14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item No. RE 2014-15 1 Dallirajahara-Jagdalpur (235 km) Cap. 5,00 EBR 20,00,00 2 Wadsa-Gadchiroli (49.5 km) Cap. 4,00,00 EBR 10,00,00 3 Raigarh (Mand Colliery) - Bhupdeopur (63 km) EBR 1,00 4 Gevra Road - Pendra Road (121.70 km) EBR 1,00 5 Barwadih - Chirmiri (182 km) Cap. .. 6 Raipur - Jharsuguda (310 km) Cap. .. TOTAL-WORKS IN PROGRESS Cap. 4,05,00 EBR 30,02,00 TOTAL-New Lines (Construction) Cap. 4,05,00 EBR 30,02,00 7 Jabalpur-Gondia incl. Balaghat-Katangi (285 km) Cap. 100,10,00 C.Fund .. 8 Chhindwara-Nagpur (149.522 km) Cap. 124,38,37 9 Chhindwara-Mandla Fort (182.25 km) Cap. 31,99,62 10 Nagbhir - Nagpur (106 km) Cap. 1 TOTAL-WORKS IN PROGRESS Cap. 256,48,00 TOTAL-Gauge Conversion Cap. 256,48,00 11 Bilaspur-Urkura (110 km) Cap. .. C.Fund .. Dep(RVN) 8,95,00 12 Bilaspur-Salka Road - Patch doubling (39.4 km) Cap. 2,46,47 EBR .. 13 Salka Road-Khongsara - Patch doubling (26 km) Dep(RVN) 10,89,00 14 Khodri-Anuppur, with flyover at Bilaspur (61.6 km) C.Fund .. Dep(RVN) 10,00,00 15 Champa - Bypass line Cap. 2,29,24 16 Kalumna-Nagpur Cap. 3,31,29 17 Champa-Jharsuguda - 3rd line (165 km) Cap. 149,00,00 EBR .. 18 Durg-Rajnandgaon - 3rd line Cap. 20,00,00 TOTAL-WORKS IN PROGRESS Cap. 177,07,00 Dep(RVN) 29,84,00 TOTAL-Doubling Cap. 177,07,00 Dep(RVN) 29,84,00 Allocation Particulars NEW LINES (CONSTRUCTION) A - Works in Progress GAUGE CONVERSION A - Works in Progress DOUBLING A - Works in Progress

Transcript of 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS...

Page 1: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.1

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15

1 Dallirajahara-Jagdalpur (235 km) Cap. 5,00

EBR 20,00,00

2 Wadsa-Gadchiroli (49.5 km) Cap. 4,00,00

EBR 10,00,00

3 Raigarh (Mand Colliery) - Bhupdeopur (63 km) EBR 1,00

4 Gevra Road - Pendra Road (121.70 km) EBR 1,00

5 Barwadih - Chirmiri (182 km) Cap. ..

6 Raipur - Jharsuguda (310 km) Cap. ..

TOTAL-WORKS IN PROGRESS Cap. 4,05,00

EBR 30,02,00

TOTAL-New Lines (Construction) Cap. 4,05,00

EBR 30,02,00

7 Jabalpur-Gondia incl. Balaghat-Katangi (285 km) Cap. 100,10,00

C.Fund ..

8 Chhindwara-Nagpur (149.522 km) Cap. 124,38,37

9 Chhindwara-Mandla Fort (182.25 km) Cap. 31,99,62

10 Nagbhir - Nagpur (106 km) Cap. 1

TOTAL-WORKS IN PROGRESS Cap. 256,48,00

TOTAL-Gauge Conversion Cap. 256,48,00

11 Bilaspur-Urkura (110 km) Cap. ..

C.Fund ..

Dep(RVN) 8,95,00

12 Bilaspur-Salka Road - Patch doubling (39.4 km) Cap. 2,46,47

EBR ..

13 Salka Road-Khongsara - Patch doubling (26 km) Dep(RVN) 10,89,00

14 Khodri-Anuppur, with flyover at Bilaspur (61.6 km) C.Fund ..

Dep(RVN) 10,00,00

15 Champa - Bypass line Cap. 2,29,24

16 Kalumna-Nagpur Cap. 3,31,29

17 Champa-Jharsuguda - 3rd line (165 km) Cap. 149,00,00

EBR ..

18 Durg-Rajnandgaon - 3rd line Cap. 20,00,00

TOTAL-WORKS IN PROGRESS Cap. 177,07,00

Dep(RVN) 29,84,00

TOTAL-Doubling Cap. 177,07,00

Dep(RVN) 29,84,00

AllocationParticulars

NEW LINES (CONSTRUCTION)

A - Works in Progress

GAUGE CONVERSION

A - Works in Progress

DOUBLING

A - Works in Progress

Page 2: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.2

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

19 Itwari - Addl loop lines (2 Nos) Cap. 35,40

20 Badhwabara - Conversion of stabling line into running line Cap. ..

21 Bakal - Conversion of C-class station into B-class with 4 lines Cap. 1,32,64

22 Gondia Yard - Crossover at Nagpur end to connect Chanda Fort grid DF(3) 1,49,35

23 Ib - Fly-over Cap. 42,00

24 Baraduar - Long loop line DF(3) 20,00

25 Brajrajnagar & Belpahar - Connectivity with Belpahar Open Coal Mines group

sidings

Cap. 20,00

26 Raygad - Extension of shunting neck DF(3) 1,36,50

27 Kothari Road - Long loop line DF(3) ..

28 Dumrikhurd-Ramtek - Extension of overhead equipment DF(3) 1,08,55

29 Kalumna - Goods shed line DF(3) 2,70,97

30 Shahdol - Long loop line DF(3) ..

31 Silyari - Long loop line DF(3) ..

32 Hathbandh - Long loop line DF(3) 2,73,25

33 Salwa - Long loop line DF(3) ..

34 Koka - Long loop line DF(3) ..

35 Jharridih - Addl loop line DF(3) ..

36 Parmalkasa - Conversion of C-class station to B-class DF(3) ..

37 Uslapur - Development as model goods shed DF(3) 43

38 Salwa - Conversion of C-class station into B-class with 4 lines Cap. ..

39 Bhilai - Electrification of Jamul Cement Works siding incl. yard DF(3) ..

40 Gondia-Nagpur - Automatic signalling Cap. 14,50,00

EBR ..

41 Anuppur-Katni - Intermediate block section Cap. 1,20,00

42 Mandir Hassaud - Electrification incl. yard Cap. ..

C.Fund ..

43 Kharsia - Conversion of stabling line into down loop DF(3) 35

44 Rupaund - Addl common loop to serve new goods shed Cap. 48,21

45 Mandhar - New goods terminal Cap. 88,39

46 Silyari - Addl loop DF(3) ..

47 Mudaria - Addl loop Cap. 22,80

48 Kirodimalnagar - Remodeling for dealing with addl traffic of Jindal Steel Plant Ltd

siding

Cap. 1,09

49 Bhupdeopur - Remodelling for dealing with new private sidings Cap. 2,11

EBR ..

50 Bilaspur Division - Intermediate block signalling (8 locations) DF(3) ..

51 Durg - Development of goods shed by common loop (line No 10) and better

unloading facilities

Cap. 27,98

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

A - Works in Progress

Page 3: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.3

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

52 Bhilai - Addl. freight maintenance depot at coal empty yard with three examination

lines and one shunting neck of full length

Cap. 4,00,09

EBR ..

53 Rasamara - Down loop Cap. 22,59

54 Bhilai (Exchange Yard) - Remodelling with two addl lines by extension of dead

end

Cap. 1,57,06

55 Himgir - Addl down loop Cap. 1,07,67

56 Jamga - Yard remodelling Cap. 3,83,77

57 Ib - Addl up loop Cap. 79,20

58 Saragbundia - Conversion of goods shed siding into up loop cum down reception

line

Cap. 68,03

59 Tilda - Augmentation / improvement / addition of goods shed Cap. 69,20

60 Mudaria - Addl down loop Cap. ..

61 Bilaspur Division - Siding for stabling track machines (9 stations) DF(3) 57,00

62 Nagpur Division - Siding for track machines (6 stations) DF(3) 29,00

63 Kamptee - Addl up loop Cap. 2,10,26

64 Baradaur - Addl up loop Cap. 2,91,74

65 Maroda - New exchange yard for addl traffic of Bhilai Steel Plant Cap. 3,26,62

66 Kotarlia - Conversion of up loop into common loop Cap. 55,95

67 Works costing below Rs.2.5 crore each Cap. 59,20

DRF 18,25

DF(1) 11,17

DF(3) 10,27,42

TOTAL-WORKS IN PROGRESS Cap. 42,22,00

DRF 18,25

DF(1) 11,17

DF(3) 20,72,82

68 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(1) ..

DF(3) ..

TOTAL-NEW WORKS Cap. ..

DRF ..

DF(1) ..

DF(3) ..

TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 42,22,00

DRF 18,25

DF(1) 11,17

DF(3) 20,72,82

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

B - New Works

Page 4: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.4

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

69 South East Central Railway - Extension of unreserved ticketing system to E-

category stations

DF(1) 1,00

70 South East Central Railway - Extension of automatic ticket vending machines Cap. 50,00

71 Bilaspur - Upgradation of infrastructure of zonal information technology centre DF(3) 13,09

72 Works costing below Rs.2.5 crore each DRF 3,17,00

DF(1) 41,17

DF(3) ..

TOTAL-WORKS IN PROGRESS Cap. 50,00

DRF 3,17,00

DF(1) 42,17

DF(3) 13,09

73 Works costing below Rs.2.5 crore each DRF ..

DF(1) ..

DF(3) ..

TOTAL-NEW WORKS DRF ..

DF(1) ..

DF(3) ..

TOTAL-Computerisation Cap. 50,00

DRF 3,17,00

DF(1) 42,17

DF(3) 13,09

74 Leased Assets - Payment of Capital component of lease charges to Indian

Railway Finance Corporation

C.Fund 252,89,00

TOTAL-WORKS IN PROGRESS C.Fund 252,89,00

TOTAL-Leased Assets - Payment of Capital Component C.Fund 252,89,00

75 Bilaspur, Nagpur & Raipur - Interlocking of level crossing gates (9, 7 & 4 Nos

respectively)

S.Fund 1,42,00

76 Champa-Korba - Elimination of all level crossing gates by grade separators S.Fund ..

77 Bilaspur Division - Manning of level crossings (15 Nos) S.Fund 10

78 South East Central Railway - Manning of unmanned level crossings (140 Nos) S.Fund 26,62

79 Works costing below Rs.2.5 crore each S.Fund 18,31,21

TOTAL-WORKS IN PROGRESS S.Fund 19,99,93

80 Works costing below Rs.2.5 crore each S.Fund ..

TOTAL-NEW WORKS S.Fund ..

TOTAL-Road Safety Works-Level Crossings. S.Fund 19,99,93

COMPUTERISATION

A - Works in Progress

B - New Works

LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT

A - Works in Progress

ROAD SAFETY WORKS-LEVEL CROSSINGS.

A - Works in Progress

B - New Works

Page 5: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.5

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

81 Saraswati Nagar-Sarona - Limited height subway at level crossing No.420 S.Fund 1,11

82 Durg-Dallirajhara - Road over & under bridge at level crossing No.DD-10 S.Fund ..

EBR ..

83 Bilaspur-Katni - Road over & under bridge / limited height subway in lieu of level

crossing No.BK-66

S.Fund 10,00

EBR ..

84 Bilaspur Yard - Limited height subway on multi line section in lieu of

Chuchiyapara level crossing gate No.365

S.Fund 4,70

EBR ..

85 Bilaspur Yard - Road over bridge in lieu of level crossing No.366 at Tarbahar

Naka

S.Fund ..

EBR ..

86 Bhilai-Durg - Limited height subway near level crossing No.443 (Nehru Nagar

Gate)

S.Fund 1,21

87 Raipur Naka - Limited height subway in lieu of level crossing No.444 S.Fund ..

88 Kanhan-Ramtek & Tumsar road-Tirodi - Limited height subways in lieu of level

crossings (6 Nos)

S.Fund 10

89 Nainpur-Chhindwara - Limited height subways by open cut method at unmanned

level crossings (20 Nos)

S.Fund 75

90 Bhilai - Full height subway in lieu of level crosing No.439 (Sirsa Gate) S.Fund ..

EBR ..

91 Chhindwara-Nagpur - Limited height subways by open cut method at unmanned

level crossings (40 Nos)

S.Fund 10,09,67

92 Naila-Champa - Road under bridge in lieu of level crossing No.339 & 340 S.Fund 15,00

93 Amlai-Burhar - Repl of road over bridge No.BK-103/up & down S.Fund 5

94 Balaghat-Nainpur - Limited height subways by open cut method at unmanned

level crossings (27 Nos)

S.Fund ..

95 Gondia-Nagbhir - Limited height subway in lieu of level crosings (9 Nos) S.Fund 10

96 Nainpur-Jabalpur - Limited height subways by open cut method at unmanned

level crossings (13 Nos)

S.Fund 43,53

97 Mandhar-Urkura - Limited height subway in lieu of level crosing No.413 S.Fund ..

EBR ..

98 Nainpur-Mandla Fort - Limited height subways by open cut method at unmanned

level crossings (15 Nos)

S.Fund 30,00

99 Tenganmada-Khongsara - Limited height subway in lieu of level crosing No.BK-30 S.Fund 40,00

100 Gondia-Balaghat - Limited height subways by open cut method at unmanned level

crossings (24 Nos)

S.Fund ..

101 Sarona-Kumhari - Full height subway in lieu of level crosing No.429 S.Fund ..

EBR ..

102 Bramapuri-Chanda Fort - Limited height subways by open cut method at

unmanned level crossings (25 Nos)

S.Fund 8,00,00

103 Durg Yard - Full height subway in lieu of level crosing No.445 S.Fund ..

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

A - Works in Progress

Page 6: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.6

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

104 Kanhan-Koradih - Limited height subways by open cut method at unmanned level

crossings (5 Nos)

S.Fund ..

105 Bhilai Nagar-Durg Link Block - Road over bridge in lieu of level crossing No.443

(Nehru Nagar)

S.Fund ..

EBR ..

106 Bilaspur-Katni - Road over & under bridge in lieu of level crossing No.BK-37 near

Gourela

S.Fund ..

EBR ..

107 Marauda-Risama - Road under bridge in lieu of level crossing No.DD-12 S.Fund 3,24

108 Gunderdehi-Latabor - Road under bridge in lieu of level crossing No.DD-36 S.Fund 3,24

109 Gunderdehi-Latabor - Road under bridge in lieu of level crossing No.DD-44 S.Fund 3,24

110 Balod-Kusumkasa - Road under bridge in lieu of level crossing No.DD-54 S.Fund 3,24

111 Kusumkasa-Dallirajhara - Road under bridge in lieu of level crossing No.DD-59 S.Fund 3,24

112 Kusumkasa-Dallirajhara - Road under bridge in lieu of level crossing No.DD-60 S.Fund 3,24

113 Kotma Yard - Road under bridge in lieu of level crossing No.AB-10 (Traffic) S.Fund 96,05

114 Parmalkasa-Rajnandgaon - Road under bridge in lieu of level crossing No.458 S.Fund ..

EBR ..

115 Saraswatinagar-Sarona - Full height subway in lieu of level crossing No.421

(Dumartalab Gate)

S.Fund ..

EBR ..

116 Dadhapara-Belha - Limited height subway in lieu of level crossing No.372 S.Fund 50,00

EBR ..

117 Bilaspur-Durg - Limited height subway in lieu of level crossing near G-cabin S.Fund 42

118 Bhilai Power House-Bhilainagar - Road over & under bridge in lieu of manned

level crossing No.442 (Supela Gate)

S.Fund ..

EBR ..

119 Champa-Korba - Elemination of all level crossings by grade seperators S.Fund ..

120 Bijuri Yard - Road over bridge in lieu of level crossing No.AB-18 S.Fund 21

121 Kotma-Bhaiatola - Road over bridge for closure of level crossing No.AB-11

(Traffic)

S.Fund 75,00

122 Akaltara - Road over bridge in lieu of level crossing No.353 S.Fund 2,60,69

EBR ..

123 Uslapur - Road over bridge in lieu of level crossing No BK-4 S.Fund ..

EBR ..

124 Raigarh-Kotarlia - Road over bridge at level crossing No.288 S.Fund ..

EBR ..

125 Tumsar - Road over bridge in lieu of level crossing No 532 S.Fund ..

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

Page 7: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.7

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

126 Champa-Naila - Road over bridge in lieu of level crossing No 342 (Khoksa level

crossing)

S.Fund 4,51

EBR ..

127 Champa Yard - Road over & under bridge in lieu of level crossing No 337 S.Fund ..

EBR ..

128 Raipur-Baloda Bazar Road - Road over bridge at level crossing No.RV-5 S.Fund ..

EBR ..

129 Raigarh - Road over bridge in lieu of level crossing at km 588/13-15 S.Fund ..

EBR ..

130 Bilaspur-Gatora - Road over bridge in lieu of level crossing No.364 S.Fund 2,44,32

EBR ..

131 Ranisagar Railway - Road over bridge at level crossing at km 615/11-13 S.Fund ..

EBR ..

132 Tilda-Simga - Road under & over bridge at level crossing No.397 near Tilda

crossing (national highway No.37)

S.Fund 75,05

EBR ..

133 Bilaspur Yard Tarbahar - Normal height subway on multi line section level

crossing

S.Fund 7,08,95

134 Dadhapara-Belha - Road over & under bridge at level crossing No.370 S.Fund 9,44

EBR 3,30,00

135 Raipur Division - Road under bridge near H-cabin in lieu of level crossing No.433

& 434

S.Fund 42

136 Raipur-Titlagarh - Limited height subways in lieu of level crossing Nos.RV-4, RV-

15 & RV-19

S.Fund 42

137 Works costing below Rs.2.5 crore each S.Fund 52,36,78

TOTAL-WORKS IN PROGRESS S.Fund 87,37,92

EBR 3,30,00

138 Unchibit - Road over bridge in lieu of level crossing No.293 S.Fund ..

EBR ..

139 Works costing below Rs.2.5 crore each S.Fund ..

TOTAL-NEW WORKS S.Fund ..

TOTAL-Road Safety Works-Road Over/Under Bridges. S.Fund 87,37,92

EBR 3,30,00

140 Durg-Nagpur - TRR(P) - 71.94 km DRF 6,95,93

141 Durg-Nagpur - TRR(P) - 4.91 km DRF 64,16

142 Durg-Nagpur - SEJs (73 sets) DRF 79,04

143 Durg-Nagpur - TWR - 41.10 km DRF 35,74

144 Durg - Kachewani - TFR - 55 km DRF 50,00

145 Anuppur-Katni - TWR - 44.56 km DRF 60,00

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

B - New Works

TRACK RENEWALS

A - Works in Progress

Page 8: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.8

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

146 Jharsuguda-Nagpur - Complete renewal of switches & crossings with thick web

switches & weldable CMS crossings on PSC layouts (200 sets)

DRF 9,62,21

147 Jharsuguda - Ib - Through Rail Renewal (Primary) - 7.02 km DRF 4,50,50

Complete Track Renewal

148 Jharsuguda - Bilaspur - CTR(P) - 4.58 km DRF 50,00

149 Anuppur - Boridand - TRR(S) & TSR(P) - 3.65 km each DRF 50,00

150 Motibagh Yard - TRR(S) & TSR(P) - 2.75 km each DRF 63,30

151 Raipur Store Depot - TRR(S) & TSR(P) - 14.98 km each DRF 1,57,68

152 Kotma & Govinda Sidings - CTR(S) - 3.50 km DRF 10,00

153 Bhilai Marshalling Yard - CTR(S) - 19.50 km DRF 4,03,55

154 Nowrozabad & Burhar (Assisted Sidings) - CTR(S) - 6.66 km DRF 50,00

155 Raipur Stores Depot Yard - CTR(S) - 11.73 km DRF 1,00,50

R.

156 Bilapsur - Durg - CTR - 8.15 km (P) DRF 47,33

157 Bhilai Marshalling Yard - CTR - 15 km (S) DRF 13,27

158 Bilaspur Yard Bypass Line - CTR - 2.7 km & TSR - 1.6 km (P) DRF 90,00

R.

159 Bilaspur Yard - CTR - 5 km (S) DRF 1,22,00

160 Nagpur - Durg - CTR - 2.5 km (P) DRF 12,95

161 Durg - Nagpur - CTR - 8.95 km (S) DRF 3,95,56

162 Bhilai Marshalling Yard - CTR - 20 km (S) DRF 8,42

Through Rail Renewal

163 Annupur - Katni - TRR(P) - 16.48 km DRF 3,00,00

164 Durg - Nagpur - TRR(P) - 26.92 km DRF 1,27,50

165 Champa-Gevra Road - TRR(P) - 8.6 km DRF 3,15,00

166 Jharsuguda - Bilaspur - TRR(P) - 21 km DRF 4,72,00

167 Champa - Bilaspur - TRR(P) - 33.43 km DRF 3,00,00

168 Durg - Nagpur - TRR(P) - 35 km (Up) DRF 30,00,00

169 Durg - Nagpur - TRR(P) - 4.59 km DRF 56,57

170 Bilaspur - Champa - TRR(P) - 4 km DRF 80,00

171 Jharsuguda-Champa - TRR(P) - 7 km DRF 5,95,00

172 Champa - Gevra Road - TRR(P) - 6.95 km DRF 4,92,00

173 Bilaspur - Anuppur - TRR(P) - 4.4 km DRF 1,50,00

174 Anuppur - Katni - TRR(P) - 6.16 km DRF 90,00

175 Darekasa-Salekasa - TRR(P) - 3.04 km DRF 2,50,00

176 Mandhar-Murhipur - TRR(P) - 24.977 km DRF 11,44,14

177 Bhilai Marshaling Yard -TRR(S) -10.25 km DRF 1,86,55

178 Bilaspur Yards - TRR(S) - 7 km DRF 1,00,00

TRACK RENEWALS

Page 9: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.9

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

179 Bhilai Marshallaing Yard - TRR(S) - 13.657 km DRF 1,00

180 South East Central Railway - TRR - 10 km (P) (important & major bridges &

approaches)

DRF 2,15,00

181 Jaithari - Anuppur - TRR - 11 km (P) DRF 5,00

182 South East Central Railway - TRR on bridges & bridge approaches - 12.04 km (P) DRF 10,00

183 Jharsuguda - Raigarh - TRR - 3.19 km (P) DRF 60,00

184 Jharsuguda - Raigarh - TRR - 3.38 km (P) DRF 96,60

185 Khodri - Khongsara - Renewal of wheel burnt rail - 7 km DRF 1,20,00

186 Durg - Nagpur - TRR - 15.44 km (P) DRF 1,05,64

Through Sleeper Renewal

187 Jharsuguda - Champa - TSR (P) - 15.85 km DRF 2,42,00

188 Anuppur-Ambikapur - TSR(P) - 8 km DRF 50,00

R.

189 Champa-Gevra Road - TSR(P) - 8.5 km DRF 4,80,00

R.

190 Bilaspur-Baraduar & Khodri-Bhanwar Tonk - TSR(P) - 21.95 km DRF 1,00,00

R.

191 Boridand - Bisrampur - TSR(P) - 6 km DRF 91,00

192 Annupur - Boridand - TSR(P) - 6 km DRF 64,00

193 Darekasa-Salekasa & Paniajob-Bortalao - TSR - 9 km (P) DRF 2,05,06

R.

Ballast

194 Bilaspur - Durg - TBR - 37.97 km DRF 3,82,11

195 Champa - Korba - TBR - 36 km DRF 1,14,00

196 Gondia - Chanda Fort - TBR - 50 km DRF 1,80,72

197 Gondia-Chandafort -TBR - 34.80 km DRF 54,15

198 Champa-Gevra Road - TBR - 26 km DRF 1,00

199 Jharsuguda-Champa - TBR - 14 km (patches) DRF 40,00

R.

200 Bilaspur-Anuppur- Katni - TBR - 49.25 km DRF 2,14,00

201 Durg-Dallirajhara - TBR - 38.8 km DRF 61,07

R.

202 Bilaspur-Durg - TBR - 62.11 km DRF 5,29,79

R.

203 Gondia-Chanda Fort - TBR - 70.875 km DRF 23

R.

204 Bilaspur-Pendra Road TBR 35 km DRF 3,46

R.

205 Gevra Road-Champa - TBR - 30.68 km DRF 1,50,00

R.

TRACK RENEWALS

Page 10: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.10

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

206 Kachewani-Durg - TBR 25.35 km DRF 40,05

R.

207 Gondia-Chanda Fort - TBR - 35 km DRF 1,23,12

R.

208 Bilaspur - Champa - TBR - 35 km DRF 2,34,00

209 Champa - Jharsuguda - TBR - 56.02 km DRF 1,50,00

210 Kachewani - Durg - TBR - 49.06 km DRF 23,42

211 Nagpur - Kachewani - TBR - 70.8 km DRF 35,84

212 Kanhan - Ramtek - TBR - 24.2 km DRF 13,81

Points & Crossings

213 Anuppur - Jhalwara - TTR - 37 sets DRF 50,00

214 Champa-Gevera Road - TTR- 62 sets DRF 50,00

215 Bilaspur Yards - TTR - 38 sets DRF 4,45,00

216 Raipur Stores Depot Yard - TTR- 40 sets DRF 77,68

217 Itwari & Gondiya Yards - TTR - 50 sets DRF 2,13,34

218 Bilaspur- Durg - TTR - 100 sets DRF 4,08,81

219 Bhilai Marshalling Yard - TTR - 46 sets DRF 42,18

220 Goberwahi & Tirodi Yards - TTR - 13 sets DRF 1,01,11

221 Jharsuguda - Bilaspur - TTR - 81 sets DRF 3,73,00

222 Bhilai Marshaling Yard & Raipur Store Depot Yard - TTR - 17 sets & derailing

switches - 3 sets

DRF 41

223 Chhindwara Yard - TTR (12 sets) DRF 1,00

R.

224 Bilaspur-Jharsuguda - TTR (107 sets) DRF 50,00

225 Bilaspur-Katni & Anuppur-Ambikapur - TTR (90 sets) DRF 50,00

226 Bilaspur Division - TTR (77 sets) DRF 50,00

R.

227 Durg-Nagpur - TTR (78 sets) DRF 5,47,51

228 Bilaspur-Durg - TTR (40 sets) DRF 1,22,55

R.

229 Bilaspur-Durg - TTR (46 sets) DRF 2,15,11

230 Durg -Nagpur -TTR - 100 sets DRF 4,26,13

231 Raipur Store Depot Yard - TTR (42 Nos) DRF 21,16

R.

232 Durg-Dallirajhara - TTR (15 sets) DRF 20,51

233 Durg-Dallirajhara - TTR (72 Nos) (Changed to Bhilai marshaling yard) DRF 1,08,89

R.

234 Nagpur - Durg - Thick web switches (30 sets) DRF 1,56,69

235 Bilaspur - Durg (Loop / Yard Lines) - TTR (68 sets) DRF 44,21

TRACK RENEWALS

Page 11: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.11

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

236 Durg - Dallirajhara - TTR (60 sets) DRF ..

237 Durg - Nagpur - TTR (207 sets) DRF 1,59,66

238 Jharsuguda-Champa - Thick web switches & weldable CMS crossings (39 sets) DRF 80,00

R.

239 Bilaspur-Jharsuguda Thick web switches & weldable CMS crossings (87 sets) DRF 4,08,00

240 Jharsuguda - Champa - Thick web switches (47 sets) DRF 2,00,00

241 Champa - Gevra Road - TTR (43 sets) DRF 2,00,00

242 Champa - Korba - TTR (48 sets) DRF 1,00,00

243 Bilaspur Division - TTR (40 sets) DRF 2,83,00

244 Anuppur - Katni - TTR (38 sets) DRF 1,28,00

245 Nagpur Division - TTR (72 sets) DRF 27,70

246 Bhilai Marshalling Yard - TTR (50 sets) DRF 90,21

Others

247 Jharsuguda-Bilaspur - SEJ - 100 Ssets. (60 kg. 85 sets. & 52 kg. 15 sets.) DRF 50,00

248 Durg - Nagpur - Through renewal of guled joints - 500 sets DRF 4,46,67

249 Bilaspur-Durg - Glued joint - 400 sets DRF 3,46,75

250 Bilaspur-Durg - TWR - 73 km DRF 1,66,42

251 Jharsuguda - Bilaspur - Glued joints - 285 sets DRF 5,00

252 Bilaspur - Durg - TWR - 33.95 km DRF 72,55

253 Jharsuguda - Bilaspur - TFR - 110 km DRF 50,00

254 Gondia - Nagbhir - TFR - 60 km DRF ..

255 Bilaspur-Durg - Glued joints (2400 sets) DRF 46,50

256 Bilaspur - Durg - TFR - 80.81 km DRF 4,41,06

257 Bilaspur Division - SEJs (200 Nos) DRF 50,00

258 Bilaspur-Durg - SEJs (100 sets) DRF 49,44

259 Tumsar-Tirodi (Branch Line) - TFR - 46.60 km DRF 1,52,56

260 Champa - Gevra Road - TWR - 23.08 km DRF 50,00

261 Gondia - Chanda Fort - TFR - 45 km DRF 80,00

262 Durg - Nagpur - TWR - 64.93 km DRF 1,48,60

263 Anuppur-Katni - TFR - 113.4 km DRF 20,00

264 Durg-Nagpur - SEJ - 150 sets DRF 20,78

265 Boridand - Bisrampur - TFR - 40 km DRF 1,50,00

266 Bilaspur-Champa - TWR - 18 km DRF 50,00

267 Bilaspur-Anuppur - TWR - 22 km DRF 80,00

268 Bilaspur-Durg - TWR - 34 km DRF 22,55

269 Bilaspur-Champa - TFR - 50 km DRF 50,00

TRACK RENEWALS

Page 12: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.12

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

270 Champa-Gevra Road - TFR - 38.2 km DRF 75,00

271 Jharsuguda-Champa - TFR - 55 km DRF 50,00

272 Durg-Nagpur - TFR - 92 km Up DRF 32,84

273 Bilaspur-Durg - TFR - 130.005 km DRF 1,31,10

274 Gondia-Chanda Fort - TFR - 93.4 km DRF 10

275 Durg - Nagpur - TFR - 188 km DRF 15,00

276 Bilaspur Division - TFR - 118 km DRF 45,00

277 Bilaspur - Durg - TFR - 71 km DRF 86,94

278 Durg - Nagpur - TFR - 47.53 km DRF 1,26,69

279 Bilaspur - Durg - TWR - 42.38 km DRF 2,08

280 Jharsuguda - Bilaspur - TWR - 53 km DRF 15,00

281 Anuppur - Katni - TWR - 38.4 km DRF 55,93

282 Jharsuguda - Champa - TFR - 52.939 km DRF 75,00

283 Champa - Bilaspur - TFR - 51 km DRF 70,00

284 Champa - Bilaspur - TWR - 65 km DRF 2,35,00

285 Durg - Nagpur - TFR - 79.25 km DRF 1,33,25

286 Bilaspur - Durg - TFR - 66.102 km DRF 1,21,58

287 Bilaspur - Durg - TWR - 32.535 km DRF 63,54

288 Works costing below Rs.2.5 crore each DRF 68,64,14

TOTAL-WORKS IN PROGRESS DRF 318,25,90

Complete Track Renewal

289 Raigarh - Champa - CTR (P) - 4.88 km DRF 50,00

R.

Through Rail Renewal

290 Durg -Nagpur (up) - TRR(P) -28.259 km DRF 3,10,88

291 Jharsuguda - Champa - TRR(P) - 11.312 km DRF 75,00

292 Urkura -Sorana - TRR(P) - 7.836 km DRF 2,63,22

293 Bilaspur - Anuppur - TRR(P) - 21 km DRF 75,00

294 Works costing below Rs.2.5 crore each DRF ..

TOTAL-NEW WORKS DRF 7,74,10

TOTAL-Track Renewals DRF 326,00,00

295 South East Central Railway - Repl. of steel girders with pre-stressed concrete

slabs (22 bridges)

DRF 50,00

296 Balaghat-Katangi - Protection work of bank & abutments (bridge No.66) and

leaning abutment (bridge No.12)

DF(4) 5,00

297 Chirimiri Yard - Conversion of skew girders to multiple box (bridge No.171) (6

lines)

DF(4) 32,23

TRACK RENEWALS

B - New Works

BRIDGE WORKS

A - Works in Progress

Page 13: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.13

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

298 Bilaspur Division - Toe walls in approaches of major bridges (16 Nos) DRF 50,21

299 Dagori-Nipania - Regirdering of one girder & rectification of camber (bridge

No.462-up)

DRF ..

300 Mahendragarh-Paradol - Rebuilding (bridge No.99) DRF 44,97

301 Durg-Dallirajhara - Strengthening of bridges for 25 ton axle load DRF ..

302 Jharsuguda-Bilaspur - Jacketing of piers, abutments, foundation, repl. of bearings

for 25 ton axle load & repl.of girders (6 & 2 bridges respectively)

DRF ..

303 Bilaspur-Durg - Strengthening of bridges for 25 ton axle load DRF 40,00

304 Nagpur-Durg - Jacketing & recapping of piers & abutments (bridge No 184-up &

348)

DRF ..

305 Bilaspur Division - Jacketing & widening of abutments and piers in bridges (60

spans)

DRF 86,93

306 Bilaspur Division - Repl of girders with pre-stressed / reinforced concrete cement

slabs (97 Nos) (68 bridges)

DRF 1,20,00

307 Bilaspur - Repl of flat bearing with centralised bearing (32 bridges) DRF 1,03,00

308 Works costing below Rs.2.5 crore each Cap. ..

DRF 5,04,89

DF(2) ..

DF(4) 1,66,70

TOTAL-WORKS IN PROGRESS Cap. ..

DRF 10,00,00

DF(2) ..

DF(4) 2,03,93

309 Works costing below Rs.2.5 crore each DRF ..

TOTAL-NEW WORKS DRF ..

TOTAL-Bridge Works Cap. ..

DRF 10,00,00

DF(2) ..

DF(4) 2,03,93

310 Anuppur-Katni - Second distant signal DF(3) 2,45,00

311 Bilaspur-Anuppur & Champa-Gevra Road - 2nd distant signals DF(3) 2,50

312 Raipur Division - Dual track detection system for improving availability of block

proving by axle counters

DF(3) 73,03

313 South East Central Railway - Data loggers (A-route) DF(3) 60,00

314 Ramtek, Gobarwahi, Dongri Buzurg & Tirodi - Repl of signalling & ground gears DRF 2,25,00

315 Latia - Repl of signalling & ground gears DRF 2,50,00

316 South East Central Railway - Track circuiting fouling mark to fouling mark (17

stations) (E-route)

DF(4) 1,00

BRIDGE WORKS

B - New Works

SIGNALLING AND TELECOMMUNICATION

A - Works in Progress

Page 14: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.14

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

317 Anuppur-Katni - Optic fibre cable link of STM-I with 6-quad underground cable

(160 km)

DRF 5,00

318 Raipur (Store Depot Yard) - Repl. of lever frames & ground gears by centralised

electrical operation of points & signals (end panel)

DRF 50,00

319 South East Central Railway - Permanent way material for completion of signalling

& telecommunication work

DF(4) 1

SRSF ..

320 Anuppur-Bishrampur - Optic fibre cable with 6-quad underground cable etc. (196

rkm)

DRF 1,00,00

321 Durg-Gondia - Automatic signalling Cap. ..

322 Bilaspur Division - Repl. of lever frames & signalling gears by central panel

interlocking over single line territory (10 stations) (E-Spl route)

DRF 2,00,00

323 Harrad, Kotma, Bijuri & Boridand - Repl. of lever frames and signalling gears by

central panel interlocking (E-Spl route)

DRF 1,50,00

324 Bilaspur Division - Home to fouling mark, fouling mark to block section limit and

loop line track circuiting (15 stations)

DF(4) 60,00

325 Bhilai (Peripheral Yard) - Repl.of lever frames & ground gears by centralized

electrical operation of points & signals at ore yard

DRF 20,00

326 Bhilai Marshalling Yard - Repl. of signalling & ground gears by route relay

interlocking (K & M cabins)

DRF 2,25,00

327 South East Central Railway - Fouling mark to home & fouling mark to block

section limit track circuiting (24 stations) (E-route)

DF(4) 1,70,00

328 South East Central Railway - Isolation and alteration of signalling (7 stations) DF(4) 2,25,00

329 Works costing below Rs.2.5 crore each DRF 5,95,00

DF(1) 2,15,57

DF(3) 7,99,71

DF(4) 1,31,48

TOTAL-WORKS IN PROGRESS Cap. ..

DRF 18,20,00

DF(1) 2,15,57

DF(3) 11,80,24

DF(4) 5,87,49

329a Kanhan-Ramtek - Optic fibre cable link (23 km) and Tumsar Road-Tirodi (47 km) DF(3) 1

330 Works costing below Rs.2.5 crore each DRF ..

DF(4) ..

TOTAL-NEW WORKS DRF ..

DF(3) 1

DF(4) ..

TOTAL-Signalling and Telecommunication Cap. ..

DRF 18,20,00

DF(1) 2,15,57

DF(3) 11,80,25

DF(4) 5,87,49

SIGNALLING AND TELECOMMUNICATION

B - New Works

Page 15: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.15

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

331 South East Central Railway - Direct power supply from central generating

agencies

Cap. 5,62,85

332 Works costing below Rs.2.5 crore each DRF 1,15,00

DF(1) 8,36

DF(2) 7,96

DF(3) 65,68

TOTAL-WORKS IN PROGRESS Cap. 5,62,85

DRF 1,15,00

DF(1) 8,36

DF(2) 7,96

DF(3) 65,68

333 Works costing below Rs.2.5 crore each DRF ..

DF(1) ..

DF(2) ..

DF(3) ..

TOTAL-NEW WORKS DRF ..

DF(1) ..

DF(2) ..

DF(3) ..

TOTAL-Other Electrical Works excl TRD Cap. 5,62,85

DRF 1,15,00

DF(1) 8,36

DF(2) 7,96

DF(3) 65,68

334 Bilaspur Division - Modification of overhead equipment over main line DF(3) 1

335 Durg-Nagpur - Reliability improvement work of overhead equipment DRF 1,62,27

336 Bilaspur Division - Repl. of electrical equipment & modification of overhead

equipment

DRF 96,23

337 Himgir - New traction substation & associated 132 kv transmission line from

Orissa State Electricity Board (30 km)

DF(3) 6,69,77

338 Bilaspur Division - Repl of Scada system with updated system DRF 2,00

339 Works costing below Rs.2.5 crore each DRF 1,95,50

DF(3) 10,56

TOTAL-WORKS IN PROGRESS DRF 4,56,00

DF(3) 6,80,34

340 Bilaspur Division - Interrupters for sidings DF(3) 1

341 Works costing below Rs.2.5 crore each DRF ..

DF(3) ..

TOTAL-NEW WORKS DRF ..

DF(3) 1

TOTAL-Traction Distribution Works DRF 4,56,00

DF(3) 6,80,35

OTHER ELECTRICAL WORKS EXCL TRD

A - Works in Progress

B - New Works

TRACTION DISTRIBUTION WORKS

A - Works in Progress

B - New Works

Page 16: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.16

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

342 Nagpur Workshop - Setting up of broad gauge coach periodical overhauling shed

for 27 non airconditioned coaches

Cap. ..

343 Raipur Workshop - Extension of body repair shed towards stripping section (60

m)

DF(3) 70,57

344 Bhilai Marshalling Yard - Extention of covered shed DF(3) ..

345 Bhilai - Augmentation of facilities in main line electrical multiple shed (Phase-III) DF(3) ..

346 Motibagh Workshop - Broad gauge loco shed for maintenance of 15 locos DF(3) 69,00

347 Gondia - Maintenance facilities for diesel electrical multiple unit rakes & broad

gauge diesel locos (Phase-II)

DF(3) 1,13,84

348 Bhilai - Expansion of main line electrical multiple unit shed with necessary

facilities (Phase-II)

Cap. 1,64,42

349 Bhilai (Electric Loco Shed) - Augmentation of homing capacity from 150 to 175

alongwith 3-phase facilities

Cap. 44,56

350 Raigarh - New electric loco shed with holding capacity of 100 locos Cap. 6,19,42

351 Durg - Upgradation of coaching depot (Phase-III), extension of washing & pit lines

to accommodate 26 coaches

DF(3) 5,47

352 Gondia - Development of facilities for premium examination line & maintenance

sick line of freight stock

DF(3) ..

353 Gondia - Development of facilities for maintenance of coaching stock and

creation of covered shed

DF(3) 1,27,00

354 Korba - Upgradation of freight maintenance facilities DF(3) ..

355 Bilaspur - Extension of intermediate overhauling shed at coaching depot DF(3) 2,35,07

356 Raipur (Diesel Shed) - Expansion of capacity to home WDG4 locos Cap. 11,97,81

357 Motibagh Workshop - Setting up of a unit for environment friendly coach toilets DF(3) 9,44,40

358 Works costing below Rs.2.5 crore each DRF 70,77

DF(2) ..

DF(3) 4,67,76

DF(4) 24,08

TOTAL-WORKS IN PROGRESS Cap. 20,26,21

DRF 70,77

DF(2) ..

DF(3) 20,33,11

DF(4) 24,08

359 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(3) ..

TOTAL-NEW WORKS Cap. ..

DRF ..

DF(3) ..

WORKSHOPS INCLUDING PRODUCTION UNITS

A - Works in Progress

B - New Works

Page 17: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.17

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

TOTAL-Workshops including Production Units Cap. 20,26,21

DRF 70,77

DF(2) ..

DF(3) 20,33,11

DF(4) 24,08

360 Brajrajnagar - Type-II - 70, type-III - 10 & typeIV - 4 units Cap. 22,00

361 Brajrajnagar - Type-II & III - 15 units each & type-IV - 1 unit Cap. ..

362 Korba - Type-II - 30, type-III - 10 & type-IV - 5 units Cap. 1,53,37

363 Raipur - Type-II - 20, type-III - 30 & type-IV - 6 units Cap. 3,09,54

364 Bilaspur - Repl. of out-houses, type-I - 50 units DRF ..

365 Bilaspur - Repl.of quarters, type-II - 142 units DRF ..

366 Bilaspur - Repl.of quarters, type-IV - 61 units DRF 53,50

367 Bilaspur - Repl.of quarters, type-I - 401 units DRF 2,18,42

368 Raipur - Repl. of quarters, type-I - 96 units with type-II Cap. ..

369 Raipur - Repl of quarters, type-I - 64 units with type-II - 64 & type-IV - 1 unit at

Durg colony

DRF 1,05,65

370 Raipur - Type-V - 11 & type-IV - 20 units at Settlement Cap. 20,00

371 Raigarh - Repl of quarters, type-II - 46 & type-III - 1 unit DRF 1,70,00

372 Bilaspur Division - Repl. of quarters, type-III - 50 units DRF 1,50,00

373 Bilaspur - Repl of quarters, type-V - 24 units DRF 22,33

374 Works costing below Rs.2.5 crore each Cap. 4,13,25

DRF 1,12,10

TOTAL-WORKS IN PROGRESS Cap. 9,18,16

DRF 8,32,00

375 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

TOTAL-NEW WORKS Cap. ..

DRF ..

TOTAL-Staff Quarters Cap. 9,18,16

DRF 8,32,00

376 Bilaspur (Central Hospital) - Repl/renovation of wards, labour room, out patients'

department, radiology & physiotherapy units and miscellaneous works

DRF 1,60,18

377 Bhilai Marshaling Yard - Repl of pipeline (18 inch dia) and pump DRF 1,20,12

378 Bilaspur - Expansion of divisional railway hospital DF(2) 24,85

379 Bhilai Marshaling Yard & Bhilai - Improvement of staff quarters & colonies (Phase-

I)

DF(2) 66,17

380 Nagpur - Repl of doors, windows & jafferies in quarters and improvement to

colony roads

DRF 20,00

381 Bilaspur Division - Rewiring of staff quarters (2435 Nos) and repl of lights & fans

with energy efficient lights & fans

DRF 40,00

382 Raipur - 12 dia cast iron pipeline parallel to 14 dia pipeline and repl of pumps DF(2) 74,03

STAFF QUARTERS

A - Works in Progress

B - New Works

AMENITIES FOR STAFF

A - Works in Progress

Page 18: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.18

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

383 Bilaspur Division - Improvement of staff quarters (Phase-III) DRF 1,00,00

384 Nagpur Division - Rewiring of quarters (2233 Nos) DRF 45,20

385 Works costing below Rs.2.5 crore each Cap. 5,50

DRF 1,63,50

DF(1) 11,68

DF(2) 5,38,27

DF(3) 83,10

TOTAL-WORKS IN PROGRESS Cap. 5,50

DRF 6,49,00

DF(1) 11,68

DF(2) 7,03,32

DF(3) 83,10

386 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(2) ..

TOTAL-NEW WORKS Cap. ..

DRF ..

DF(2) ..

TOTAL-Amenities for Staff Cap. 5,50

DRF 6,49,00

DF(1) 11,68

DF(2) 7,03,32

DF(3) 83,10

387 Bhatapara, Tilda, Raipur & Bhilai Power House - Extension of platform for 24

coach trains

DF(1) ..

388 Bhilai (G & H Cabin), Bhilai Nagar, Belha & Hathband - Extention & raising of

platforms

DF(1) ..

389 Bilaspur-Durg - Raising of platforms (9 stations) (A-route) DF(1) 25,98

390 Raipur - Development of circulating area at Gudiyari side DF(1) 6,44

391 Itwari - Development of circulating area with booking office & entrance; extension

of foot over bridge and provision of catering stall & parking stand

DF(1) 60,00

392 South East Central Railway - Escalators at various stations (4 Nos) (2 stations) DF(1) 75,00

393 Works costing below Rs.2.5 crore each DRF 7,10,77

DF(1) 28,62,75

DF(2) 25,62

DF(3) 1,90,17

TOTAL-WORKS IN PROGRESS DRF 7,10,77

DF(1) 30,30,17

DF(2) 25,62

DF(3) 1,90,17

AMENITIES FOR STAFF

B - New Works

PASSENGER AMENITIES

A - Works in Progress

Page 19: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.19

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

394 Works costing below Rs.2.5 crore each DRF ..

DF(1) ..

TOTAL-NEW WORKS DRF ..

DF(1) ..

TOTAL-Passenger Amenities DRF 7,10,77

DF(1) 30,30,17

DF(2) 25,62

DF(3) 1,90,17

395 Raipur - New division Cap. ..

DF(3) ..

396 Bilaspur - Creation of new railway zone Cap. ..

DF(3) 4,85

397 Raipur - 50-bedded divisional hospital DF(2) ..

398 South East Central Railway - Integrated security system (3 stations) Cap. 5,00,00

399 Raipur (General Stores Depot) - Extension of godown DF(3) 92,45

400 Raipur - Construction of officers' rest house Cap. 52,57

401 Works costing below Rs.2.5 crore each Cap. 42,90

DRF 50,00

DF(1) 4,08

DF(2) 3,38,43

DF(3) 2,55,96

DF(4) 6,27

TOTAL-WORKS IN PROGRESS Cap. 5,95,47

DRF 50,00

DF(1) 4,08

DF(2) 3,38,43

DF(3) 3,53,26

DF(4) 6,27

402 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(3) ..

TOTAL-NEW WORKS Cap. ..

DRF ..

DF(3) ..

TOTAL-Other Specified Works Cap. 5,95,47

DRF 50,00

DF(1) 4,08

DF(2) 3,38,43

DF(3) 3,53,26

DF(4) 6,27

PASSENGER AMENITIES

B - New Works

OTHER SPECIFIED WORKS

A - Works in Progress

B - New Works

Page 20: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.1.20

SOUTH EAST CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

TOTAL-WORKS IN PROGRESS Cap. 521,40,19

C.Fund 252,89,00

DRF 378,64,69

DF(1) 33,23,20

DF(2) 10,75,33

DF(3) 66,71,81

DF(4) 8,21,77

S.Fund 107,37,85

Dep(RVN) 29,84,00

EBR 33,32,00

TOTAL - NEW WORKS Cap. ..

DRF 7,74,10

DF(1) ..

DF(2) ..

DF(3) 2

DF(4) ..

S.Fund ..

GRAND TOTAL Cap. 521,40,19

C.Fund 252,89,00

DRF 386,38,79

DF(1) 33,23,20

DF(2) 10,75,33

DF(3) 66,71,83

DF(4) 8,21,77

S.Fund 107,37,85

Dep(RVN) 29,84,00

EBR 33,32,00

Page 21: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch

14.2.1

SOUTH EAST CENTRAL RAILWAY

MACHINERY AND PLANT PROGRAM FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15

403 System of online monitoring of rolling stock (OMRS) (6 Nos) DF(3) 1

404 Raipur - Hydraulic wheel press (500 ton) DRF 13,23

405 Raipur - Underfloor wheel lathe DRF 2,93,70

406 Raipur - CNC surface wheel lathe DRF 4,85,41

407 Bhilai - CNC surface wheel lathe Cap. 3,69,65

408 Nagpur - Simulator in motion type Cap. 1

409 Raipur - Simulator in Motion Type DF(3) 1

410 Raipur workshop - AJTB Lathe (BG) Cap. 42,15

411 Works costing below Rs.2.5 crore each Cap. 1,01,87

DRF 3,13,47

DF(2) ..

DF(3) 2,34,52

TOTAL-PROGRAMMED DELIVERIES Cap. 5,13,68

DRF 11,05,81

DF(2) ..

DF(3) 2,34,54

412 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(2) ..

DF(3) ..

TOTAL-NEW ACQUISITION Cap. ..

DRF ..

DF(2) ..

DF(3) ..

TOTAL-Machinery & Plant Cap. 5,13,68

DRF 11,05,81

DF(2) ..

DF(3) 2,34,54

B - NEW ACQUISITION

AllocationParticulars

A - PROGRAMMED DELIVERIES