INSPECT THE FOLLOWING: • GRANT WOOD ELEMENTARY SCHOOL
• NEIL ARMSTRONG ELEMENTARY SCHOOL
T E A M C O N F I G U R AT I O N
ASSESSMENT OF INTERIOR FINISHES,
EXTERIOR BUILDING ENVELOPE AND ROOFS.
ASSESSMENT OF MECHANICAL, ELECTRICAL,
PLUMBING, AND FIRE PROTECTION SYSTEMS.
ASSESSMENT OF EXTERIOR HARD SURFACES
SUCH AS PARKING LOTS, SIDEWALKS, ETC.
INVESTIGATION OF POTENTIAL COSTS
RELATED IMPROVEMENTS INDICATED IN
REPORTS.
EXISTING BUILDING
FACILITY
ASSESSMENT
O V E R V I E W O F P R O C E S S
MASTER PLANNING OF
POTENTIAL DISTRICT
IMPROVEMENTS
LONG TERM
FACILITY PLAN
FA C I LT Y A S S E S S M E N T D E L I V E R A B L E
O V E R A L L A N A LY S I S
“BUILDINGS HAVE GOOD BONES”
B E T T E N D O R F H I G H S C H O O L
BOILER REPLACEMENT FULL HVAC SYSTEM REPLACEMENT
(EXCEPT PAC ADDITION)
B E T T E N D O R F H I G H S C H O O L
POOL SETTLEMENT AND HVAC CONCERN
(F WING HEATING ONLY CREATING HUMIDITY
ISSUES
B E T T E N D O R F H I G H S C H O O L
FLOODING IN CONNECTING LINK
AREA 1 PARKING LOT RESURFACING
B E T T E N D O R F H I G H S C H O O L
B100 FIREPROOFING COMPROMISED
WINDOW REPLACEMENT (D100 & E100) NON-THERMALLY BROKEN FRAMES
CARPET REPLACEMENT (B100, B200, D100, D200)
B E T T E N D O R F M I D D L E S C H O O L
REPLACE GYM ROOFTOP UNITS AND ADD DUCTWORK INSULATION
B E T T E N D O R F M I D D L E S C H O O L
PARTIAL ROOF REPLACEMENT – (ORANGE); SEAM/FLASHING FAILURES, WET INSULATION
B E T T E N D O R F M I D D L E S C H O O L
STRUCTURAL CONCERN AT WING WALL (4W, 5W & 6W)
WINDOW REPLACEMENT ORIGINAL BUILDING
CASEWORK REPLACEMENT IN SCIENCE AREAS
EXHAUST AT LASER
CUTTER
TOILET PARTITION REPLACEMENT
E D I S O N A C A D E M Y
EGRESS AND FIRE RATING CONCERNS
ROOF EXHAUST DUCTWORK
REPLACEMENT
EXTERIOR LIGHT REPLACEMENT
E D I S O N A C A D E M Y
PARTIAL ROOF REPLACEMENT – (ORANGE); SEAM/FLASHING FAILURES, WET INSULATION
H E R B E R T H O O V E R E L E M E N TA R Y S C H O O L
SITE DRAINAGE ISSUE WITH RUNOFF EROSION
H E R B E R T H O O V E R E L E M E N TA R Y S C H O O L
PARTIAL ROOF REPLACEMENT – (RED & ORANGE)
• PLANT GROWTH ON ROOF
• INSULATION CUPPED MEANING WATER INFILTRATION
• INSULATION NOT SECURED
• ROOF CURRENTLY HELD BY FASTENING BAR
H E R B E R T H O O V E R E L E M E N TA R Y S C H O O L
WINDOW REPLACEMENT (SINGLE PANE) ORIGINAL BUILDING
CARPET REPLACEMENT ORIGINAL BUILDING
SECURE ENTRANCE
GYM CEILING CONCERNS
M A R K T W A I N E L E M E N TA R Y S C H O O L
TUNNEL WATER INFILTRATION
BASEMENT WATER INFILTRATION CONCERN
M A R K T W A I N E L E M E N TA R Y S C H O O L
PARTIAL ROOF REPLACEMENT – (ORANGE). SEAM/FLASHING FAILURES WITH WET INSULATION
M A R K T W A I N E L E M E N TA R Y S C H O O L
CARPET AND LIGHT REPLACEMENT THROUGHOUT
SECURE ENTRANCE INTERCOM AND BELL SYSTEM REPLACEMENT
PA U L N O R T O N E L E M E N TA R Y S C H O O L
EXTERIOR HOLLOW METAL FRAME REPLACEMENT AT MAIN ENTRANCE
SECURE ENTRANCE UPGRADES
PA U L N O R T O N E L E M E N TA R Y S C H O O L
SATURATED CEILING TILES
PLUG MOLD BY SINK DATED CASEWORK
TOILET ROOM TILE REPLACEMENT
CARPET REPLACEMENT
T H O M A S J E F F E R S O N E L E M E N TA R Y S C H O O L
FULL ROOF REPLACEMENT
T H O M A S J E F F E R S O N E L E M E N TA R Y S C H O O L
GYM CEILING CONCERNS
NEW SECURE ENTRANCE
KITCHEN UPGRADES
T H O M A S J E F F E R S O N E L E M E N TA R Y S C H O O L
WINDOW AND SOFFIT REPLACEMENT STORAGE/ELECTRICAL ROOM FIRE RATING CONCERNS
S U M M A R Y
BUILDING “BONES” ARE IN GOOD SHAPE.
POTENTIAL PRIORITIES: • HIGH SCHOOL HVAC ~$3M TO $5M.
• MIDDLE SCHOOL GYM HVAC ~$700K
• MARK TWAIN TUNNELS - TBD
• THOMAS JEFFERSON ROOFING/SOFFITS ~$425K
• SECURE ENTRANCES (T.J., NORTON, TWAIN, HOOVER) – TBD
• HIGH SCHOOL POOL SETTLEMENT - TBD
• HIGH SCHOOL EXTERIOR TUNNEL FLOODING ~$100K
• PARTIAL ROOF REPLACEMENTS (HOOVER, EDISON, MS, HS) ~$800K
N E X T S T E P S
• CONFIRM FACILITY ASSESSMENT BUDGET ITEMS PER SCHOOL IN
CONJUNCTION WITH ESTES CONSTRUCTION.
• MEET WITH DISTRICT ADMINISTRATORS TO PRIORITIZE POTENTIAL
DISTRICT IMPROVEMENTS. (8/29/17)
• COLLABORATE WITH DISTRICT TO IDENTIFY POTENTIAL BUDGET FOR
ALL LONG TERM FACILITY PROJECTS.
• COLLABORATE WITH DISTRICT TO PRIORITIZE FACILITY AND
POTENTIAL DISTRICT IMPROVEMENTS.
Q U E S T I O N S