2017 FACILITY ASSESSMENT BOARD UPDATE
![Page 2: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/2.jpg)
S C O P E O F W O R K
NON-INVASIVE VISUAL ASSESSMENT AND ASSOCIATED REPORT FOR: • BETTENDORF HIGH SCHOOL
• BETTENDORF MIDDLE SCHOOL
• EDISON ACADEMY
• HERBERT HOOVER ELEMENTARY SCHOOL
• MARK TWAIN ELEMENTARY SCHOOL
• PAUL NORTON ELEMENTARY SCHOOL
• THOMAS JEFFERSON ELEMENTARY SCHOOL
DID NOT INSPECT THE FOLLOWING: • GRANT WOOD ELEMENTARY SCHOOL
• NEIL ARMSTRONG ELEMENTARY SCHOOL
![Page 3: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/3.jpg)
T E A M C O N F I G U R AT I O N
ASSESSMENT OF INTERIOR FINISHES,
EXTERIOR BUILDING ENVELOPE AND ROOFS.
ASSESSMENT OF MECHANICAL, ELECTRICAL,
PLUMBING, AND FIRE PROTECTION SYSTEMS.
ASSESSMENT OF EXTERIOR HARD SURFACES
SUCH AS PARKING LOTS, SIDEWALKS, ETC.
INVESTIGATION OF POTENTIAL COSTS
RELATED IMPROVEMENTS INDICATED IN
REPORTS.
![Page 4: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/4.jpg)
EXISTING BUILDING
FACILITY
ASSESSMENT
O V E R V I E W O F P R O C E S S
MASTER PLANNING OF
POTENTIAL DISTRICT
IMPROVEMENTS
LONG TERM
FACILITY PLAN
![Page 5: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/5.jpg)
FA C I LT Y A S S E S S M E N T D E L I V E R A B L E
![Page 6: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/6.jpg)
O V E R A L L A N A LY S I S
“BUILDINGS HAVE GOOD BONES”
![Page 7: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/7.jpg)
B E T T E N D O R F H I G H S C H O O L
BOILER REPLACEMENT FULL HVAC SYSTEM REPLACEMENT
(EXCEPT PAC ADDITION)
![Page 8: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/8.jpg)
B E T T E N D O R F H I G H S C H O O L
POOL SETTLEMENT AND HVAC CONCERN
(F WING HEATING ONLY CREATING HUMIDITY
ISSUES
![Page 9: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/9.jpg)
B E T T E N D O R F H I G H S C H O O L
FLOODING IN CONNECTING LINK
AREA 1 PARKING LOT RESURFACING
![Page 10: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/10.jpg)
B E T T E N D O R F H I G H S C H O O L
B100 FIREPROOFING COMPROMISED
WINDOW REPLACEMENT (D100 & E100) NON-THERMALLY BROKEN FRAMES
CARPET REPLACEMENT (B100, B200, D100, D200)
![Page 11: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/11.jpg)
B E T T E N D O R F M I D D L E S C H O O L
REPLACE GYM ROOFTOP UNITS AND ADD DUCTWORK INSULATION
![Page 12: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/12.jpg)
B E T T E N D O R F M I D D L E S C H O O L
PARTIAL ROOF REPLACEMENT – (ORANGE); SEAM/FLASHING FAILURES, WET INSULATION
![Page 13: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/13.jpg)
B E T T E N D O R F M I D D L E S C H O O L
STRUCTURAL CONCERN AT WING WALL (4W, 5W & 6W)
WINDOW REPLACEMENT ORIGINAL BUILDING
CASEWORK REPLACEMENT IN SCIENCE AREAS
EXHAUST AT LASER
CUTTER
TOILET PARTITION REPLACEMENT
![Page 14: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/14.jpg)
E D I S O N A C A D E M Y
EGRESS AND FIRE RATING CONCERNS
ROOF EXHAUST DUCTWORK
REPLACEMENT
EXTERIOR LIGHT REPLACEMENT
![Page 15: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/15.jpg)
E D I S O N A C A D E M Y
PARTIAL ROOF REPLACEMENT – (ORANGE); SEAM/FLASHING FAILURES, WET INSULATION
![Page 16: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/16.jpg)
H E R B E R T H O O V E R E L E M E N TA R Y S C H O O L
SITE DRAINAGE ISSUE WITH RUNOFF EROSION
![Page 17: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/17.jpg)
H E R B E R T H O O V E R E L E M E N TA R Y S C H O O L
PARTIAL ROOF REPLACEMENT – (RED & ORANGE)
• PLANT GROWTH ON ROOF
• INSULATION CUPPED MEANING WATER INFILTRATION
• INSULATION NOT SECURED
• ROOF CURRENTLY HELD BY FASTENING BAR
![Page 18: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/18.jpg)
H E R B E R T H O O V E R E L E M E N TA R Y S C H O O L
WINDOW REPLACEMENT (SINGLE PANE) ORIGINAL BUILDING
CARPET REPLACEMENT ORIGINAL BUILDING
SECURE ENTRANCE
GYM CEILING CONCERNS
![Page 19: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/19.jpg)
M A R K T W A I N E L E M E N TA R Y S C H O O L
TUNNEL WATER INFILTRATION
BASEMENT WATER INFILTRATION CONCERN
![Page 20: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/20.jpg)
M A R K T W A I N E L E M E N TA R Y S C H O O L
PARTIAL ROOF REPLACEMENT – (ORANGE). SEAM/FLASHING FAILURES WITH WET INSULATION
![Page 21: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/21.jpg)
M A R K T W A I N E L E M E N TA R Y S C H O O L
CARPET AND LIGHT REPLACEMENT THROUGHOUT
SECURE ENTRANCE INTERCOM AND BELL SYSTEM REPLACEMENT
![Page 22: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/22.jpg)
PA U L N O R T O N E L E M E N TA R Y S C H O O L
EXTERIOR HOLLOW METAL FRAME REPLACEMENT AT MAIN ENTRANCE
SECURE ENTRANCE UPGRADES
![Page 23: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/23.jpg)
PA U L N O R T O N E L E M E N TA R Y S C H O O L
SATURATED CEILING TILES
PLUG MOLD BY SINK DATED CASEWORK
TOILET ROOM TILE REPLACEMENT
CARPET REPLACEMENT
![Page 24: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/24.jpg)
T H O M A S J E F F E R S O N E L E M E N TA R Y S C H O O L
FULL ROOF REPLACEMENT
![Page 25: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/25.jpg)
T H O M A S J E F F E R S O N E L E M E N TA R Y S C H O O L
GYM CEILING CONCERNS
NEW SECURE ENTRANCE
KITCHEN UPGRADES
![Page 26: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/26.jpg)
T H O M A S J E F F E R S O N E L E M E N TA R Y S C H O O L
WINDOW AND SOFFIT REPLACEMENT STORAGE/ELECTRICAL ROOM FIRE RATING CONCERNS
![Page 27: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/27.jpg)
S U M M A R Y
BUILDING “BONES” ARE IN GOOD SHAPE.
POTENTIAL PRIORITIES: • HIGH SCHOOL HVAC ~$3M TO $5M.
• MIDDLE SCHOOL GYM HVAC ~$700K
• MARK TWAIN TUNNELS - TBD
• THOMAS JEFFERSON ROOFING/SOFFITS ~$425K
• SECURE ENTRANCES (T.J., NORTON, TWAIN, HOOVER) – TBD
• HIGH SCHOOL POOL SETTLEMENT - TBD
• HIGH SCHOOL EXTERIOR TUNNEL FLOODING ~$100K
• PARTIAL ROOF REPLACEMENTS (HOOVER, EDISON, MS, HS) ~$800K
![Page 28: 2017 FACILITY ASSESSMENT BOARD UPDATE Handout B · 2017 facility assessment . board update . handout b. scope of work . non-invasive visual assessment and associated report for: •](https://reader034.fdocuments.in/reader034/viewer/2022050407/5f84343de765fd0748294c95/html5/thumbnails/28.jpg)
N E X T S T E P S
• CONFIRM FACILITY ASSESSMENT BUDGET ITEMS PER SCHOOL IN
CONJUNCTION WITH ESTES CONSTRUCTION.
• MEET WITH DISTRICT ADMINISTRATORS TO PRIORITIZE POTENTIAL
DISTRICT IMPROVEMENTS. (8/29/17)
• COLLABORATE WITH DISTRICT TO IDENTIFY POTENTIAL BUDGET FOR
ALL LONG TERM FACILITY PROJECTS.
• COLLABORATE WITH DISTRICT TO PRIORITIZE FACILITY AND
POTENTIAL DISTRICT IMPROVEMENTS.