14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS...

Post on 15-Mar-2018

226 views 2 download

Transcript of 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS...

14.1.1

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15

1 Dallirajahara-Jagdalpur (235 km) Cap. 5,00

EBR 20,00,00

2 Wadsa-Gadchiroli (49.5 km) Cap. 4,00,00

EBR 10,00,00

3 Raigarh (Mand Colliery) - Bhupdeopur (63 km) EBR 1,00

4 Gevra Road - Pendra Road (121.70 km) EBR 1,00

5 Barwadih - Chirmiri (182 km) Cap. ..

6 Raipur - Jharsuguda (310 km) Cap. ..

TOTAL-WORKS IN PROGRESS Cap. 4,05,00

EBR 30,02,00

TOTAL-New Lines (Construction) Cap. 4,05,00

EBR 30,02,00

7 Jabalpur-Gondia incl. Balaghat-Katangi (285 km) Cap. 100,10,00

C.Fund ..

8 Chhindwara-Nagpur (149.522 km) Cap. 124,38,37

9 Chhindwara-Mandla Fort (182.25 km) Cap. 31,99,62

10 Nagbhir - Nagpur (106 km) Cap. 1

TOTAL-WORKS IN PROGRESS Cap. 256,48,00

TOTAL-Gauge Conversion Cap. 256,48,00

11 Bilaspur-Urkura (110 km) Cap. ..

C.Fund ..

Dep(RVN) 8,95,00

12 Bilaspur-Salka Road - Patch doubling (39.4 km) Cap. 2,46,47

EBR ..

13 Salka Road-Khongsara - Patch doubling (26 km) Dep(RVN) 10,89,00

14 Khodri-Anuppur, with flyover at Bilaspur (61.6 km) C.Fund ..

Dep(RVN) 10,00,00

15 Champa - Bypass line Cap. 2,29,24

16 Kalumna-Nagpur Cap. 3,31,29

17 Champa-Jharsuguda - 3rd line (165 km) Cap. 149,00,00

EBR ..

18 Durg-Rajnandgaon - 3rd line Cap. 20,00,00

TOTAL-WORKS IN PROGRESS Cap. 177,07,00

Dep(RVN) 29,84,00

TOTAL-Doubling Cap. 177,07,00

Dep(RVN) 29,84,00

AllocationParticulars

NEW LINES (CONSTRUCTION)

A - Works in Progress

GAUGE CONVERSION

A - Works in Progress

DOUBLING

A - Works in Progress

14.1.2

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

19 Itwari - Addl loop lines (2 Nos) Cap. 35,40

20 Badhwabara - Conversion of stabling line into running line Cap. ..

21 Bakal - Conversion of C-class station into B-class with 4 lines Cap. 1,32,64

22 Gondia Yard - Crossover at Nagpur end to connect Chanda Fort grid DF(3) 1,49,35

23 Ib - Fly-over Cap. 42,00

24 Baraduar - Long loop line DF(3) 20,00

25 Brajrajnagar & Belpahar - Connectivity with Belpahar Open Coal Mines group

sidings

Cap. 20,00

26 Raygad - Extension of shunting neck DF(3) 1,36,50

27 Kothari Road - Long loop line DF(3) ..

28 Dumrikhurd-Ramtek - Extension of overhead equipment DF(3) 1,08,55

29 Kalumna - Goods shed line DF(3) 2,70,97

30 Shahdol - Long loop line DF(3) ..

31 Silyari - Long loop line DF(3) ..

32 Hathbandh - Long loop line DF(3) 2,73,25

33 Salwa - Long loop line DF(3) ..

34 Koka - Long loop line DF(3) ..

35 Jharridih - Addl loop line DF(3) ..

36 Parmalkasa - Conversion of C-class station to B-class DF(3) ..

37 Uslapur - Development as model goods shed DF(3) 43

38 Salwa - Conversion of C-class station into B-class with 4 lines Cap. ..

39 Bhilai - Electrification of Jamul Cement Works siding incl. yard DF(3) ..

40 Gondia-Nagpur - Automatic signalling Cap. 14,50,00

EBR ..

41 Anuppur-Katni - Intermediate block section Cap. 1,20,00

42 Mandir Hassaud - Electrification incl. yard Cap. ..

C.Fund ..

43 Kharsia - Conversion of stabling line into down loop DF(3) 35

44 Rupaund - Addl common loop to serve new goods shed Cap. 48,21

45 Mandhar - New goods terminal Cap. 88,39

46 Silyari - Addl loop DF(3) ..

47 Mudaria - Addl loop Cap. 22,80

48 Kirodimalnagar - Remodeling for dealing with addl traffic of Jindal Steel Plant Ltd

siding

Cap. 1,09

49 Bhupdeopur - Remodelling for dealing with new private sidings Cap. 2,11

EBR ..

50 Bilaspur Division - Intermediate block signalling (8 locations) DF(3) ..

51 Durg - Development of goods shed by common loop (line No 10) and better

unloading facilities

Cap. 27,98

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

A - Works in Progress

14.1.3

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

52 Bhilai - Addl. freight maintenance depot at coal empty yard with three examination

lines and one shunting neck of full length

Cap. 4,00,09

EBR ..

53 Rasamara - Down loop Cap. 22,59

54 Bhilai (Exchange Yard) - Remodelling with two addl lines by extension of dead

end

Cap. 1,57,06

55 Himgir - Addl down loop Cap. 1,07,67

56 Jamga - Yard remodelling Cap. 3,83,77

57 Ib - Addl up loop Cap. 79,20

58 Saragbundia - Conversion of goods shed siding into up loop cum down reception

line

Cap. 68,03

59 Tilda - Augmentation / improvement / addition of goods shed Cap. 69,20

60 Mudaria - Addl down loop Cap. ..

61 Bilaspur Division - Siding for stabling track machines (9 stations) DF(3) 57,00

62 Nagpur Division - Siding for track machines (6 stations) DF(3) 29,00

63 Kamptee - Addl up loop Cap. 2,10,26

64 Baradaur - Addl up loop Cap. 2,91,74

65 Maroda - New exchange yard for addl traffic of Bhilai Steel Plant Cap. 3,26,62

66 Kotarlia - Conversion of up loop into common loop Cap. 55,95

67 Works costing below Rs.2.5 crore each Cap. 59,20

DRF 18,25

DF(1) 11,17

DF(3) 10,27,42

TOTAL-WORKS IN PROGRESS Cap. 42,22,00

DRF 18,25

DF(1) 11,17

DF(3) 20,72,82

68 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(1) ..

DF(3) ..

TOTAL-NEW WORKS Cap. ..

DRF ..

DF(1) ..

DF(3) ..

TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 42,22,00

DRF 18,25

DF(1) 11,17

DF(3) 20,72,82

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

B - New Works

14.1.4

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

69 South East Central Railway - Extension of unreserved ticketing system to E-

category stations

DF(1) 1,00

70 South East Central Railway - Extension of automatic ticket vending machines Cap. 50,00

71 Bilaspur - Upgradation of infrastructure of zonal information technology centre DF(3) 13,09

72 Works costing below Rs.2.5 crore each DRF 3,17,00

DF(1) 41,17

DF(3) ..

TOTAL-WORKS IN PROGRESS Cap. 50,00

DRF 3,17,00

DF(1) 42,17

DF(3) 13,09

73 Works costing below Rs.2.5 crore each DRF ..

DF(1) ..

DF(3) ..

TOTAL-NEW WORKS DRF ..

DF(1) ..

DF(3) ..

TOTAL-Computerisation Cap. 50,00

DRF 3,17,00

DF(1) 42,17

DF(3) 13,09

74 Leased Assets - Payment of Capital component of lease charges to Indian

Railway Finance Corporation

C.Fund 252,89,00

TOTAL-WORKS IN PROGRESS C.Fund 252,89,00

TOTAL-Leased Assets - Payment of Capital Component C.Fund 252,89,00

75 Bilaspur, Nagpur & Raipur - Interlocking of level crossing gates (9, 7 & 4 Nos

respectively)

S.Fund 1,42,00

76 Champa-Korba - Elimination of all level crossing gates by grade separators S.Fund ..

77 Bilaspur Division - Manning of level crossings (15 Nos) S.Fund 10

78 South East Central Railway - Manning of unmanned level crossings (140 Nos) S.Fund 26,62

79 Works costing below Rs.2.5 crore each S.Fund 18,31,21

TOTAL-WORKS IN PROGRESS S.Fund 19,99,93

80 Works costing below Rs.2.5 crore each S.Fund ..

TOTAL-NEW WORKS S.Fund ..

TOTAL-Road Safety Works-Level Crossings. S.Fund 19,99,93

COMPUTERISATION

A - Works in Progress

B - New Works

LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT

A - Works in Progress

ROAD SAFETY WORKS-LEVEL CROSSINGS.

A - Works in Progress

B - New Works

14.1.5

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

81 Saraswati Nagar-Sarona - Limited height subway at level crossing No.420 S.Fund 1,11

82 Durg-Dallirajhara - Road over & under bridge at level crossing No.DD-10 S.Fund ..

EBR ..

83 Bilaspur-Katni - Road over & under bridge / limited height subway in lieu of level

crossing No.BK-66

S.Fund 10,00

EBR ..

84 Bilaspur Yard - Limited height subway on multi line section in lieu of

Chuchiyapara level crossing gate No.365

S.Fund 4,70

EBR ..

85 Bilaspur Yard - Road over bridge in lieu of level crossing No.366 at Tarbahar

Naka

S.Fund ..

EBR ..

86 Bhilai-Durg - Limited height subway near level crossing No.443 (Nehru Nagar

Gate)

S.Fund 1,21

87 Raipur Naka - Limited height subway in lieu of level crossing No.444 S.Fund ..

88 Kanhan-Ramtek & Tumsar road-Tirodi - Limited height subways in lieu of level

crossings (6 Nos)

S.Fund 10

89 Nainpur-Chhindwara - Limited height subways by open cut method at unmanned

level crossings (20 Nos)

S.Fund 75

90 Bhilai - Full height subway in lieu of level crosing No.439 (Sirsa Gate) S.Fund ..

EBR ..

91 Chhindwara-Nagpur - Limited height subways by open cut method at unmanned

level crossings (40 Nos)

S.Fund 10,09,67

92 Naila-Champa - Road under bridge in lieu of level crossing No.339 & 340 S.Fund 15,00

93 Amlai-Burhar - Repl of road over bridge No.BK-103/up & down S.Fund 5

94 Balaghat-Nainpur - Limited height subways by open cut method at unmanned

level crossings (27 Nos)

S.Fund ..

95 Gondia-Nagbhir - Limited height subway in lieu of level crosings (9 Nos) S.Fund 10

96 Nainpur-Jabalpur - Limited height subways by open cut method at unmanned

level crossings (13 Nos)

S.Fund 43,53

97 Mandhar-Urkura - Limited height subway in lieu of level crosing No.413 S.Fund ..

EBR ..

98 Nainpur-Mandla Fort - Limited height subways by open cut method at unmanned

level crossings (15 Nos)

S.Fund 30,00

99 Tenganmada-Khongsara - Limited height subway in lieu of level crosing No.BK-30 S.Fund 40,00

100 Gondia-Balaghat - Limited height subways by open cut method at unmanned level

crossings (24 Nos)

S.Fund ..

101 Sarona-Kumhari - Full height subway in lieu of level crosing No.429 S.Fund ..

EBR ..

102 Bramapuri-Chanda Fort - Limited height subways by open cut method at

unmanned level crossings (25 Nos)

S.Fund 8,00,00

103 Durg Yard - Full height subway in lieu of level crosing No.445 S.Fund ..

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

A - Works in Progress

14.1.6

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

104 Kanhan-Koradih - Limited height subways by open cut method at unmanned level

crossings (5 Nos)

S.Fund ..

105 Bhilai Nagar-Durg Link Block - Road over bridge in lieu of level crossing No.443

(Nehru Nagar)

S.Fund ..

EBR ..

106 Bilaspur-Katni - Road over & under bridge in lieu of level crossing No.BK-37 near

Gourela

S.Fund ..

EBR ..

107 Marauda-Risama - Road under bridge in lieu of level crossing No.DD-12 S.Fund 3,24

108 Gunderdehi-Latabor - Road under bridge in lieu of level crossing No.DD-36 S.Fund 3,24

109 Gunderdehi-Latabor - Road under bridge in lieu of level crossing No.DD-44 S.Fund 3,24

110 Balod-Kusumkasa - Road under bridge in lieu of level crossing No.DD-54 S.Fund 3,24

111 Kusumkasa-Dallirajhara - Road under bridge in lieu of level crossing No.DD-59 S.Fund 3,24

112 Kusumkasa-Dallirajhara - Road under bridge in lieu of level crossing No.DD-60 S.Fund 3,24

113 Kotma Yard - Road under bridge in lieu of level crossing No.AB-10 (Traffic) S.Fund 96,05

114 Parmalkasa-Rajnandgaon - Road under bridge in lieu of level crossing No.458 S.Fund ..

EBR ..

115 Saraswatinagar-Sarona - Full height subway in lieu of level crossing No.421

(Dumartalab Gate)

S.Fund ..

EBR ..

116 Dadhapara-Belha - Limited height subway in lieu of level crossing No.372 S.Fund 50,00

EBR ..

117 Bilaspur-Durg - Limited height subway in lieu of level crossing near G-cabin S.Fund 42

118 Bhilai Power House-Bhilainagar - Road over & under bridge in lieu of manned

level crossing No.442 (Supela Gate)

S.Fund ..

EBR ..

119 Champa-Korba - Elemination of all level crossings by grade seperators S.Fund ..

120 Bijuri Yard - Road over bridge in lieu of level crossing No.AB-18 S.Fund 21

121 Kotma-Bhaiatola - Road over bridge for closure of level crossing No.AB-11

(Traffic)

S.Fund 75,00

122 Akaltara - Road over bridge in lieu of level crossing No.353 S.Fund 2,60,69

EBR ..

123 Uslapur - Road over bridge in lieu of level crossing No BK-4 S.Fund ..

EBR ..

124 Raigarh-Kotarlia - Road over bridge at level crossing No.288 S.Fund ..

EBR ..

125 Tumsar - Road over bridge in lieu of level crossing No 532 S.Fund ..

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

14.1.7

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

126 Champa-Naila - Road over bridge in lieu of level crossing No 342 (Khoksa level

crossing)

S.Fund 4,51

EBR ..

127 Champa Yard - Road over & under bridge in lieu of level crossing No 337 S.Fund ..

EBR ..

128 Raipur-Baloda Bazar Road - Road over bridge at level crossing No.RV-5 S.Fund ..

EBR ..

129 Raigarh - Road over bridge in lieu of level crossing at km 588/13-15 S.Fund ..

EBR ..

130 Bilaspur-Gatora - Road over bridge in lieu of level crossing No.364 S.Fund 2,44,32

EBR ..

131 Ranisagar Railway - Road over bridge at level crossing at km 615/11-13 S.Fund ..

EBR ..

132 Tilda-Simga - Road under & over bridge at level crossing No.397 near Tilda

crossing (national highway No.37)

S.Fund 75,05

EBR ..

133 Bilaspur Yard Tarbahar - Normal height subway on multi line section level

crossing

S.Fund 7,08,95

134 Dadhapara-Belha - Road over & under bridge at level crossing No.370 S.Fund 9,44

EBR 3,30,00

135 Raipur Division - Road under bridge near H-cabin in lieu of level crossing No.433

& 434

S.Fund 42

136 Raipur-Titlagarh - Limited height subways in lieu of level crossing Nos.RV-4, RV-

15 & RV-19

S.Fund 42

137 Works costing below Rs.2.5 crore each S.Fund 52,36,78

TOTAL-WORKS IN PROGRESS S.Fund 87,37,92

EBR 3,30,00

138 Unchibit - Road over bridge in lieu of level crossing No.293 S.Fund ..

EBR ..

139 Works costing below Rs.2.5 crore each S.Fund ..

TOTAL-NEW WORKS S.Fund ..

TOTAL-Road Safety Works-Road Over/Under Bridges. S.Fund 87,37,92

EBR 3,30,00

140 Durg-Nagpur - TRR(P) - 71.94 km DRF 6,95,93

141 Durg-Nagpur - TRR(P) - 4.91 km DRF 64,16

142 Durg-Nagpur - SEJs (73 sets) DRF 79,04

143 Durg-Nagpur - TWR - 41.10 km DRF 35,74

144 Durg - Kachewani - TFR - 55 km DRF 50,00

145 Anuppur-Katni - TWR - 44.56 km DRF 60,00

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

B - New Works

TRACK RENEWALS

A - Works in Progress

14.1.8

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

146 Jharsuguda-Nagpur - Complete renewal of switches & crossings with thick web

switches & weldable CMS crossings on PSC layouts (200 sets)

DRF 9,62,21

147 Jharsuguda - Ib - Through Rail Renewal (Primary) - 7.02 km DRF 4,50,50

Complete Track Renewal

148 Jharsuguda - Bilaspur - CTR(P) - 4.58 km DRF 50,00

149 Anuppur - Boridand - TRR(S) & TSR(P) - 3.65 km each DRF 50,00

150 Motibagh Yard - TRR(S) & TSR(P) - 2.75 km each DRF 63,30

151 Raipur Store Depot - TRR(S) & TSR(P) - 14.98 km each DRF 1,57,68

152 Kotma & Govinda Sidings - CTR(S) - 3.50 km DRF 10,00

153 Bhilai Marshalling Yard - CTR(S) - 19.50 km DRF 4,03,55

154 Nowrozabad & Burhar (Assisted Sidings) - CTR(S) - 6.66 km DRF 50,00

155 Raipur Stores Depot Yard - CTR(S) - 11.73 km DRF 1,00,50

R.

156 Bilapsur - Durg - CTR - 8.15 km (P) DRF 47,33

157 Bhilai Marshalling Yard - CTR - 15 km (S) DRF 13,27

158 Bilaspur Yard Bypass Line - CTR - 2.7 km & TSR - 1.6 km (P) DRF 90,00

R.

159 Bilaspur Yard - CTR - 5 km (S) DRF 1,22,00

160 Nagpur - Durg - CTR - 2.5 km (P) DRF 12,95

161 Durg - Nagpur - CTR - 8.95 km (S) DRF 3,95,56

162 Bhilai Marshalling Yard - CTR - 20 km (S) DRF 8,42

Through Rail Renewal

163 Annupur - Katni - TRR(P) - 16.48 km DRF 3,00,00

164 Durg - Nagpur - TRR(P) - 26.92 km DRF 1,27,50

165 Champa-Gevra Road - TRR(P) - 8.6 km DRF 3,15,00

166 Jharsuguda - Bilaspur - TRR(P) - 21 km DRF 4,72,00

167 Champa - Bilaspur - TRR(P) - 33.43 km DRF 3,00,00

168 Durg - Nagpur - TRR(P) - 35 km (Up) DRF 30,00,00

169 Durg - Nagpur - TRR(P) - 4.59 km DRF 56,57

170 Bilaspur - Champa - TRR(P) - 4 km DRF 80,00

171 Jharsuguda-Champa - TRR(P) - 7 km DRF 5,95,00

172 Champa - Gevra Road - TRR(P) - 6.95 km DRF 4,92,00

173 Bilaspur - Anuppur - TRR(P) - 4.4 km DRF 1,50,00

174 Anuppur - Katni - TRR(P) - 6.16 km DRF 90,00

175 Darekasa-Salekasa - TRR(P) - 3.04 km DRF 2,50,00

176 Mandhar-Murhipur - TRR(P) - 24.977 km DRF 11,44,14

177 Bhilai Marshaling Yard -TRR(S) -10.25 km DRF 1,86,55

178 Bilaspur Yards - TRR(S) - 7 km DRF 1,00,00

TRACK RENEWALS

14.1.9

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

179 Bhilai Marshallaing Yard - TRR(S) - 13.657 km DRF 1,00

180 South East Central Railway - TRR - 10 km (P) (important & major bridges &

approaches)

DRF 2,15,00

181 Jaithari - Anuppur - TRR - 11 km (P) DRF 5,00

182 South East Central Railway - TRR on bridges & bridge approaches - 12.04 km (P) DRF 10,00

183 Jharsuguda - Raigarh - TRR - 3.19 km (P) DRF 60,00

184 Jharsuguda - Raigarh - TRR - 3.38 km (P) DRF 96,60

185 Khodri - Khongsara - Renewal of wheel burnt rail - 7 km DRF 1,20,00

186 Durg - Nagpur - TRR - 15.44 km (P) DRF 1,05,64

Through Sleeper Renewal

187 Jharsuguda - Champa - TSR (P) - 15.85 km DRF 2,42,00

188 Anuppur-Ambikapur - TSR(P) - 8 km DRF 50,00

R.

189 Champa-Gevra Road - TSR(P) - 8.5 km DRF 4,80,00

R.

190 Bilaspur-Baraduar & Khodri-Bhanwar Tonk - TSR(P) - 21.95 km DRF 1,00,00

R.

191 Boridand - Bisrampur - TSR(P) - 6 km DRF 91,00

192 Annupur - Boridand - TSR(P) - 6 km DRF 64,00

193 Darekasa-Salekasa & Paniajob-Bortalao - TSR - 9 km (P) DRF 2,05,06

R.

Ballast

194 Bilaspur - Durg - TBR - 37.97 km DRF 3,82,11

195 Champa - Korba - TBR - 36 km DRF 1,14,00

196 Gondia - Chanda Fort - TBR - 50 km DRF 1,80,72

197 Gondia-Chandafort -TBR - 34.80 km DRF 54,15

198 Champa-Gevra Road - TBR - 26 km DRF 1,00

199 Jharsuguda-Champa - TBR - 14 km (patches) DRF 40,00

R.

200 Bilaspur-Anuppur- Katni - TBR - 49.25 km DRF 2,14,00

201 Durg-Dallirajhara - TBR - 38.8 km DRF 61,07

R.

202 Bilaspur-Durg - TBR - 62.11 km DRF 5,29,79

R.

203 Gondia-Chanda Fort - TBR - 70.875 km DRF 23

R.

204 Bilaspur-Pendra Road TBR 35 km DRF 3,46

R.

205 Gevra Road-Champa - TBR - 30.68 km DRF 1,50,00

R.

TRACK RENEWALS

14.1.10

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

206 Kachewani-Durg - TBR 25.35 km DRF 40,05

R.

207 Gondia-Chanda Fort - TBR - 35 km DRF 1,23,12

R.

208 Bilaspur - Champa - TBR - 35 km DRF 2,34,00

209 Champa - Jharsuguda - TBR - 56.02 km DRF 1,50,00

210 Kachewani - Durg - TBR - 49.06 km DRF 23,42

211 Nagpur - Kachewani - TBR - 70.8 km DRF 35,84

212 Kanhan - Ramtek - TBR - 24.2 km DRF 13,81

Points & Crossings

213 Anuppur - Jhalwara - TTR - 37 sets DRF 50,00

214 Champa-Gevera Road - TTR- 62 sets DRF 50,00

215 Bilaspur Yards - TTR - 38 sets DRF 4,45,00

216 Raipur Stores Depot Yard - TTR- 40 sets DRF 77,68

217 Itwari & Gondiya Yards - TTR - 50 sets DRF 2,13,34

218 Bilaspur- Durg - TTR - 100 sets DRF 4,08,81

219 Bhilai Marshalling Yard - TTR - 46 sets DRF 42,18

220 Goberwahi & Tirodi Yards - TTR - 13 sets DRF 1,01,11

221 Jharsuguda - Bilaspur - TTR - 81 sets DRF 3,73,00

222 Bhilai Marshaling Yard & Raipur Store Depot Yard - TTR - 17 sets & derailing

switches - 3 sets

DRF 41

223 Chhindwara Yard - TTR (12 sets) DRF 1,00

R.

224 Bilaspur-Jharsuguda - TTR (107 sets) DRF 50,00

225 Bilaspur-Katni & Anuppur-Ambikapur - TTR (90 sets) DRF 50,00

226 Bilaspur Division - TTR (77 sets) DRF 50,00

R.

227 Durg-Nagpur - TTR (78 sets) DRF 5,47,51

228 Bilaspur-Durg - TTR (40 sets) DRF 1,22,55

R.

229 Bilaspur-Durg - TTR (46 sets) DRF 2,15,11

230 Durg -Nagpur -TTR - 100 sets DRF 4,26,13

231 Raipur Store Depot Yard - TTR (42 Nos) DRF 21,16

R.

232 Durg-Dallirajhara - TTR (15 sets) DRF 20,51

233 Durg-Dallirajhara - TTR (72 Nos) (Changed to Bhilai marshaling yard) DRF 1,08,89

R.

234 Nagpur - Durg - Thick web switches (30 sets) DRF 1,56,69

235 Bilaspur - Durg (Loop / Yard Lines) - TTR (68 sets) DRF 44,21

TRACK RENEWALS

14.1.11

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

236 Durg - Dallirajhara - TTR (60 sets) DRF ..

237 Durg - Nagpur - TTR (207 sets) DRF 1,59,66

238 Jharsuguda-Champa - Thick web switches & weldable CMS crossings (39 sets) DRF 80,00

R.

239 Bilaspur-Jharsuguda Thick web switches & weldable CMS crossings (87 sets) DRF 4,08,00

240 Jharsuguda - Champa - Thick web switches (47 sets) DRF 2,00,00

241 Champa - Gevra Road - TTR (43 sets) DRF 2,00,00

242 Champa - Korba - TTR (48 sets) DRF 1,00,00

243 Bilaspur Division - TTR (40 sets) DRF 2,83,00

244 Anuppur - Katni - TTR (38 sets) DRF 1,28,00

245 Nagpur Division - TTR (72 sets) DRF 27,70

246 Bhilai Marshalling Yard - TTR (50 sets) DRF 90,21

Others

247 Jharsuguda-Bilaspur - SEJ - 100 Ssets. (60 kg. 85 sets. & 52 kg. 15 sets.) DRF 50,00

248 Durg - Nagpur - Through renewal of guled joints - 500 sets DRF 4,46,67

249 Bilaspur-Durg - Glued joint - 400 sets DRF 3,46,75

250 Bilaspur-Durg - TWR - 73 km DRF 1,66,42

251 Jharsuguda - Bilaspur - Glued joints - 285 sets DRF 5,00

252 Bilaspur - Durg - TWR - 33.95 km DRF 72,55

253 Jharsuguda - Bilaspur - TFR - 110 km DRF 50,00

254 Gondia - Nagbhir - TFR - 60 km DRF ..

255 Bilaspur-Durg - Glued joints (2400 sets) DRF 46,50

256 Bilaspur - Durg - TFR - 80.81 km DRF 4,41,06

257 Bilaspur Division - SEJs (200 Nos) DRF 50,00

258 Bilaspur-Durg - SEJs (100 sets) DRF 49,44

259 Tumsar-Tirodi (Branch Line) - TFR - 46.60 km DRF 1,52,56

260 Champa - Gevra Road - TWR - 23.08 km DRF 50,00

261 Gondia - Chanda Fort - TFR - 45 km DRF 80,00

262 Durg - Nagpur - TWR - 64.93 km DRF 1,48,60

263 Anuppur-Katni - TFR - 113.4 km DRF 20,00

264 Durg-Nagpur - SEJ - 150 sets DRF 20,78

265 Boridand - Bisrampur - TFR - 40 km DRF 1,50,00

266 Bilaspur-Champa - TWR - 18 km DRF 50,00

267 Bilaspur-Anuppur - TWR - 22 km DRF 80,00

268 Bilaspur-Durg - TWR - 34 km DRF 22,55

269 Bilaspur-Champa - TFR - 50 km DRF 50,00

TRACK RENEWALS

14.1.12

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

270 Champa-Gevra Road - TFR - 38.2 km DRF 75,00

271 Jharsuguda-Champa - TFR - 55 km DRF 50,00

272 Durg-Nagpur - TFR - 92 km Up DRF 32,84

273 Bilaspur-Durg - TFR - 130.005 km DRF 1,31,10

274 Gondia-Chanda Fort - TFR - 93.4 km DRF 10

275 Durg - Nagpur - TFR - 188 km DRF 15,00

276 Bilaspur Division - TFR - 118 km DRF 45,00

277 Bilaspur - Durg - TFR - 71 km DRF 86,94

278 Durg - Nagpur - TFR - 47.53 km DRF 1,26,69

279 Bilaspur - Durg - TWR - 42.38 km DRF 2,08

280 Jharsuguda - Bilaspur - TWR - 53 km DRF 15,00

281 Anuppur - Katni - TWR - 38.4 km DRF 55,93

282 Jharsuguda - Champa - TFR - 52.939 km DRF 75,00

283 Champa - Bilaspur - TFR - 51 km DRF 70,00

284 Champa - Bilaspur - TWR - 65 km DRF 2,35,00

285 Durg - Nagpur - TFR - 79.25 km DRF 1,33,25

286 Bilaspur - Durg - TFR - 66.102 km DRF 1,21,58

287 Bilaspur - Durg - TWR - 32.535 km DRF 63,54

288 Works costing below Rs.2.5 crore each DRF 68,64,14

TOTAL-WORKS IN PROGRESS DRF 318,25,90

Complete Track Renewal

289 Raigarh - Champa - CTR (P) - 4.88 km DRF 50,00

R.

Through Rail Renewal

290 Durg -Nagpur (up) - TRR(P) -28.259 km DRF 3,10,88

291 Jharsuguda - Champa - TRR(P) - 11.312 km DRF 75,00

292 Urkura -Sorana - TRR(P) - 7.836 km DRF 2,63,22

293 Bilaspur - Anuppur - TRR(P) - 21 km DRF 75,00

294 Works costing below Rs.2.5 crore each DRF ..

TOTAL-NEW WORKS DRF 7,74,10

TOTAL-Track Renewals DRF 326,00,00

295 South East Central Railway - Repl. of steel girders with pre-stressed concrete

slabs (22 bridges)

DRF 50,00

296 Balaghat-Katangi - Protection work of bank & abutments (bridge No.66) and

leaning abutment (bridge No.12)

DF(4) 5,00

297 Chirimiri Yard - Conversion of skew girders to multiple box (bridge No.171) (6

lines)

DF(4) 32,23

TRACK RENEWALS

B - New Works

BRIDGE WORKS

A - Works in Progress

14.1.13

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

298 Bilaspur Division - Toe walls in approaches of major bridges (16 Nos) DRF 50,21

299 Dagori-Nipania - Regirdering of one girder & rectification of camber (bridge

No.462-up)

DRF ..

300 Mahendragarh-Paradol - Rebuilding (bridge No.99) DRF 44,97

301 Durg-Dallirajhara - Strengthening of bridges for 25 ton axle load DRF ..

302 Jharsuguda-Bilaspur - Jacketing of piers, abutments, foundation, repl. of bearings

for 25 ton axle load & repl.of girders (6 & 2 bridges respectively)

DRF ..

303 Bilaspur-Durg - Strengthening of bridges for 25 ton axle load DRF 40,00

304 Nagpur-Durg - Jacketing & recapping of piers & abutments (bridge No 184-up &

348)

DRF ..

305 Bilaspur Division - Jacketing & widening of abutments and piers in bridges (60

spans)

DRF 86,93

306 Bilaspur Division - Repl of girders with pre-stressed / reinforced concrete cement

slabs (97 Nos) (68 bridges)

DRF 1,20,00

307 Bilaspur - Repl of flat bearing with centralised bearing (32 bridges) DRF 1,03,00

308 Works costing below Rs.2.5 crore each Cap. ..

DRF 5,04,89

DF(2) ..

DF(4) 1,66,70

TOTAL-WORKS IN PROGRESS Cap. ..

DRF 10,00,00

DF(2) ..

DF(4) 2,03,93

309 Works costing below Rs.2.5 crore each DRF ..

TOTAL-NEW WORKS DRF ..

TOTAL-Bridge Works Cap. ..

DRF 10,00,00

DF(2) ..

DF(4) 2,03,93

310 Anuppur-Katni - Second distant signal DF(3) 2,45,00

311 Bilaspur-Anuppur & Champa-Gevra Road - 2nd distant signals DF(3) 2,50

312 Raipur Division - Dual track detection system for improving availability of block

proving by axle counters

DF(3) 73,03

313 South East Central Railway - Data loggers (A-route) DF(3) 60,00

314 Ramtek, Gobarwahi, Dongri Buzurg & Tirodi - Repl of signalling & ground gears DRF 2,25,00

315 Latia - Repl of signalling & ground gears DRF 2,50,00

316 South East Central Railway - Track circuiting fouling mark to fouling mark (17

stations) (E-route)

DF(4) 1,00

BRIDGE WORKS

B - New Works

SIGNALLING AND TELECOMMUNICATION

A - Works in Progress

14.1.14

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

317 Anuppur-Katni - Optic fibre cable link of STM-I with 6-quad underground cable

(160 km)

DRF 5,00

318 Raipur (Store Depot Yard) - Repl. of lever frames & ground gears by centralised

electrical operation of points & signals (end panel)

DRF 50,00

319 South East Central Railway - Permanent way material for completion of signalling

& telecommunication work

DF(4) 1

SRSF ..

320 Anuppur-Bishrampur - Optic fibre cable with 6-quad underground cable etc. (196

rkm)

DRF 1,00,00

321 Durg-Gondia - Automatic signalling Cap. ..

322 Bilaspur Division - Repl. of lever frames & signalling gears by central panel

interlocking over single line territory (10 stations) (E-Spl route)

DRF 2,00,00

323 Harrad, Kotma, Bijuri & Boridand - Repl. of lever frames and signalling gears by

central panel interlocking (E-Spl route)

DRF 1,50,00

324 Bilaspur Division - Home to fouling mark, fouling mark to block section limit and

loop line track circuiting (15 stations)

DF(4) 60,00

325 Bhilai (Peripheral Yard) - Repl.of lever frames & ground gears by centralized

electrical operation of points & signals at ore yard

DRF 20,00

326 Bhilai Marshalling Yard - Repl. of signalling & ground gears by route relay

interlocking (K & M cabins)

DRF 2,25,00

327 South East Central Railway - Fouling mark to home & fouling mark to block

section limit track circuiting (24 stations) (E-route)

DF(4) 1,70,00

328 South East Central Railway - Isolation and alteration of signalling (7 stations) DF(4) 2,25,00

329 Works costing below Rs.2.5 crore each DRF 5,95,00

DF(1) 2,15,57

DF(3) 7,99,71

DF(4) 1,31,48

TOTAL-WORKS IN PROGRESS Cap. ..

DRF 18,20,00

DF(1) 2,15,57

DF(3) 11,80,24

DF(4) 5,87,49

329a Kanhan-Ramtek - Optic fibre cable link (23 km) and Tumsar Road-Tirodi (47 km) DF(3) 1

330 Works costing below Rs.2.5 crore each DRF ..

DF(4) ..

TOTAL-NEW WORKS DRF ..

DF(3) 1

DF(4) ..

TOTAL-Signalling and Telecommunication Cap. ..

DRF 18,20,00

DF(1) 2,15,57

DF(3) 11,80,25

DF(4) 5,87,49

SIGNALLING AND TELECOMMUNICATION

B - New Works

14.1.15

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

331 South East Central Railway - Direct power supply from central generating

agencies

Cap. 5,62,85

332 Works costing below Rs.2.5 crore each DRF 1,15,00

DF(1) 8,36

DF(2) 7,96

DF(3) 65,68

TOTAL-WORKS IN PROGRESS Cap. 5,62,85

DRF 1,15,00

DF(1) 8,36

DF(2) 7,96

DF(3) 65,68

333 Works costing below Rs.2.5 crore each DRF ..

DF(1) ..

DF(2) ..

DF(3) ..

TOTAL-NEW WORKS DRF ..

DF(1) ..

DF(2) ..

DF(3) ..

TOTAL-Other Electrical Works excl TRD Cap. 5,62,85

DRF 1,15,00

DF(1) 8,36

DF(2) 7,96

DF(3) 65,68

334 Bilaspur Division - Modification of overhead equipment over main line DF(3) 1

335 Durg-Nagpur - Reliability improvement work of overhead equipment DRF 1,62,27

336 Bilaspur Division - Repl. of electrical equipment & modification of overhead

equipment

DRF 96,23

337 Himgir - New traction substation & associated 132 kv transmission line from

Orissa State Electricity Board (30 km)

DF(3) 6,69,77

338 Bilaspur Division - Repl of Scada system with updated system DRF 2,00

339 Works costing below Rs.2.5 crore each DRF 1,95,50

DF(3) 10,56

TOTAL-WORKS IN PROGRESS DRF 4,56,00

DF(3) 6,80,34

340 Bilaspur Division - Interrupters for sidings DF(3) 1

341 Works costing below Rs.2.5 crore each DRF ..

DF(3) ..

TOTAL-NEW WORKS DRF ..

DF(3) 1

TOTAL-Traction Distribution Works DRF 4,56,00

DF(3) 6,80,35

OTHER ELECTRICAL WORKS EXCL TRD

A - Works in Progress

B - New Works

TRACTION DISTRIBUTION WORKS

A - Works in Progress

B - New Works

14.1.16

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

342 Nagpur Workshop - Setting up of broad gauge coach periodical overhauling shed

for 27 non airconditioned coaches

Cap. ..

343 Raipur Workshop - Extension of body repair shed towards stripping section (60

m)

DF(3) 70,57

344 Bhilai Marshalling Yard - Extention of covered shed DF(3) ..

345 Bhilai - Augmentation of facilities in main line electrical multiple shed (Phase-III) DF(3) ..

346 Motibagh Workshop - Broad gauge loco shed for maintenance of 15 locos DF(3) 69,00

347 Gondia - Maintenance facilities for diesel electrical multiple unit rakes & broad

gauge diesel locos (Phase-II)

DF(3) 1,13,84

348 Bhilai - Expansion of main line electrical multiple unit shed with necessary

facilities (Phase-II)

Cap. 1,64,42

349 Bhilai (Electric Loco Shed) - Augmentation of homing capacity from 150 to 175

alongwith 3-phase facilities

Cap. 44,56

350 Raigarh - New electric loco shed with holding capacity of 100 locos Cap. 6,19,42

351 Durg - Upgradation of coaching depot (Phase-III), extension of washing & pit lines

to accommodate 26 coaches

DF(3) 5,47

352 Gondia - Development of facilities for premium examination line & maintenance

sick line of freight stock

DF(3) ..

353 Gondia - Development of facilities for maintenance of coaching stock and

creation of covered shed

DF(3) 1,27,00

354 Korba - Upgradation of freight maintenance facilities DF(3) ..

355 Bilaspur - Extension of intermediate overhauling shed at coaching depot DF(3) 2,35,07

356 Raipur (Diesel Shed) - Expansion of capacity to home WDG4 locos Cap. 11,97,81

357 Motibagh Workshop - Setting up of a unit for environment friendly coach toilets DF(3) 9,44,40

358 Works costing below Rs.2.5 crore each DRF 70,77

DF(2) ..

DF(3) 4,67,76

DF(4) 24,08

TOTAL-WORKS IN PROGRESS Cap. 20,26,21

DRF 70,77

DF(2) ..

DF(3) 20,33,11

DF(4) 24,08

359 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(3) ..

TOTAL-NEW WORKS Cap. ..

DRF ..

DF(3) ..

WORKSHOPS INCLUDING PRODUCTION UNITS

A - Works in Progress

B - New Works

14.1.17

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

TOTAL-Workshops including Production Units Cap. 20,26,21

DRF 70,77

DF(2) ..

DF(3) 20,33,11

DF(4) 24,08

360 Brajrajnagar - Type-II - 70, type-III - 10 & typeIV - 4 units Cap. 22,00

361 Brajrajnagar - Type-II & III - 15 units each & type-IV - 1 unit Cap. ..

362 Korba - Type-II - 30, type-III - 10 & type-IV - 5 units Cap. 1,53,37

363 Raipur - Type-II - 20, type-III - 30 & type-IV - 6 units Cap. 3,09,54

364 Bilaspur - Repl. of out-houses, type-I - 50 units DRF ..

365 Bilaspur - Repl.of quarters, type-II - 142 units DRF ..

366 Bilaspur - Repl.of quarters, type-IV - 61 units DRF 53,50

367 Bilaspur - Repl.of quarters, type-I - 401 units DRF 2,18,42

368 Raipur - Repl. of quarters, type-I - 96 units with type-II Cap. ..

369 Raipur - Repl of quarters, type-I - 64 units with type-II - 64 & type-IV - 1 unit at

Durg colony

DRF 1,05,65

370 Raipur - Type-V - 11 & type-IV - 20 units at Settlement Cap. 20,00

371 Raigarh - Repl of quarters, type-II - 46 & type-III - 1 unit DRF 1,70,00

372 Bilaspur Division - Repl. of quarters, type-III - 50 units DRF 1,50,00

373 Bilaspur - Repl of quarters, type-V - 24 units DRF 22,33

374 Works costing below Rs.2.5 crore each Cap. 4,13,25

DRF 1,12,10

TOTAL-WORKS IN PROGRESS Cap. 9,18,16

DRF 8,32,00

375 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

TOTAL-NEW WORKS Cap. ..

DRF ..

TOTAL-Staff Quarters Cap. 9,18,16

DRF 8,32,00

376 Bilaspur (Central Hospital) - Repl/renovation of wards, labour room, out patients'

department, radiology & physiotherapy units and miscellaneous works

DRF 1,60,18

377 Bhilai Marshaling Yard - Repl of pipeline (18 inch dia) and pump DRF 1,20,12

378 Bilaspur - Expansion of divisional railway hospital DF(2) 24,85

379 Bhilai Marshaling Yard & Bhilai - Improvement of staff quarters & colonies (Phase-

I)

DF(2) 66,17

380 Nagpur - Repl of doors, windows & jafferies in quarters and improvement to

colony roads

DRF 20,00

381 Bilaspur Division - Rewiring of staff quarters (2435 Nos) and repl of lights & fans

with energy efficient lights & fans

DRF 40,00

382 Raipur - 12 dia cast iron pipeline parallel to 14 dia pipeline and repl of pumps DF(2) 74,03

STAFF QUARTERS

A - Works in Progress

B - New Works

AMENITIES FOR STAFF

A - Works in Progress

14.1.18

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

383 Bilaspur Division - Improvement of staff quarters (Phase-III) DRF 1,00,00

384 Nagpur Division - Rewiring of quarters (2233 Nos) DRF 45,20

385 Works costing below Rs.2.5 crore each Cap. 5,50

DRF 1,63,50

DF(1) 11,68

DF(2) 5,38,27

DF(3) 83,10

TOTAL-WORKS IN PROGRESS Cap. 5,50

DRF 6,49,00

DF(1) 11,68

DF(2) 7,03,32

DF(3) 83,10

386 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(2) ..

TOTAL-NEW WORKS Cap. ..

DRF ..

DF(2) ..

TOTAL-Amenities for Staff Cap. 5,50

DRF 6,49,00

DF(1) 11,68

DF(2) 7,03,32

DF(3) 83,10

387 Bhatapara, Tilda, Raipur & Bhilai Power House - Extension of platform for 24

coach trains

DF(1) ..

388 Bhilai (G & H Cabin), Bhilai Nagar, Belha & Hathband - Extention & raising of

platforms

DF(1) ..

389 Bilaspur-Durg - Raising of platforms (9 stations) (A-route) DF(1) 25,98

390 Raipur - Development of circulating area at Gudiyari side DF(1) 6,44

391 Itwari - Development of circulating area with booking office & entrance; extension

of foot over bridge and provision of catering stall & parking stand

DF(1) 60,00

392 South East Central Railway - Escalators at various stations (4 Nos) (2 stations) DF(1) 75,00

393 Works costing below Rs.2.5 crore each DRF 7,10,77

DF(1) 28,62,75

DF(2) 25,62

DF(3) 1,90,17

TOTAL-WORKS IN PROGRESS DRF 7,10,77

DF(1) 30,30,17

DF(2) 25,62

DF(3) 1,90,17

AMENITIES FOR STAFF

B - New Works

PASSENGER AMENITIES

A - Works in Progress

14.1.19

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

394 Works costing below Rs.2.5 crore each DRF ..

DF(1) ..

TOTAL-NEW WORKS DRF ..

DF(1) ..

TOTAL-Passenger Amenities DRF 7,10,77

DF(1) 30,30,17

DF(2) 25,62

DF(3) 1,90,17

395 Raipur - New division Cap. ..

DF(3) ..

396 Bilaspur - Creation of new railway zone Cap. ..

DF(3) 4,85

397 Raipur - 50-bedded divisional hospital DF(2) ..

398 South East Central Railway - Integrated security system (3 stations) Cap. 5,00,00

399 Raipur (General Stores Depot) - Extension of godown DF(3) 92,45

400 Raipur - Construction of officers' rest house Cap. 52,57

401 Works costing below Rs.2.5 crore each Cap. 42,90

DRF 50,00

DF(1) 4,08

DF(2) 3,38,43

DF(3) 2,55,96

DF(4) 6,27

TOTAL-WORKS IN PROGRESS Cap. 5,95,47

DRF 50,00

DF(1) 4,08

DF(2) 3,38,43

DF(3) 3,53,26

DF(4) 6,27

402 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(3) ..

TOTAL-NEW WORKS Cap. ..

DRF ..

DF(3) ..

TOTAL-Other Specified Works Cap. 5,95,47

DRF 50,00

DF(1) 4,08

DF(2) 3,38,43

DF(3) 3,53,26

DF(4) 6,27

PASSENGER AMENITIES

B - New Works

OTHER SPECIFIED WORKS

A - Works in Progress

B - New Works

14.1.20

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

TOTAL-WORKS IN PROGRESS Cap. 521,40,19

C.Fund 252,89,00

DRF 378,64,69

DF(1) 33,23,20

DF(2) 10,75,33

DF(3) 66,71,81

DF(4) 8,21,77

S.Fund 107,37,85

Dep(RVN) 29,84,00

EBR 33,32,00

TOTAL - NEW WORKS Cap. ..

DRF 7,74,10

DF(1) ..

DF(2) ..

DF(3) 2

DF(4) ..

S.Fund ..

GRAND TOTAL Cap. 521,40,19

C.Fund 252,89,00

DRF 386,38,79

DF(1) 33,23,20

DF(2) 10,75,33

DF(3) 66,71,83

DF(4) 8,21,77

S.Fund 107,37,85

Dep(RVN) 29,84,00

EBR 33,32,00

14.2.1

SOUTH EAST CENTRAL RAILWAY

MACHINERY AND PLANT PROGRAM FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15

403 System of online monitoring of rolling stock (OMRS) (6 Nos) DF(3) 1

404 Raipur - Hydraulic wheel press (500 ton) DRF 13,23

405 Raipur - Underfloor wheel lathe DRF 2,93,70

406 Raipur - CNC surface wheel lathe DRF 4,85,41

407 Bhilai - CNC surface wheel lathe Cap. 3,69,65

408 Nagpur - Simulator in motion type Cap. 1

409 Raipur - Simulator in Motion Type DF(3) 1

410 Raipur workshop - AJTB Lathe (BG) Cap. 42,15

411 Works costing below Rs.2.5 crore each Cap. 1,01,87

DRF 3,13,47

DF(2) ..

DF(3) 2,34,52

TOTAL-PROGRAMMED DELIVERIES Cap. 5,13,68

DRF 11,05,81

DF(2) ..

DF(3) 2,34,54

412 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(2) ..

DF(3) ..

TOTAL-NEW ACQUISITION Cap. ..

DRF ..

DF(2) ..

DF(3) ..

TOTAL-Machinery & Plant Cap. 5,13,68

DRF 11,05,81

DF(2) ..

DF(3) 2,34,54

B - NEW ACQUISITION

AllocationParticulars

A - PROGRAMMED DELIVERIES