ENTRIX, Inc. WRIA 18 Watershed Plan
1.0 INTRODUCTION AND PLANNING FRAMEWORK
This section introduces watershed planning and describes its framework of related natural resources management and planning.
• Section 1.1 introduces the framework for watershed planning in Washington State and describes how it has been applied in this Watershed Plan.
• Section 1.2 summarizes the history of watershed planning in Watershed Resource Inventory Area 18 (WRIA 18), describing the differences between the east and west WRIA 18 planning processes.
Watershed planning occurs under enabling legislation passed in 1998, and is closely tied to planning for other water and watershed resources, including salmon recovery, local land use planning, water system planning, stormwater management, and a host of other federal, state, regional and local laws, regulations, and planning initiatives. These were each reviewed and considered in the development of this watershed plan and are profiled briefly in Appendix 1-A. Related recommendations from other plans, studies and processes in WRIA 18 are listed in Appendix 1-B. Related documents (such as the Water Users Association Rules and Regulations) are in Appendix 1-C.
1.1 WATERSHED PLANNING IN WASHINGTON
In 1998 the Washington State Legislature passed Engrossed Substitute House Bill 2514, the Watershed Management Act (WMA) (RCW 90.82) to provide a framework for locally-based watershed planning and resource management. The primary goals of local watershed planning are to assess the status of water resources within Washington’s 62 Watershed Resource Inventory Areas (WRIAs) and determine how to address competing demands for water within each WRIA. A stated purpose of the statute is “... to develop a more thorough and cooperative method of determining the current water situation in each water resource inventory area of the state and to provide local citizens with the maximum possible input concerning their goals and objectives for water resources management and development.”
A Watershed Plan may be written for each WRIA in the State. This Plan addresses WRIA 18, stretching from Sequim Bay, just east of the Dungeness River, in the east, to the Elwha River, in the west (Figure 1.1-1 and Figure 1.1-2). Parts of WRIA 17 are also incorporated under an interlocal agreement encompassing Sequim Bay and the drainages feeding it (the westernmost portion of WRIA 17).
The WMA mandates certain steps for the watershed planning process, particularly in organizing and adopting the plans. The law also sets forth certain questions and broad parameters to be addressed in the plans. However, the legislature chose to leave local watershed groups with a great deal of flexibility in carrying out their work and does not mandate a particular approach to watershed planning.
The WMA establishes a process to create local “Planning Units,” which carry out the planning process. It also provides a framework for these local bodies to assess current
Chapter 1 Introduction and Planning Framework Page 1-2
ENTRIX, Inc. WRIA 18 Watershed Plan
and future water supply and water use, address water quality and habitat issues, and recommend instream flows for streams and rivers in each WRIA. These four – water quantity, water quality, habitat, and instream flows – are the basic elements of 2514 watershed planning. As salmonid stocks occupying large areas of Washington habitat have come under the protection of the Endangered Species Act (ESA), watershed plans incorporate salmon recovery and develop strategies to address these listings.
While watershed planning itself is not mandatory, once a decision is made to undertake planning, the Act requires some elements and allows Planning Units discretion in undertaking others. Watershed Plans must address water quantity and strategies for water supply; water quality, habitat and instream flows are optional. Instream flows may be referred to the Washington Department of Ecology (Ecology) for action, if desired. By unanimous vote, Ecology may be requested to change an existing instream flow. With unanimous agreement of governmental members and majority support of non-governmental members of a Planning Unit, Ecology will adopt a rule to implement an instream flow on a stream where a minimum flow has not yet been set (RCW 90.82.080).
A draft Guide to Watershed Planning and Management was published in January 1999 by Ecology in conjunction with State associations of cities, counties, public utility districts, sewer and water districts, and irrigation districts. The Addendum to the Draft Guide to Watershed Planning and Management (Ecology 2001a) was issued in October 2001. The Addendum provides extensive detail on the context and planning framework for watershed planning. The Guide and Addendum serve as a manual to assist Washington’s local governments and tribes with watershed planning and management under the WMA. Ecology has also published a series of short summaries of 2514 watershed planning to clarify expectations for local Planning Units.
1.1.1 How Watershed Planning Is Initiated
Watershed planning may be initiated only with the concurrence of all counties with territory in a WRIA, the largest city or town located within the WRIA, and the water purveyor that obtains the largest quantity of water from the WRIA. These “initiating governments” must invite Native American Tribes with reservation lands within the WRIA to join them. Other affected tribes must also be invited, including those with federal fisheries resource rights in the WRIA, federally reserved water rights claims on WRIA resources, or federally-approved water quality standards in the WRIA or affected by waters of the WRIA. If tribes choose to join, as they have in WRIA 18, they too become initiating governments.
The initiating governments choose a lead agency (Clallam County, in the case of WRIA 18), and undertake an organizing phase (Phase 1), which includes developing a planning process; determining a scope of work; convening a Planning Unit broadly representative of water resource interests in the WRIA; developing necessary interlocal agreements; and applying for watershed assessment (Phase 2) and watershed planning (Phase 3) grants. The initiating governments, tribes, and other members of the planning unit have considerable flexibility to set the planning process, focus watershed
16 1518 17
16 15
13
21 2322 24 19 20 21 22
282527 30 29
28
34 36 31 32 3334
3 2 61 54 3
1112 7
89 10
14 1318
1716 15
22 23 2419
2021 22
262728
33 3534
45 3 2 1 6 54
11 12 7 9 10 11 12 879
14 13 18 1715 14 1813 17
21 22 23 24 19 20 22 2324 19
20
27 26 25 3029
3435 36 3231
33
4 3 12 6 5 4
10 11 127 98 10 11 12 7 8 9 10
15 14 1318 1517 16 14 13 18 17 16
22 23 24 19 20 21 2223 24 19 20
21
26 2530 29
2
26 25 3027
36 31
231
9 108
10
16 15
0
21
2728 2625 30 29 28
33 34 35 3631 32 33
4 3 2 16
5
9
16
15
R 4
WR
3 W
T 31 NT 30 N
T 31 NT 30 N
R 5
WR
4 W
T 30 NT 29 N
R 5
WR
4 W
R 4
WR
3 W
R 3
WR
2 W
T30NT29N
R 3
WR
2 W
Strait of Juan De Fuca
Sequim
Bay
Dungeness Bay
SmithLake
Dis
cove
ry B
ay
Cat Lake
Dungeness Bay
SEQUIM
SEQUIM
Strait Of Juan De Fuca
McD
ona
ld
McD
onal
d C
reek
Creekot
ti
Riv
er
Creek
For
k
Sie
ber t
Cre
e k
Sieb
ert C
reek
Emery Creek
Cre
ek
ald
Cr
McD
on
River
Dun
gene
ss
Ma t
r i
Bear C
reek
Cre
ek
Dun
gen
ess
Rive
r
Bea
r Bel
l
Bell
Cre
ek
John
son
Dun
gen Jo
hnso
n
Creek
Pat
s C
reek
Creek
Ca
nyon
Cre
ek
Can
yon
Car
aco
Creek
ess R
iver
nald
McD
o
Creek
Lit
tle
Little
McD
onald Creek
Eas
t F
ork
S ieb
ert
Cre
e k
eek
Can
yon
Creek
Cre
ek
Cr e
ek
Pats Creek
Creek
Matri
eek
Creek
Mea
d
Cas
s ale
r y C
reek
owb
rook
ot t
iC
reek
Ped
ers
Creek
on
East
Siebert
Cre
ek
Fork
Wes
tS
iebe
rt
sk
Riv
er
Roc
k
Cr e
e k
Cre
ek
Dean
com
eJi
mm
yl a
tely
Cre
ek
Creek
Cre
ek
Gie
rin
aler
yC
reek
Du
ngen
ess C
ass
Creek
Siebert
Jimmy latelycome Creek Jimm
ycom
Fork
East
elately Creek
EagleCreek
Eagle Creek
Protection Island
(Jamestown Tribe)
(Jamestown Tribe)
Jeff
erso
n C
ount
y
Cla
llam
Cou
nty
Sequim B
ay
Strait of Juan De F
uca
6
16
OL
YM
PIC
RA
NC
H L
N
RA
INB
OW
SE
ND
LN
OLSTEAD LN
MAJESTY WY
CO
SM
OS
LN
ALPINE VIEW LN
LE
PR
EC
HA
UN
LN
CAMERON ACRES LN
BR
EE
ZESCHILKE WY
RIT
TE
R R
D
FALFA LNWY
CR
EE
KS
IDE
DR
THUNDER RD DUCE LN
CH
ES
SIE
LN
BONITA LN
SKY LNMISTY GLEN LN
ONAGER LN
RANCH RDLEISURE LN
ROMAN RD
WESTWIND DRSHELLY LN
ED
MO
NS
ON
DR
MIS
TY
GLE
N L
N
J SHEA WY
HARMONY LN
RU
BE
NS
RD
REICH LN
WINTER RD
LOAFER LN
DAVENHILL LN
MC
D
EATON LN
N
GIE
RIN
CR
EE
K L
N
HIGGINS LN
CLIFF ROBINSON LN
E GLACIER VIEW DR
PIERSONLN
YENTNA LN
JENIFER CT
MY
WY
PARK
MEMORY LN
RIL
LA
LN
LE
RO
UX
RD
LE
S S
AIN
TS
RD
FR
ED
ER
ICK
D
R
MO
UN
TA
IN S
PR
ING
S L
N
BL
UE
SH
AD
OW
LN
MORNING HILL LN
OCEAN VIEW DR
RED DEER DR
INDIGO EAGLE WY
CEDAR HILL LN
WRIGHT LN
GRANDVIEW LN
SCENIC PL
CRICKET LN
SOLAR LN
MC
LO
LN
VALLEY CENTER PL
HARRISON RD
MA
RJO
RY
LN
FIR
STRAWBERRY LN
KEESHASCROSSING
DR
GR
EE
N M
EA
DO
WS
DR
BL
VD
SEQUOIA LN
MO
NT
IHIL
L L
N
LONE FIR LNMU
ST
AN
G L
N
CHARLES ROBERTS RD
LN
SU
NN
Y D
ELL
LN
VIEW
DR
FE
RN
GU
LL
Y L
N
WIL
DE
RS
LN
COUNTRY
CREEK ESTATES RD
E EMERALD FOREST LNW EMERALD FOREST LN
SI S
TE
RS
LN
BR
AD
Y
LN
RIV
ER
DA
LE L
N
GL
EN
DA
LE
DR
AS
LA
N D
R
TIMBERSIDE LN DE
ER
HA
VE
N D
R
LETHA LN
STRAWBERRY FIELD DR
MA
RIN
A'S
WY
TIMOTHY LN
KN
UT
SE
N
DONAPER RD
CO
ZY
LN
PHEASANT RUN DR
MILKY WY
TWIN PEAKS LN
CHILDERS LN
WINDY WYIDEA PL
DA
VID
SO
N D
R
CA
ME
LOT R
D
RU
NN
ION
VIE
W W
Y
YADA WY
CUTTY
LN
RE
DW
ING
DR
KIRNERRIDGE LN
NO
RT
H-
RID
GE
LN
RI D
GE
RD
SYLVANST
ON
EH
AV
EN
LA
NE
W HIDDENRIDGE RD
E HIDDEN RIDGE RD
HA
YW
IRE
LN
FENCEBIRD LN
CLA
RY LN
HILLTOP DR
SUNSET
VIEW LNQUAIL MEADOWS DR
TULIP LN
PE
AR
L
PL
TH
RE
E
FIR
S L
N
TW
IN F
AW
N L
N
HYTIME
WINDSONG LN
GREEN VALLEY LN
GR
EE
NS
WY
MCCARTERPL
KITFOX LN
DUN
GEN
ESS
COYOTEE PASS
ME
AD
OW
VA
LL
EY
LN
SEA
HAW
K D
R
LONE
NIS
BE
T R
D
WILD
ROSE
LN
EAGLE LN
CHICKADEELN JACOB LN
CH
ICKAD
EE
LNWARD LNHENKES RD
COUGARHEIGHTS DR
BON JON VIEW WY
MACAW
AJOHNCARL RDTODD RDCAROL RD
LEESON WY
COTT
AGE LN
HO
NE
YB
EELN T
RA
ILS
EN
D L
N
SH
AD
OW
TR
SNOWBERRY LNHA
VE
NW
OO
D L
N
LA
UR
A
LN
FRANK RD
SABLE CTLAURA
LN
KIWI LN
HA
RR
IER
WY
CURLEW CTTE
RR
I TO
RY
RD
ME
YE
R -
AN
DR
EW
LN
AL
DR
ICH
LN
MACBETH PL
LO
NG
CR
EE
K L
N
CE
DA
R B
EN
D L
N
CO
UN
TR
Y L
ND
OR
OT
HY
HU
NT
LN
LU
ND
LN
SA
MP
SO
N
C
T
SAVANNAH LN
AP
PL
E B
LO
SS
OM
LN
LA
ZY
LN
BL
UE
GR
AS
S L
N
WESTGATE LN
SHILOH LN
SHEREE LN
GEOLAINE
WY
LN
LAZY CREEK LN
RIAH RD
JAY
RD
CA
TH
Y C
T
PO
ND
LN
GRIFFITH FARM RDLIV
EN
GO
OD
KN
IGH
T A
VE
ST
AR
ES
LN
MOLENDALN HARRIETTE LN
PLUM TREE LN
IOKA RDSANFORD LNCRYSTAL
CT
MARIAN WYCOVINGTON CT
CHERRYWOOD PL
RAINVIEW LN
TR
OW
-B
RID
GE
CT
DUKE DR
JESSLYN LN
DR
HERONWY
NE
RSGOLD CT
(WAYNE WY)
PUFFINPL
ANCHOR
C
OVE
LN C
RO
WN
VIE
W
LN
N
MA
LIA
LN
W TURNHERERD N
L
EE
LN
JUA
NIT
AC
T
W PHEASANT LN
E PHEASANT LN
E QUAIL LNQUAIL LN
EASTGATE PL
MOCKINGBIRD LN
S
PE
AC
EF
UL
ME
AD
OW
LN
S
MIS
TY
ME
AD
OW
LN
WAGNER LN
MICHELLE LN
STAMPEDE DR
QU
AR
TE
R H
OR
SE
LN
HILLS
IDE
DR
COYOTE MEADOW LN
DENCE DR
PATRIOT
WYAMERICA BLVD
SA
ILO
R'S
LN
OV
ER
ST
BA
Y R
IDG
E P
L
MARINERS VIEW DR
O'C
ON
NO
R
OWLS NEST RD
FAWN LN
RD
QUAILS R
OOST
HAW
KS WY
COVEY RUN
LN
RU
N R
D
RAVENS RIDGE RD
DO
E
LAKEVIEW DRFORESTVIEW DR
LA
KE
OF
VIE
W D
RL
AK
E
(EAGLE'S
REST LN)
FARNSWORTH
FARMVIEW RD
DELTA WY
BE
LL
ME
AD
OW
LN
OL
D C
OY
OT
E W
Y
FOXFIRELN
DOE
CL
AR
AC
RE
ST
LNTO
KEN
LN
RU
N R
D
FOX HOLLOW R
D
W ECHO LN
ELK PASS RDDOE RUN RD
CO
YO
TE
RID
GE
RD
SPRINGWATER LN
PA
LO
MI N
OL
N
CAR
RIA
GE
BELL CREEK LN
DR
HUFFMAN HEIGHTS RD
HE
RE
F
SAM
ISH
DR
PONY LNDOE RUN RD
FO
X H
OL
LO
W R
D
MORGAN
ELK HEIGHTS
ST
AM
PE
DE
DR
BRAZIL RD
BR
AZ
I L R
D
VI C
KI
LY
NN
E D
R
WINDMILL LN BEESON RD
MC
CO
MB
LN
ME
AD
OW
ME
ER
LN
MCCOMB LN
LOTUS LN
BIG
SK
Y LNL
I VIN
G W
AT
ER
S L
N
SUNNYBROOK LN
RIV
ER
VIE
W D
R
FERGY LN
BOGEY LN
LO
IS L
N
BO
OT
H L
N
KL
AH
N C
OU
NT
RY
RD
PR
IES
T L
N
BRIAR LN
PRIEST LN
FO
XT
AIL
LN
GU
LL
S L
N
IDL
EW
OO
D L
N
PA
TR
ICIA
LN
KA
ISE
R P
L
GR
AC
E
LN
MARLO DR
EL RIO LN
KE
TT
Y
LN
GIL
LIS
A
VE
DAISY LN
SIL
BE
R L
N
QU
IET
PL
LAVERNE LN
WHITE DEER LN
NEAL LN BLYN SPRINGS RD
BLYN POND RD
BLYN SPRINGS RD
OW
L LN
GR
ACE
CH
ICK
EN
HO
LLO
W R
D
DR
RD
INNER BAY LN
RIV
ER
S E
ND
RD
DEER TRAILS WY FRIENDLY LN
OCEAN SOUND LN
AMBER LNFOXTROT LN
PRIMROSE LN
W S
EASH
OR
E LN
E SEASHORE LNMAYNARD RDLANDS
END LN
GR
EY
WO
LF
AIR
C
T
JAMESTO
WN BEACH LN
SE
AS
HO
RE
RD
RO
BE
RS
ON
RD
ROBERSON RDMA
RIN
ER
S
PO
I NT
RD
SEAWARD
HU
NT
ER
S
MARITIME DR
WIL
DF
LO
WE
R L
N
CA
LB
ER
T R
D
MARSH HAWK LN
MA
R V
IST
A W
Y
GR
AY
SM
AR
SH
LN
DUN ROLLIN LN
REBEL LN
FE
RN
RD
MEADOW RIDGE WY ONE HORSE LN
TS
CH LN
DE
ERC
T
BUCK CT
BLUE ICE TER
RAINTREE LN
CA
NY
ON
ES
TA
TE
S D
R
DO
E
CR
ITT
ER
COUNTRY TR
RD
BAYWOOD VILLAGE RD
ROW
GIN
GE
R R
D
CASSIE-BOYCE LNYAR
SKUNK HOLLOW
RD
FIREWEED RD
AM
ER
ICA
BL
VDAMERICA BLVD
EQUUS LN ALASKA WY
MARIPOSA LN
WHITETAIL LNIN
DE
PE
N
FL
AN
DE
RS
RD
(LIBERTY WY)
BIG
FO
OT
LN
WE
BB
RD
JUNCO RD
HE
AD
GA
TE
RD
CURTIS LNEMERY LN
TIMBERLINE DR
RONDALE DR
RID
GE
R
D SNOW LN TRAXINGER TR
DEER RIDGE LN
BL
UE
KAYDA LN BURLING RD
FIR
EW
EE
D R
D
BL
UE
VA
L LE
Y R
D
RA
VE
N H
ILL
RD
GR
OU
SE
R
UN
R
D
CE
DA
R C
RE
EK
DR
HILL RD
DUNGENESS
MEADOWS
FA
WN
DA
LE
PL
DELL RAY DRBUZZARD RIDGE RD
WA
LLA
CE
WY
PL
GOA WY
KA
NE
LN
TOAD RD
TOAD RD
MICHAEL EARL WY
HERON HILL RD
SH
AW
NE
L
N
PIKE PL
PA
UL
JO
SE
PH
TE
R
WILD
WO
OD
LN
WILDWOOD LNSCHOOL HOUSE LN
CHRISTOPHER LN
SH
AU
NA
LN
DR
E MINDY LN
W MINDY LN
MAPLE LEAF LN
RO
AD
LES
S
TR
AV
EL
ED
WY
NICKI LN
GL
EN
R
D
LANDGROVE LNCLOVER LN
PLAIN JANE LN HODIS LNMICHAELS RD
GREY HAWK LN
RIVER RUN RDBONNEVILLE LN
ATWOOD PL
FE
RN
DA
LE
DR
SE
RE
NIT
Y LN
FOREST HAVEN DR
JOURNEY WY
WA
GG
LE
R W
Y
OL
D D
AD
'S R
D
PARADISE LN
SW
ALLO
W H
ILL R
D
VIEW DR VALLEY
HEIGHTS DR
MA
PLE C
RE
EK
LN
DR
CAS
CAD
E VIEW
DR
VISTA DEL MAR DR
LOUELLA RIDGE RD
GLACIER R
IDGE R
D
JON
QU
ILLE
PL
HILLS
RD
MIDNIGHT SUN LN
BAKER VIEW
RIDGE RD
TOO
K A
LOO
K LN
MC
CO
RM
ICK
TER
TOOK A LOOK LN
BA
KER
VIE
W D
R
GRAYWOLF RIDGE RD
GL
EN
NS
VA
LL
EY
RD
NO
RR
IS R
D
LOSTW
OO
D LN
ENTERPRISE LN
HIGH COUNTRY DRHIGH COUNTRY DR
LO
ST
M
OU
NT
AIN
L
N
TE
XA
SV
AL
LE
Y R
D
MARMOT LP
TR
EE
CA
MP
RD
VIEW
DR
DORY RD
OLD OLYMPIC HWY
LA
DY
BU
G L
N
LE
WIS
RD
PETERSON RD
PERCIVAL RD
HEUHSLEIN RD
GE
HR
KE
RD
GEHRKE RD
FINN HALL RD
MA
TS
ON
RD LINDERMAN RD
SP
RIN
G R
D
SH
OR
E R
D
HIGHWAY 101
HO
ME
LN
OLD OLYMPIC HWY
HOWE RD FRANSON RD
N BARR RD
N
BA
RR
RD
N
BA
RR
RD
ABBOTT RD
GU
NN
RD
MONTERRA DR
SEA
BLUFF LN
HE
AT
HE
R C
IR
HO
LL
EY
C
IR
IVY LN
CYPRESS
CIR
RA
DR
GU
NN
RD
VO
GT
RD
VOGT RD
MO
UN
TA
IN V
IEW
CI R
OS
BO
RN
RD
AG
NE
W P
KW
Y
RU
BY
RD
KATE'SCT
CA
ME
RO
N R
D
OLS
TE
AD
RD
PINNELL RD
VA
UT
IER
RD
DR
N S
OL
MA
R
MCDONALD
DR
S SOLMARDR
DRYKE RD
FINN HALL RDMO
NT
ER
(CIRCLE DR)
DR
GATE LN
TYLER V
IEW
PL
GREYWOLF RD
KIT
CH
EN
- D
ICK
RD
BUCKHORN RD
CA
ME
RO
N R
D
RIDGE VIEW DR
RIDGE PL
JUNE PL
E ROBERT PLW ROBERT PL
NIC
OL
E
PL
STEVE PL
PE
RC
Y LN
JOSEPHINE PL
NELLO
PL
LOTZGESELL RD
HO
LG
ER
SO
N R
D
HOGBACK RD
LOTZGESELL RD
DICKINSON ST
CA
YS
RD
KO
EP
PE
DR
W BEDINGER RD E BEDINGER RD
SC
HO
TT
RDW
HE
ELE
R R
D
MACLEAY RD
OLD OLYMPIC HWY
OLD OLYMPIC HWY
LA
MA
R L
N
WOODCOCK RD
NISBET RD
EL
CA
MI N
O D
R
WO
OD
RID
GE
CT
BLUE-BERRY PL
WOODRIDGE DR
VA
UT
IER
RD
MADERA
SE
RE
NA
PL
S
BA
RR
RD
SH
ER
BU
RN
E R
D
N
EL D
RID
GE
RD
BA
RN
ES
RD
BARNES RD JAY
RO
BIN
SO
N R
D
POLLY PL ATTERBERRY RD
SH
ER
BU
RN
E R
D
TR
IPP
RD
PIE
RS
ON
R
DD
RY
KE
RD
CA
SS
IDY
RD
AUTUMN RD CA
SS
IDY
CR
EE
K R
D
MA
DE
RA
PL
S
EL
DR
IDG
E R
D
SPENCER RD
JO
SL
IN R
D
W RUNNION RD E RUNNION RD
SMITHFIELD DR
BE
NN
ET
TP
L
MI L
L R
D
HO
OK
ER
RD
ATTERBERRY RD
FR
OS
T R
D
E GOFORTH RDW GOFORTH RD
HO
OK
ER
RD
STELLAR
ROUPE RD
RO
UP
E R
D
ROUPE RD
BRUECKNER RD
RIV
ER
SID
E R
D
W SILBERHORN RD
LORRAINE
GRANT RD
HIGHWAY 101
GUPSTER RD
TA
YLO
R C
UT
-
OF
F R
DG
ILB
ER
T R
D
SENZ RD
WO
OD
STARRY RD
FA
RM
RD
FASOLA RD
FASO
LA R
D
MC
CO
MB
R
D ROBBINS RD
MANTLE RD
N
SC
OT
TD
R
S
SC
OT
T D
R
HU
DO
N R
D
HOUSERD
HE
AT
H R
D
GR
AN
DV
IEW
DR
GRANDVIEW DR
BU
SIN
ES
S P
AR
K L
P
ST
RE
IT R
D
COOK RD
BORN DR
WAR
D R
D OL
YM
PIC
PL
MADRONATERRACE
STONE RD
WILLIAMSON RD
WRIGHT RD
MC
CA
WL
EY
DR
E BUENA VISTA DR
N
B
OY
CE
RD
W BUENA VISTA DR
HIGHWAY 101
PARRISH RD
KIR
K R
DK
ITC
HE
N -
DIC
K R
D
SPATH RD
HE
AT
H R
D
AP
PL
EG
AT
E L
N
N P
RIE
ST
RD
W OAK CT
WR
IGH
T R
D
N
MA
RIO
TT
AV
E
W ELLIOTTCT
ON
OLD OLYMPIC HWY
RIVERVIEW DR MCCOMB RD
PE
BB
LE
WY
W
HEN
DRIC
KSON R
D
W HENDRICKSON RD
W SPRUCECT
W PALO
VERDE LP
RI V
ER
RD
VA
LL
EY
VIE
W D
R
BU
RN
T
MO
UN
TA
IN P
L
W LOMA VISTA RD
E
LO
MA
VIS
TA
RD
COMET CT
LILLY RD
EMERY RD
PHINN RD
CONNER RD
BLUE RIDGE RD
EM
ER
Y R
D
BL
UE
MO
UN
TA
IN R
D
SUNDIAL LP
CA
YS
RD
MARINE DRTHORNTON DR
MCLAUGHLIN RD
PETERSON ST
W ANDERSON RD
BAY
E ANDERSON RD
LIBBY ST
E NELSON RD
ASPEN LN
LIBBY ST
VICTORIA VIEW ST
THORN
TON
PLT
HO
RN
TO
N D
R
W NELSON RDPARK
LN
MAINS RD
N
OL
YM
PIC
VI E
W A
VE
DENT PL
CL
INE
RD
FA
RM PL
GARDEN
LN
W NELSON RD
VOIC
E OF
AMERIC
A RD
LOTZGESELL RD
JIM LO
TZ
GE
SE
LL R
D
LOTZGESELL RD
CA
YS
RD
CL
AR
K R
D
E ANDERSON RD
CL
INE
SP
IT R
D
MARINE DR
TWIN VIEW
DR
OYSTER
FRIC
KST
MC
ALM
ON
D S
T
PENINSU
LA
ST
VIEW DR
TOWNE RD
TO
WN
E R
D
TO
WN
E R
D
LO
TZ
GE
SE
LL R
D
MA
RIN
E D
R
SE
QU
IM-D
UN
GE
NE
SS
WY
EBERLE LN
CHRISTIAN LN
ME
AD
OW
-B
RO
OK
AV
E
ME
AD
OW
DR
COLLINS ST
E PALMER ST
DUNGENESS BAY BLVDMAPES ST
ABERNATHYST
WARD RD
MOUNTAIN
SE
QU
IM-D
UN
GE
NE
SS
WY
W PALMER ST
BLVD SE
A LA
WN
DR
GO
LDE
N
SA
ND
S P
L
GO
LD
EN
SA
ND
S
THR
EE C
RAB
S RD
THREE CRABS RD
TYEE RD
S OLYMPICVIEW AVE
CL
INE
RD
VIEW ST
S O
LYMPIC
VIE
W A
VE
N
MC
CR
OR
IE R
DS
M
CC
RO
RIE
RD
RD
S
MC
CR
OR
IE
GELLOR RD
BLUE M
OUNTA
IN R
D
BL
UE
MO
UN
TA
IN R
D
BL
UE
MO
UN
TA
I N R
D
S
BO
YC
E R
D
CA
RL
SB
OR
G R
D
CH
AR
LE
SW
Y
ED
NA
PL
FORESTRIDGE DR
SIMPSON RD
KIR
NE
R R
D
KIRNER RD
OLYMPIC
VISTA
KARIE CT
BRITTANY LN BRIGADOON BLVD
WOODCOCK RD
SI M
PS
ON
RD
VISTAS DR
ALDER
-
WO
OD
DR
WO
ODLAND DR
WIL
LA
RD
DR
MA
RC
HB
AN
KS
RD
EL
IZA
BE
TH
LN
W DIANE DR
KAREN CT
KELLIE CT
EAGLEPL
JA
Y R
D
OLD OLYMPIC HWY
TO
WN
E R
D
HO
US
E R
D
MAC LN
FIT
Z-
GE
RA
LD R
D
SOME DR
FA
IRW
AY
DRTAYLOR BLVD
FAIRWAY DR
TOWN RD
MCIN
NES
PL
EV
AN
S R
D
SE
QU
I M-D
UN
GE
NE
SS
W
Y
SUNLAND DR
LESLIE LN
PL
TURNAGAINPL
SOUTHWESTERN PL
OLSON RD
HO
OK
ER
RD
PIKE PL
WA
LD
O R
D
LO
CH
OW
RD S
TU
RD
EV
AN
T R
D
ST
UR
DE
VA
NT
RD
HA
TC
HE
RY
RD
KINKADE RD
TA
YL
OR
CU
T-O
FF
RD
OLSON RD
NTAIN RD
FISH
OL
SO
N R
D
SP
OR
SE
EN
RD
HAPPY VALLEY RD
MC
FA
RLA
ND
DR
MC
FA
RLA
ND
DR
BELLWAY RD
AN
NA
BE
LL
E L
N
BARBARA ST
SP
OR
SE
EN
RD
LESTER WY
HA
PP
Y V
AL
LE
Y R
D
HAPPY VALLEY RD
RIV
ER R
D
HEIGHTS DR
SE
NZ
RD
LOST MOUNTAIN RD
EGGLOFF RD
MO
UN
TA
IN R
D
FISH HATCHERY RD
FISH
HATC
HER
Y RD
EASTERLY RD
HA
PP
Y
JO
HN
SO
N C
RE
EK
RD
SOFIE RD
PALO
MA
RS
HA
LL RD
PALO ALTO RD
SC
HIN
DL
ER
RD
LEY R
D
OLD BLYN HWY
HIG
HW
AY 101
CO
RR
IEA
RD
SO
PH
US
RD
(BLYN C
ROSSIN
G)
LOUELLA
BU
GG
E RD
DAW
WHITEFEATHER WY
VALLEY
WE
ST S
EQ
UIM
BA
Y R
D
BAR
KER
RD
RD
FO
RR
ES
T R
D
SC
HM
UC
K
RD
KE
EL
ER
RD
SIM
DA
RS
RD
E BELFIELD AVE
E BLAIR AVE
LO
FG
RI N
R
D
WE
ST
WEST SEQUIM BAY RD
BE
LL
BO
TT
OM
RD
PORT WILLIAMS RD
COULTER RD
TAYLOR
MADIGAN RD
SU
NR
ISE
VIE
W A
VE
JAMESTO
WN
RD
ALLEN DR
W COONDR
E CO
ON
DRPRINCE RD W
ILC
OX
LN
WOODCOCK RD
HO
LL
AN
D R
D
HORIZON
WAY PL
LO
OP
DRT
AY
LO
R
RA
NC
H R
D
JAKE
HAL
L R
D
SER
JAMESTOWN RD
TAYLOR
CA
SS
AL
AR
Y R
D
MEDSKER RD
MEDSKER RD
ME
DS
KE
R R
D
ALD
HURRICANE
JUAN
SUNSET PL
RID
GE D
R
JO
HN
SC
OT
T R
D
GREEN
W ALDERCT
W BRACKETT RD
S
9T
H A
VE
S
SH
AW
LN
MAY RD
OTTER
WY
RIV
ER
RD
BE
AR
AC
RE
S
CR
ES
T
EAST ST
EL CAMINO DR
BRIGADOONBLVD
LIGHTHO
USE
VIEW
DR
E DIANE DR
ER
AGE
ST
PORT WILLIAMS RD
PORT WILLIAMS RD
N
BR
OW
N R
D
W DEYTONA ST
DU
KE
DR
AVELLANA RD
SECOR RD
MILLER RD
E WASHINGTON ST
S
3R
D A
VE
N
DU
NL
AP
AV
E
E HENDRICKSON RD
N
SE
QU
IM A
VE
PRA
TER
PL
HOGANS
VISTA
HARLEMANDR
AR
NO
LD
PA
LME
R
PK
WY
RIDGETOP
PL
SAN
14TH
CT
MADIGAN PL
WILLIAMS PL
E JOHNSON DR
(NORTHWESTERN PL)
KE
LSE
YC
T
(DISCOVERY BAY AVE)
(VANCOUVER PL)(CLALLAM BAY ST)
W JOHNSON DR
SU
MM
ER
SE
TC
T
S
PR
IES
T R
D
EVANS RD
HO
US
E
WOODCOCK RD
SLAB
HORIZON
DAWN
LOST MOU
SINDARS
THE HILLS LP
OS
PR
EY
HAPPY VALLEY RD
S
7T
H A
VE
FA
LCO
N
RD
S
7T
H
AV
E
S
SE
QU
IM A
VE
DR
DR17TH
CT
(11TH CT)
WASHIN
GTONHARBOR
SEQUIM
BA
Y R
D
RID
GE
LN
HUMBLESUNNY
DR
S E
VE
R-
GR
EE
N P
L
SIERRA PL
(N
E
VE
RG
RE
EN
PL
)
JAMES
RANCH RD
SUNSET
(WILLIAMS CT)
(GREENWAY DR)
S
3R
D
AV
E
N
BR
OW
N R
D
S
ST
ILL
RD
N
5T
H A
VE
VIS
TA
DE
L M
AR
DR
RD
ZA
CC
AR
DO
RD
BLYN RD
CHICKEN
WO
OD
S R
D
COOP RD
COME
WOODS RDLATELY
RD
JIMMY
SC
HM
I TH
RD
JIMMY
LATELY
RD
PALO
ALT
O
R
D
CO
ME
DO
N S
CH
MIT
H R
D
LON
E
FIR
PA
LO
ALT
O R
D
YOU
NGQ
UIST R
D
SPOTTED
HIG
HW
AY 1
01O
LD B
LYN
OL
D B
LY
N H
WY
EA
ST
SE
QU
IM B
AY
RD
DEERHAWK
HW
Y GU
ILE
S R
D
COOPBONNIE
RD
CH
ICK
EN
CH
ICK
EN
C
OO
P R
D
KN
AP
P R
D
DIA
MO
ND
PO
INT
RD
E MICHIGAN SCHOOL RD
MCBRIDE RD
W MICHIGAN SCHOOL RD
PIE
RC
E R
D
CALAMUS
THOMPSON RD
TH
OM
PS
ON
RD
RHAPSODY DR
BLUE
PL
BUCK LOOP RD
EAST SEQUIM BAY RD
BUCK
LOOP RD
PA
NO
RAM
A B
LVD
CAT LAKE RD
EAGLE CREEK RD
BEACH RD
DIA
MO
ND
PO
INT
RD
GARDINER
HIGHWAY 101
COOP
RD
MU
SS
EL
BE
AC
H R
D
SHORE
MA
DR
ON
A W
Y
INDUSTRIAL PKWY
DIAMOND POINT RD
AN
ITA
DR
CA
SCA
DE
DR
DIS
CO
VE
RY
VIE
W D
R
DIS
CO
VE
RY
S D
IAM
ON
D
BEACH DR
SPRING
NORTH ST
BARBERRY LN
HEMLOCK
MA
DR
ON
A W
Y
WO
OD
RD
SUN-
SHINE
FLE
MIN
G D
R
TI M
BE
R
RD
RE
DW
OO
D
LN
CO
NIF
ER C
T
WY PL
VIEW
WE
ST
ST
N DIAMOND
LN
SH
ER
MANZ
SA
LA
L W
Y
HU
CK
LE
BE
RR
Y
CIR
SH
OR
E
LN
WY
KAU
AER
O P
L
PO
PLA
RCT
AIRPORT WY
SUNSHINE AVE
BE
RR
Y C
IR
SA
LAL
WY
RHODODENDRON DR
AVE
MA
N D
R
F
COTT
WO
OD
LN
MA
RI
FAIR
FOUR
VIEW DR
DR
EM
ER
SPY GLASS LN
DR
BL
AC
KM
OU
TH
P
L
COHO
MA
RIN
ER
S
V
IEW
CT
ST
AG
LN
CEDAR RIDGEDR
HU
MM
ING
BIR
D L
N
WA
DS
WO
RT
H D
R
HIMLEN RD
HIM
LEN
RD
BROADVIEW DR
STA
RG
ATE WY
AL
ICE
PA
RK
LN
OLY
MP
IC
LO
ST
ME
AD
OW
LN JANSSEN FARM RD
BALMO
RALCT
LIGHT DR
MO
ON
RUTHS
SAWM
ILL RD
MA
GG
I EL
N
PL
(WINDSOR CT)
(HAMPTON CT)
RO
WL
AN
D D
R
WSYLVESTER
CT
WINTER-HAWK
ST
SPARROW-HAWK ST
CREEKCT
CR
EE
K V
I EW
DR
HAWK PRAIRIE CT
LA TOUR
RD
MARTHA LN
SH
EL
DO
N L
N
FALCONCREST CT
CO
MM
UN
ITY
LN
DANDELION WY
MORNING
STAR WY
LN
COUNTRYVIEW DR
RYAN WAYNE
PL
STEPHANIE LEE PL
KLAHHANE RD
SUNCATCHER CT
DAY LN
E GREY FOX RD (E OAK TREE
RIDGE)
N
OA
K W
OO
D D
R
N
OA
K V
IEW
PL
E FIR STW FIR ST
E WASH
N
3R
D
AV
E
W WASHINGTON STE WASHINGTON PL
S
BR
OW
N
R
D
N
SU
NN
YS
IDE
AV
E
KN
AP
MA
N A
VE
N
GO
VA
N A
VE
MA
TR
IOT
TI
AV
E
N
RY
SE
R A
VE
N
HA
LL
ER
A
VE
N
2N
D
AV
E
N
4T
H
AV
ES
4
TH
AV
E
S
2N
D
AV
E
N S
EQ
UI M
AV
E
S
SE
QU
IM A
VE E BELL ST
E HAMMOND STW HAMMOND ST
W PRAIRIE ST
W MAPLE ST
W BELL STETTA ST
E MAPLE ST
INGTON ST
S
SU
NN
YS
IDE
AV
E
E CEDAR ST
E SPRUCE ST
E ALDER ST
E WILLOW ST
E OAK ST
W SPRUCE ST
W ALDER ST
W CEDAR ST
S
3R
D
PL
WHEMLOCK ST
W PINE ST
W LEHMAN ST
S
4T
H C
T
LE
E
CH
AT
FIE
LD A
VE
S
BL
AK
E A
VE
N
BL
AK
E A
VE
W SUMMER
BREEZE LN
S
6T
H
AV
E
N
7T
H A
VE
SP
EN
CE
R
FA
RM
PL
JUN
IPE
R
MO
BIL
E
ES
TA
TE
S
S
7T
H A
VE
W PINE CT
(W GARLANDPL)
N
9T
H A
VE
CIR
HO
NE
YC
OM
B
W DESERET AVE
NK
LA
HN
PL
OXFORD
WY
W MINSTREL
RD
CAPE HOPE WY
W STRATFORD WY
PO
RT
SID
E
W
Y
N L
ITT
LE
JOH
N W
Y
N
ST
AR
BO
AR
D W
Y
S
5T
H
PL
W NORMAN ST
W EUNICE ST
W RESERVOIR RD
W MCCURDY RDE BROWNFIELD RD
W
HOLLEMANW
Y
(EMERALD HIGHLANDS WY)
OPAL
LN
TOPAZ
WY
CORAL
DR
JADE CIRAM
ET
HE
ST
WY
SA
PP
HIR
E P
L
S
RH
OD
EF
ER
N
RH
OD
EF
ER
RD
RD
CRAIG RD
HA
RD
WIC
K R
D
BLYN HOLLOW
RD
IRO
NW
OO
D D
R
JUN
I PE
R
LN
LUPINE DR
(ASTER RD)
ACCESS RD
(SHIPVIEW LN
SUN
SHIN
E P
LAZA
(CORMORANT DR)
(BLUFFLN)
SOUTH
ST
SCHOOLHOUSE
POINT LN
SU
NS
HIN
E R
D
PU
FF
IN R
OC
K R
D
HOLLAND RD
BLVD
TAYLOR C
T
(VICTORIA CT)
(ASCOT CT)
(FAWNWOOD PL)
(PROTECTION PL)
(DISCOVERY BAY CT)
(CRESTLINE DR)
JAMES ST
MEADOW
VIS
TA V
IEW
DR
LAR
K LN
EASTANDERSON
ROAD
(DANIELLE CT)
EDS
PL
(MIKELLE DR)
BR
ET
T
CIR
(ERICS WY)
(HAYDEN PL)
RACCOON RD
CE
NT
ER
P
AR
K W
Y
VA
LLE
Y
FA
RM
CT
BUDS WY
EN
CH
AN
TM
EN
T W
Y
OV
ER
LOO
K T
R
PENNY LN
FROG LN
HOSLER DR
CO
HO
RU
N C
T
N
SE
AL
ST
(N OAK TREE CIR)
N
5T
H A
VE
N BA
KE
-
HO
US
E C
T
N A
BB
EY
CT
W CROWSNEST LN
N CANTERBURY CT
W KEEL LN
NORTHWOOD LN
TONDA VISTA RD
LEMMON RD
GA
SM
AN
RD
BELBROOK LN
E SO
RREL LN
W S
ORR
EL LN
SHAMR
OCK LN SIEBERTS C
REEK RD
HID
DE
N V
IEW
DR
JOHN JACOBS RD
ERVING JACOBS RD
MIL
ETI
HE
CH LN
ON
NE
LLC
RE
EK
RD
I
AUTUMN RD
(OLYMPUS CT)
BE
VN
SE
QU
I M -
D
UN
GE
NE
SS
W
Y
TAYBERRY LN
DAHLIA LLAMA LN
E SILBERHORN RD
HEIG
HTS
DR
LO
UE
LL
A
RD
PL
RD
CO
UG
AR
CR
EST
CH
EL
DR
LN
OR
D
TR
ALTO RD
KIN
G D
R
AV
E
PE
NT
INE
NORTHVIEW LN
RIDGE
SH
UK
SA
N
LO
ST
RD
LINDA VISTA LN
LONETREE DR
LN
S
5T
H A
VE
E WILLOW ST
ONYX
LN
FERN RD
HO
BB
Y L
N
YELLOW BRICK RD
KNIGHT GLEN CT
ST
RA
ITS
OLD TOWNRD
DRCOBB CIR
OL
YM
PI C
CA
RL
SB
OR
G R
D
WILD CURRANT WY
FLIG
HT
A
LLE
Y
HIGHWAY 101
FAT CAT LN
MA
RT
I N R
D
N
KE
ND
AL
L
RD
WESTERN WAY
TURNSTONE LN
NARROW WAY
TU
RN
ST
ON
E L
N
WESTON PKW
YOS
O V
ISTA
CT
MOUNT
BAKER DR
BLA
KE
LY B
LVD
DAIRY VIEW LN
BU
G H
EIG
HT
S R
D
VO
RH
IES
WY
AT
WO
OD
R
I DG
E P
L
HAVEN
DR
HAVEN HEIGHTS DR
HEI
GH
TS
SPRING CREEK DR
HOWARD HEIGHTS RD
GR
ET
AS
P
L
HA
NU
SA
LN
VO
ICE O
FA
ME
RI C
AR
D
ALDERCREEK FLY
FLYROCK RDDR ROCK
RDHEIG
BUG
HTS RD
RU
SH
RD
TR
#
#
PA
LO
AL
TO
RD
CR
OS
BY
L
N
LA
ND
CA
ST
ER
LN
BROOKLYNN LN
ST
ON
E
FA
RM
RD
STACY CT
JERSEY LN
LN
CLEARVIEW
HA
NLE
Y W
Y
ANTLER CT
OLD LOGGING RD
(W BOWMAN
CT)
KULA LN
VILLAGE LN
Ma
trio
tti
Cre
ek
SPY GLASS LN
TA
LL
TR
EE
WA
Y
CO
LG
AN
LN
LA
VE
ND
ER
ME
AD
OW
S D
R
BELENSKI PL
JAKE WY
otherDungeness
River
McDonald Creek
Siebert Creek
Morse Creek
Matriotti Creek
Jimmy Come Lately Creek
Bell Creek
Bagley Creek
Canyon Creek
Gierin Creek
Johnson Creek
Bear Creek
Strait of Juan de FucaSmall Tributaries
Chicken Coop Creek
Dean Creek
Cassalery Creek
Sequim Bay
Small Tributaries
InnerDungeness
Bay
Outer Dungeness
Bay
MeadowbrookCreek
Figure 1.1-1. East WRIA 18 Area Map.
Chapter 1 Introduction and Planning Framework Page 1-4
ENTRIX, Inc. WRIA 18 Watershed Plan
This page intentionally left blank.
OC
EAN
CO
VE LN
SEAGULL D
R
STRIPED PEAK RD
LAWRENCE
W BACHELOR ROCK DR E BACHELOR ROCK DR
ANCHORAGE LN
EA
GLE
T
RE
E
RD
LAWRENCE RD
KING ST
CH
I NO
OK
LN
SIL
VE
R L
N
FRESHWATER PARK
GR
OU
SE
RID
GE
RD
PR
AW
N R
D
DURRWACHTER RDHART RD
HUDSON RD
OX
EN
FO
RD
RD
FRES
HW
ATER
BAY
RD
EVERETT RD
MISTY HOLLOW RD
PETERS RD
HOLLY HILL RD
SLEEPY HOLLOW LN
HIGHWAY 112 MA
PL
E R
IDG
E R
D
RAM HILL RD
GE
RB
ER
RD
DO
DG
ER
LN
EAGLE HEIGHTS RD
PE
TE
RS
RD
VE
RT
RD
FRESHW
ATER BAY RD
ST
RIP
ED
PE
AK
RD
PA
RK
FRESHWATER
S
MIL
L C
RE
EK
CT
VIEW VISTA PARK
E SUNNYBROOK MEADOWS LN
SO
UT
HJ
EN
SE
N R
DMCBLAIR LN
DR
VIEW DRHARBOR
CH
AS
EW
OO
D
ROSS LN
GANDALF RD
HA
TC
HE
RY
RD
SH
AF
FE
R R
D
RO
UN
D T
RE
E R
D
WA
P
E ENNIS
CR
EE
K R
D
LN
SN
OW
RIDGE
ST
RA
IT
DR
ST
RA
IT V
IEW
VIE
W
DR
RD
SBFOR
MILL RD
DR
S DEL
DR
KLA
EN
NIS
SE
R S
T
SS
T
EAVE
WBOATHAVEN DR
W 4TH ST
E RAILROAD AVE
E GEORGIANA ST
(S BLUE
WATER VIEW)
E 6TH
RTE
S
FA
IRM
ON
T A
VE
S
PI N
E S
TC
UT
OF
F
W 16TH ST
S NIC
HOLA
SR
D
W EVACOVE
S M
AR
IE V
IEW
ST
(S HIDDEN COVE)
(S CLIPPERCOVE)
W 5TH ST
W 6TH ST
S WOODSIDECIR
(S SAMARA DR)
W 7TH ST
W
W 4TH ST
W SAMARA DR
W 16TH ST
W 16TH ST
W 12TH ST
S M
ST
S E
VA
NS
AV
ES
M
ST
S L
S
T
S K
S
T
S I
S
T
S H
ST
S G
S
T
S F
S
T
S E
S
T
S D
ST
S C
S
T
S B
S
T
S A
S
T
S V
ALL
EY
ST
S C
ED
AR
ST
S P
INE
ST
S
CH
ER
RY
S
TS
OA
K S
T
W 14TH ST
E PARK AVE
E VASHON AVE
S
LIN
CO
L N S
T
COLUMBUSAVE
S
OA
KS
T
W
W 15TH ST
W 17TH STW 18TH STW 19TH ST
W FOUNTAIN ST
W GLENWOOD ST
W LAURIDSENBLVD
W EDGEWOOD PL
W 15TH ST E 13TH ST
E 12TH ST
E 11TH ST
E 10TH ST
E 9TH ST
S E
UC
LID
AV
E
W HAZEL ST
W MADRONA ST
W HAMILTON WY
WESTVIEW DR
S S
EA
-
MO
UN
T D
R
W 8TH ST
S
JU
MA
CT
S N
ST
S O
ST
S
PA
CIF
ICV
ISTA W DRIFTW
OOD
PL
W SEABREEZE
PL
S E
ST
ES
CT
W 14TH ST
W DIJONCT
W 14TH ST
S MCDONALD ST
N EDIZ
HO
OK RD
W HILL ST
W 4TH ST
S O
WE
N A
VE
S E
VA
NS
AV
E
W 15TH ST
W 18TH ST
S
DEL
OR
ES
PL
S R
EY
ES
ST
S B
UTL
ER S
T
W 16TH ST
W 18TH ST
S M
CD
ON
ALD
ST
S F
LOR
ES
ST
S O ST
W EDGEWOOD DR
LO
WE
R E
LW
HA
RD
CROWN Z
WATER RD
OLY
MP
IC H
OT
SP
RIN
GS
RD
GLACIER
OLY
MP
IC H
OT
SPRINGS R
D
RIVER RD
LITTLE
RD
TR
AIL
HU
RR
ICA
NE
RID
GE
RD
BE
AR
TR
AC
KS
RD
POULSEN
HERON COVE RD
LAKE SUTHERLAND RD
FIS
HE
R C
OV
E R
D
FIS
HE
R C
OV
E R
D
EAST BEACH RD
HIGHWAY 101
HIGHWAY 101
HE
RR
ICK
RD
OLD STATE RD
HE
RR
ICK
RD
OLYMPICHOT SPRINGSRD
HIGHWAY 101
HIGHWAY 101
LA
KE
AL
DW
EL L
RD
BLA
CK DIA
MO
ND R
D
LITT
LE
HEAD
E PANORAMA LN
E ELDER- BERRY LN
VISTA DR
RD
OLD
BLA
CK
DIA
MO
ND
R
D
DIA
MO
ND
HOARE RD
S
TY
LER
RD
W EDGEWOOD DR
S
EV
ER
GR
EE
N D
R
Z
RD
PALOMA LN
SAMPSONRD
ST
RA
TT
ON
RD
EL
WH
A B
LU
FF
S R
D
WHISPERING FIRS RD
LOWER ELWHA RD
LOWER ELWHA RD
CH
AR
LES
RD
SA
MP
SO
N
R
D
PL
AC
E R
D
DA
N K
ELL
Y R
D
PLACE RD
ELWHA DIKE RD
RD
POINT
RANGER RD
ED
EN
VA
LL
EY
RD
DAN KELLY RD
VALLEY R
D
EDEN VALLEY RD
SOUTH
SANDHAGEN RD
ED
EN
HIGHWAY 112
CO
LV
ILLE
RD
DAN KELLY R
D
KAR
PEN
RD
AD
AM
'S
LN
ELW
HA
RIV
ER
RD
NS
' KL
AL
LA
M
DR
HUNT RD
HU
NT
RD
GA
GN
ON
RD
CR
OW
N
N
EV
ER
-G
RE
EN
DR
WA
TE
R
SIS
SO
N R
D
DA
M
RD
WIL
DC
AT
ELWHA RIVER RD
ER
G
LA
IRD
RD
POWER PLANT RD
HIGHWAY 112
OKERMAN RD
HA
NS
EN
RD
S MILWAUKEE DR
S L
ST
W SPRUCE ST
W POLLOW RD
W EDWARDS RD
W FAIRCHILD INT. AIRPORT RD
HIGHWAY 101
MAPLETON WYW SADDLE CLUB RD
S
CR
ITC
HF
IEL
D R
D
S
CR
ITC
HF
IEL
D R
D
S
CA
YA
NU
S R
D
S TYLER RD
W JACKSON ALLEY RD
(W MEAGHER RD)
WALKABO
UT WY
TRUCK
S TUMWATERTRUCK ROUTE
GA
KIN
RD
(S OAKCREST LP)
W OAKCREST AVE
W OAK LN
W HANCOCKAVE
EBURCH
AVE
E CHURCH AVE
(S MCGILLAVE)
(S ALBERT ST)
(S EUNICE ST)
S CANYON CIR
LAKE DAW
N
LITTLE
RD
RD
AL
DE 7TH STE 8TH STS
L
IB
AVE
S HIL
L
CIR
(S CANYONEDGE DR)
(S CRAB-APPLE PL)
E HAWTHORNEPL
S
FR
AN
KL
IN L
N
S CURRIER CT
E LAMBERT LN
(S ELIZABETH PL)
S C
HR
IST
-M
AN
PL
S
VIN
E S
T
E LOPEZ AVE
E HIGHLAND AVE
S
CE
NT
ER
ST
E CRAIG
E WILLOW AVE
E LAURIDSEN BLVD
E MELODY CIR
S W
OLC
OTT
ST
S P
EN
N
ST
E WATER STW 8TH ST
W 7TH ST
W 6TH ST
W 5TH ST
W 4TH ST
W 3RD ST
W 2ND ST
E 1ST ST
E FRONT ST
E 6TH ST
E 5TH ST
E 4TH ST
E 3RD ST
E 2ND ST
ERTY
ST
N
EN
NIS
ST
E COLUMBIA ST
E CAROLINE ST
W FRONT ST
N E
NN
IS S
T
N L
IBE
RTY
ST
N J
ON
ES
ST
N C
HA
MB
ER
S S
T
N W
AS
HIN
GTO
N S
T
N R
AC
E
ST
S
GA
LA
XY
P
L
W ALDERWOOD
CIR
S C
HA
MB
ERS
ST
S
WA
SH
ING
TON
S
T
S
FR
AN
CIS
S
TS
R
AC
E
ST
S
WA
SH
ING
TO
N S
TE BRYSONAVE
E VASHON AVE
E APPLE
LN
S
M
AP
LE
ST
S
CIT
Y L
IGH
TS
P
L
S
E
UN
ICE
S
T
S
ALB
ER
T
ST
S
VIN
E S
T
S
PE
AB
OD
Y
ST
S
C S
T E
XT
S
NE
WE
LL
RD
S
UP
LA
ND
L
N
E GLENBROOKCIR
S
NY
GR
EN
PL
E BENJAMINAVE
E ECKARD
PL
S
CH
ER
RY
ST W MOTOR AVE
W DOLAN AVE
E ORCAS AVE
E ROSE ST
E THISTLE ST
S PARKKNOLL DR
S
ME
AD
OW
CI R
E DOGWOOD PL
E HILL CREST DR
E
VISTAVIEW DR
S
R
EG
EN
T S
T
E ECKARD AVE
E HOMESTEADAVE
E ECKARD AVE
S
WA
BA
SH
ST
E OLYMPUS AVE
S L
AU
RE
L S
T
S C
HA
SE
S
T
E GRANT AVE
S
OA
K S
T
OLD JOE RD
DA
VIS
ST
DOYLE RD
W FOGARTY AVE
W FOREST AVE
W COLUMBUS AVE
W PARK AVE
E LOPEZ AVE
WHIDBYE WHIDBY AVE
E SCRIBNER RD
S
M
OU
NT
E VIEWCREST AVE
HU
RR
ICA
NE
MOUNTAIN
DRTW
IN
S
LN
FIR
S
DR
MIL
E R
D
S OLD
S
HO
LL
Y S
T (S WOLFE ST)
FORS
S
AIR
PO
RT
RD
S
RE
DD
ICK
RD
HARRY BROWN RD
CA
ME
RO
N R
D
MELTON RD
W HENNESSY LN
S
FE
Y R
D W ARTHUR AVE
W HIGHWAY 101
S
MC
DO
UG
AL
AV
E
E RHODES RD
E AHLVERS RD
E SIMMONS RD
RID
GE
RD
ARACK
CREEK DR
E KEY RD
TAM
MO
UN
T P
LE
AS
AN
T R
D
DRAPER RD
MO
UN
T P
LEA
SA
NT
RD
LIT
TL
E
LOOP DR
GL
AS
S R
D
HENRY BOYD RD
MO
UN
T P
LEAS
AN
T R
D
MOUNT PLEASANT
SUMMIT RD
HA
NE
DE
ER
PA
RK
RD
DE
ER
PA
RK
RD
S BAGLEY
DE
ER
PA
RK
RD
PELIKAN RD
TOWNSHIP LINE RD
DIETZ RD
WY
S
BA
GLE
Y C
RE
EK
RD
HU
LS
E
RD
SH
OR
T R
D
LAKE FARM RD
LA
KE
F
AR
M
(GR
VIE
W D
R
N
OL
D
NE
LS
ON
R
D
S
PE
AB
OD
Y S
T
S
LA
UR
EL
ST
W 10TH ST
W
S TUM
WATE
R
W HIGHWAY 101
E LAURIDSEN BLVD
S
LIN
CO
LN ST
S
BE
AN
RD
BE
NS
ON
RD
S
OL
D M
ILL R
D
BENSON RD
BLA
CK
DIA
MO
ND
RD
RESERVOIR RD
FREDERICKSON R
D
WELLMAN RD
BLA
CK D
IAM
OND R
D
HO
AR
E R
DAL
ICE
RD
PE
EL
E R
D
ALICE RD
BASKINS
LITTLE RIVER RD
RIV
ER
RD
HURRICANE RIDGE RD
RIVER
LA
KE
DA
WN
RD
HURRICAN
E RIDGE RD
S M
OU
NT A
NG
ELES R
D
HARRINGTON RD
BAKER FARM RD
E ENNISCUTOFF RD
RD
E KE
LLER D
R
N B
OU
RC
HIE
R
ST
CREEK
TW
IN F
IRS
PL
(SLATE DR)
RD
ES
TA
TE
S
SHADE
VIE
W
E MADDOCK RD
KEMP ST
N
CA
RN
E S
T
E RYAN DR
S
PO
RT
ER
ST
MO
NR
OE
RD
E PARK AVE
E CAMPBELL AVE
E SCRIVNER RD AN
GE
LE
S
RD
E RAMONA RD
S
DO
SS
RD
S
TIL
L ER
RD
E SCRIVNER RD
MO
UN
T P
LE
AS
AN
T R
D
GARLING RD
PATTERSON RD
BILLY SMITH RD
W ARNETTE RD
E ARNETTE RD
FOUR
WINDS RD
CR
EE
K R
D
WY
NN
LN
SUMMIT VIEW PL
S
BR
OO
K A
VE
PINYON PL
E GREEN
RD
N
BA
GLE
Y
DE
ER
PA
RK
RDDR
(PROSPECT PL)
RD
HIG
HW
AY 1
01
BU
CH
AN
AN
DR
CE
DA
R P
AR
K D
R
MORSE
PE
AR
CE
RD
PE
AR
CE
MON
ROE R
D
E MELODY LN
E 1ST ST
E FRONT ST
E E
NN
IS
N B
EE
CH
S
T
N
GA
LE
S S
T
N
BA
KE
R S
T
N
MA
ST
ER
S R
D
N
LA
RC
H A
VE
N
B
RO
OK
AV
E
LE
IGH
LA
ND
AV
EMO
NR
OE
RD
NO
RT
HJ
EN
SE
N R
D
E LINDBERG RD
E LINDBERG RD
E HIGHWAY 101
S
GO
LF
CO
UR
SE
RD
S
GO
LF
CO
UR
SE
RD
E 3RD AVE
E 4TH AVE
E 5TH AVE
HA
UK
RD
MO
UN
T P
LE
AS
AN
T R
D
BROWN RD
BROWN RD
HUGHESRD
E 6TH AVE
E 7TH AVE
CREEK RD
E
HA
RB
OR
CR
ES
T
P
L
E 2ND AVE
E PIONEER RD
GU
ZZ
I
E HELM DR
E EDDY LN
S
BA
Y V
IEW
AV
E
ROY ST
GRAVEL PIT RD
SUNRISE PL
MARSDEN RD
FARRELL PL
E HIGHWAY 101
ORVIS ST
AVIS ST
N L
EE
'S
E BAY ST
N
MO
SS
ST
N
BA
Y V
IEW
AV
E
E MYRTLE ST
E WALNUT ST
MCCARVER ST
KEMP ST
TA
CO
MA
A
VE
HAUK RD
OLD RD
MC
CA
RV
ER
ST
ELWHA RD
E MAHOGANY ST
E VINUP ST
E HICKORY ST
E DEFRANG ST
E MASTERS RDTREE LN
E BAY ST
SNOW
RID
GE
LN
RIDGE
HEATHER PARK RD
ITI W
Y
SKYLINE DR
SH
AL
E R
D
FO
OT
HI L
LS
EAGLES NEST LN
MOUNT PLEASANT CREST RD
CEDAR HOLLOW DR
UP
HI L
L D
R
E HALF
BL
AC
K H
AW
K L
P
MOUNT MCDONALD RD
YELLOW ROCK LN
LN
EM
ILY
LN SHADY CREEK LN
DE
ER
PA
RK
LN
GR
AY
ST
ON
E L
N
E SNOWLINE DR
E ANGELES RIDGE RD
WHITESBROOK LN
E OLD MILL MOUNTAIN RD
E WH
ITE
CREEK
S
WID
RD
RD
S
PA
ST
OR
AL
DR
AL
DE
RW
OO
D
BIG
EL
OW
VIEW LN
WEI
LER
RD
AL
TA V
IST
A R
DE MESA
S
MO
UN
TA
IN T
ER
RA
CE
WY
AYERS LN S
TA
RA
LN
E ELLIOTT CREEK RD
ST
OR
MA
N P
L
S
CO
YO
TE
R
UN
L
N
SNUG
HARBOR LN
DIAMOND VISTA DR
MALLARD
COVE RD
YE
W
TR
EE
DR
BA
LD
EA
GLE
WY
RUSTIC LN SU
NN
Y P
OI N
T L
N
TREE LN
SHORELINE
DR
ED
IZ V
IEW
DR
MO
UN
T P
LE
AS
AN
T
ES
TA
TE
S R
D
N
TA
RA
LN
MARIAH WINDS WY
SHORE
WESTRIDGE RD
SO
UT
HR
IDG
E R
D
BLUE JAY PL
RD
LON
GFELLO
W
RD
CANYON
LN
PO
INT
RD
S
CE
DA
R
M
ILL
RD
S HEMLOCK
MAPLE
GR
OV
E RD
TH
OM
PS
ON
PO
INT
RD
DIA
MO
ND
VIE
W D
R
LN
JNELL LNBOULDER RD
(NEW BRIDGE LN)
ALD
ER
E BENT CEDARS
WY RED
CEDAR LN
S
OO
D L
N
FERNWOOD LN
CO
TT
ON
W
N A
LDE
R
BEARFIELD RD
HAVEN LN
E WOOD
WA
PAULINE RDROCKY RD
RH
OD
Y L
N
BLACKBERRY LW MISTY LNLIN
DA
LN
GUY KELLY RD
RO
LL
INN
P
AR
K D
R
S
RID
GE
BREEZY LNFORSELL DR
EAG
LE R
IDG
E R
D
DYLAN DRPRIS
AVE
DR
E KOLONELS
WY
E ACORN LN
N O
AK
RID
GE
S
OR
CH
AR
DL
N
BRIDGELN
VIE
W D
R
N O
RC
HA
RD
LNEBB TIDE LN
EAGLE HEIGHTS RD
HO
ME
ST
EA
D
N
RID
GE
MO
RS
ELN
E HIDDEN WY
OLYMPIC
LN
N
WH
ITN
EY
WY
SPONBERGISLAND VIEW
RD
SEA
SA
ND
S R
D
VIS
TA
LN
VIEW DR
BLUFF VIEW DR
ED
GE
WO
OD
LN
TAC-DALE DR
CE
DA
R G
RO
VE
LN
WALKER RANCH RD
COUGAR RIDGE RD
ES
TA
TE
S W
Y
KACEE WY
LONE PINE RDCAGEY RD
LORILEE LN
CHRISTMAS TREE LN
OL
D
RA
VE
NS
WY
RICKARLA CIR
THREE SISTERS WY
S B
REA
KER
POIN
T PL
HIGH CEDAR LN
N B
RE
AKER
PO
INT P
LJIM AND I CT
A
NG
EL
ES
PO
INT
RD
S PO
INT R
D
KWITSEN DR
HU
PT
LN
N P
OIN
T R
D
FU
LL
MO
ON
TR
KWEYNESEN RDSNOWCAPS LN
FOX
LA
RR
YB
EN
NE
TT
AV
E
SEA WIND DR
STORMYWINDY LN
SAMULMER LN
RD
SUNSET HEIGHTS DR
MILLER
CREEK RD
EC
LIP
SE
EC
LIP
SE
IN
DU
ST
RIA
L
P
KW
Y
LNFOXGLOVE
CHICKAREE LNWINDDANCER LN
FIELDS DRW
EST DR
KLAHANIE VIEW LN
W LEO LN
LA
W COURTNEY RD
W DEVANNY LN
SE
AM
IT R
D
ASHLEY LN
W SPARROW LN
S
OL
D T
IME
PL
W BALDY VIEW DR
W JAKES RD
S
HE
DIN
RD
CO
UG
AR
LN
DR
AP
ER
VA
LL
EY
RD
ELK RUN TR
ALPINE RD
ASH ST
VE
RN
S L
N
WINTERHAVEN DR
BAYVIEW PARK LN
KRUSE RD
HOME RD
BROOK DR
RIP
PLE
COLUMBINE
BIR
DS
ON
G L
N
DEER MEADOWS DR
MERRILL
HURR ICA
BEAR MEADOW RD
FAWN HAVEN RD
LO
CK
ER
BIE
PL
STANLEY WY
VALHALLAS DR
DEER RUN
BAGLEY BLUFF TR
HARVEL LN
FERNE MEADOWS LN
SKY VIEW DR
EA
SY
ST
LISEL LN
E OCEAN BREEZE LN
WISHBONE LN
BREAK VIEW RD
BE
AR
PA
W L
N
N
HE
ML
OC
K L
N
N M
AP
LE L
N
LN
(WILLOW LN)
BOARDWALK ST TERRY MILLS RD
ROSEWOOD LN
S
MA
PL
E
LN
LO
WE
R
JAMES PAGE RD
NEW HAVEN LN
LITTLE POND RD
ONELLA RD
POINTE RD
CR
EE
K R
D
E CROFT ST
N
AL
LEY
RD
COPPERTOP TR
GL
AS
S R
D
E NANCY
LN
S MILWAUKEE DR
(S SAMARA PL)
W 19T
H S
T
W 13TH STW 14TH ST
W 16TH ST
W 18TH ST
S W
ESTV
IEW
DR
S GUND LN
W PARKVIEW LN
S H
ST
S
SH
IRLE
Y
C
T
W LAURIDSEN BLVD
W 11TH ST W 8TH ST
S N
S
T
(S SEAVIEW CIR)
W RAILROAD AVE
(E VICTORIA ST)
MARINE DR
W MARINE DR
E PORT ANGELES
PLAZA
E LAURIDSEN BLVD
W LAURIDSEN BLVD
(S COLUMBUS AVE)
S
LI N
DB
ER
G R
D
W AHLVERS RD
E
LN
DR
WALL ST
ALDER
VIEW
RIDGE
S T
UM
WA
TE
R S
T
SR 117
SR 117
N
L IL
AC
AV
E
RD
DE
ER
PA
RK
OLD
JOYCE ACCESS RD
Lak
e A
ldw
ell
LakeAldwell
Lake Sutherland
Lake Mills
Port Angeles Harbor
Freshwater Bay
R 8
WR
7 W
T 31T 30
T 30T 29
R 8
WR
7 W
R 7
WR
6 W
R 6
WR
5 W
R 6
WR
5 W
T 31T 30
R 7
WR
6 W
PRINCESS LN
LEDA LN
EL
WH
A R
IM T
R
MIMWHEETEN WAY
ST
RA
ITLA
ND
RD
SCHULTZ DR
HE
NR
Y BOY
D R
D
HEIGHTS LN
MT
PL
EA
SA
NT
MALETTI HILL RD
HE
IGH
TS
RD
HARBOR
STORM KING RD KARPEN RD
RD
(Lower Elwha
Klallam Tribe)
(Lower Elwha Klallam Tribe)
(Lower ElwhaKlallam Tribe)
Strait Of Juan De Fuca
Port Angeles
Fro
g C
reekM
o rse
Cre
ek
Bag
ley
Cre
ek
Cre
ek
Bag
ley
Lees
East Fork
Creek
Mor
se
Morse
Cre
ek
Cre
ek
Creek
Whi
te
Enn
is C
reek
Surveyor Creek
Cre
ek
Little River
En n
is C
reek
Lees
Creek
Fork
Bag
ley
Lee
s C
reek
East
Cre
ek
Creek
Ennis
LeesCreek
Whi
te
Cre
ek
Pea
body
Tum
wat
er
Val
ley
Val
ley
Cre
ek
Cre
ek
Dry
Creek
Dry
Cre
ek
Riv
er
Elwha
Cre
ek
Cov
ille
Coville C
reek
Elwha
River
East
Cre
ek
Tum
wat
er
Val
ley
Cre
ek
South Branch
Little River
Cre
ek
Creek
Rocky Creek
Mor
se C
reek
Mor
seC
reek
Lake Creek
Creek
Coville Creek
Elw
ha R
iver
Little River
Indian Creek
Indian Creek
Mor
se C
reek
Cre
ek
Min
ing
Creek
Lake
Surv
eyor
Salt
Salt Creek
Hughes
FreemanCreek
Creek
Madison Creek
Stukey Creek
Griff Creek
Cowen Creek
HughesCreek
Enn
is C
reek
Riv
er
LakeAngeles
LakeDawn
Bra
nch
Sout
hL
i ttl
e
Strait of Juan De Fuca21 22 23
262725
27 26
34 35 3623431
3533321
36
3 2 1 6 5 4 3 2 1
6
1011 12 7 8 9 10 11 12 7 8
79 12 8
91011 11
1514 13 18 17 16 15 14 18 1713 16 15 14
13 18 17 16
22 23 24 19 20 21 22 23 19 2024 21 22 2324 19 20 21
27 26 25 30 29 28 27 30 2926 25 28 27 26 2530 29 28
34 35 3631 32 33 34 3135 3236 33 34
35 36 31 32 33
3 2 16 5 4 3 2 1 6 5 4 3 2 1 6 5 4
11 127 8 9 10 711 812 9 10 11 12 7 8 9
14 1318 17 16 15 14 1813 17 16 15 14 13 18 17 16
23 24 19 20 21 22 23 24 19 20 21 22
JOHN MIKE RD
LOUISA LN RANGER RD
WILD ORCHID LN
PH
ILLIP
S P
KW
Y
RIF
E R
D
GLEN LN
(SPORTSMAN RD)
CRITTER CROSSINGCOZY COVE WY
E WABASH
ST
GRANITE RD
S
DR
Y C
RE
EK
RD
BENSON CREST DR
5
NELLIE LN
(S AVIATION PL)
(W DUVAL PL)
W EDGEWOOD DR
W INDUSTRIAL BLVD
RU
NA
MU
CK
LN
Elwha River
Morse Creek
Little River
Indian Creek
Ennis Creek
Dry Creek
Lees Creek
Tumwater Creek
Valley Creek
Peabody Creek
Bagley Creek
Port Angeles AreaSmall Tributaries
White Creek
Elwha River
Figure 1.1-2. West WRIA 18 Area Map.
Chapter 1 Introduction and Planning Framework Page 1-6
ENTRIX, Inc. WRIA 18 Watershed Plan
This page intentionally left blank.
Chapter 1 Introduction and Planning Framework Page 1-7
ENTRIX, Inc. WRIA 18 Watershed Plan
inventories and plans on key issues of local importance, assess water resources and needs, and recommend management strategies. Planning generally must be complete within four years after expenditures of Phase 2 grant funds.
Approval of a watershed plan requires, at a minimum, the unanimous agreement of the local, State and tribal governmental members and a majority vote of non-governmental members of a Planning Unit. If approved, the Plan is submitted to the county governments with territory in the WRIA,for ratification by majority vote of each elected governing body in joint session.
The Watershed Management Act directs Planning Units to review planning, projects, and activities already completed or underway regarding natural resource management or enhancement in the area and incorporate their products as appropriate so as not to duplicate work already performed or underway. Section 1.2 reviews the history of watershed planning in WRIA 18. Section 1.3 summarizes local, state, regional and federal laws and regulations, together with actions taken under them which affect watershed planning, salmon recovery, or water supply.
1.1.2 Watershed Plan Limitations
The WMA also imposes certain restrictions on what a watershed plan may do. Among them, watershed plans may not conflict with law or tribal treaty rights, impair or diminish a water right, or affect or interfere with water rights adjudication. Watershed plans may not modify habitat restoration or enhancement projects under the Salmon Recovery Act (SRA). Plans may recommend changes in state, regional, or local regulations, policies or plans, but may not themselves change existing local ordinances or State rules. Entities that participate in the planning process and agree to be obligated by a watershed plan are bound by it. Where Planning Unit participants, including federal agencies participating in advisory capacities, agree to be obligated by a watershed plan and take appropriate action in accordance with plan provisions, existing law or regulation may be changed.
1.1.3 Expanded Planning Funds
Under legislation enacted in 2001, Planning Units became eligible for additional funding to finance further Phase 2 assessment activities in the areas of instream flows, water quality, and detailed assessments of water storage. WRIA 18 initiating governments received additional funding in all three categories.
1.1.4 Watershed Plan Implementation
Watershed management will require a substantial public investment to accomplish the goals established in State law. Ecology received funding in 2001 to convene a broadly representative panel on watershed plan implementation. The panel was charged with developing recommendations on implementing watershed plans, including how to pay for implementation. A final report of findings and recommendations was delivered to the legislature for the 2003 session, and an implementation funding program has been established.
Chapter 1 Introduction and Planning Framework Page 1-8
ENTRIX, Inc. WRIA 18 Watershed Plan
1.2 WATERSHED PLANNING PROCESS AND HISTORY IN WRIA 18
1.2.1 Initiating Governments
The Initiating Governments (IGs) for WRIA 18 include Clallam County, the City of Port Angeles, Agnew Irrigation District, the Jamestown S’Klallam Tribe (JSKT), and the Elwha Klallam Tribe (EKT). The Initiating Governments signed an Intergovernmental Agreement dated December 9, 1998, to form an Elwha-Dungeness Coordinating Council, apply for and accept grants for watershed planning, and provide administrative support to the watershed planning process (Appendix 1-D).
Scope of Planning
The WRIA 18 Initiating Governments have elected to complete both the mandatory water quantity element of watershed planning, and all three discretionary elements, water quality, habitat and instream flow.
The WRIA 18 Watershed Plan provides recommendations for the management of watershed resources throughout WRIA 18. Areas falling within the jurisdiction of WRIA 18 initiating governments and Planning Unit participants include unincorporated Clallam County, the cities of Port Angeles and Sequim, and tribal lands of the Elwha Klallam and Jamestown S’Klallam. The Intergovernmental Agreement divides WRIA18 into two geographic planning areas:
• “Dungeness Planning Area” – extending from the eastern boundary of WRIA 18, encompassing the Dungeness River Basin to, and including, the Bagley Creek watershed (Figure 1.1-1).
• “Elwha-Morse Planning Area” – extending from Bagley Creek and including the Morse Creek watershed in the east to the western boundary of WRIA 18, encompassing the Elwha River Basin (Figure 1.1-2).
These two areas have come to be called “East WRIA 18” and “West WRIA 18”, respectively. The designation of two Planning Units recognizes a history of focused planning in the eastern and western watershed areas of Clallam County over several decades.
Under a Memorandum of Agreement between the WRIA 17 Planning Unit and WRIA 18 Initiating Governments dated December 10, 2001, the westernmost portions of WRIA 17 (which fall within Clallam County) have been included in the WRIA 18 Watershed Plan. These include Sequim Bay and the several drainages that feed it: Johnson Creek, Dean Creek, Jimmycomelately (JCL) Creek, and Chicken Coop Creek. This arrangement recognizes a history of planning responsibility for these drainages (Box 1).
Chapter 1 Introduction and Planning Framework Page 1-9
ENTRIX, Inc. WRIA 18 Watershed Plan
Box 1: History of Planning Responsibility for Sequim Bay and Associated Drainages
Clallam County and JSKT, both of which are WRIA 18 initiating governments, have been heavily involved in developing and implementing watershed plans and restoration activities in this area for many years. The JSKT and Clallam Conservation District (CCD) are leading the current reconstruction and restoration of JCL Creek and its estuary. The eastern boundary of Sequim Bay is also within the North Olympic Peninsula Lead Entity’s salmon recovery planning territory. Clallam County has established a Clean Water District for shellfish protection and other purposes, with boundaries that include the Sequim Bay watershed. The Tribe and County are involved in recovery planning for ESA-listed fish in JCL Creek, particularly chum. A hydrologic connection exists between the Dungeness River and Johnson Creek/Sequim Bay via the Highland Irrigation System. The JSKT has the only reservation lands in WRIA 17 and has requested that these areas be incorporated into WRIA 18 watershed planning.
Delineation of Planning Units
The WRIA 18 Initiating Governments designated the Dungeness River Management Team (DRMT) and the Elwha-Morse Management Team (EMMT) to comprise the Planning Units for East WRIA 18 and West WRIA 18, respectively. Figure 1.2-1 outlines the general relationship among the Initiating Governments, Planning Units, and the governments, advisory agencies, and other stakeholders in WRIA 18.
Dungeness River Management Team (DRMT)
The DRMT has long played an integrative role in watershed management and salmon recovery in East WRIA 18. The original DRMT was active from 1988-1991 in preparing the Dungeness River Area Watershed Management Plan (Dungeness River Management Committee [DRMC] and Clallam County Department of Community Development 1993) and Dungeness River Comprehensive Flood Control Management Plan (Kramer, Chin & Mayo, Inc. [KCM] 1990). Other planning processes addressed Sequim Bay watershed management and later, Sequim-Dungeness groundwater protection. These culminated in the Dungeness-Quilcene Water Resources Management planning process (Dungeness-Quilcene Water Resources Management Plan prepared by the JSKT, Coordinating Entity for the Regional Planning Group; hereafter referenced as the DQ Plan 1994). The DRMT was suspended during development of the DQ Plan, from 1991-1994. All of these are reviewed below.
The DRMT was reactivated in May 1995 by Clallam County Commissioners Resolution No. 104 (1995) and Jamestown S’Klallam Tribe Resolution No. 44-95. The DQ Plan had recommended that a watershed council be formed to provide more coordinated and
Chapter 1 Introduction and Planning Framework Page 1-10
ENTRIX, Inc. WRIA 18 Watershed Plan
integrated natural resources planning for the Dungeness River watershed. A summary of DRMT watershed plans and activities since 1989 is attached as Appendix 1-D.
The current DRMT links and integrates tribal, federal, State and local government with local citizen and interest representatives, including representatives of:
Riverside property owners Clallam County City of Sequim Jamestown S’Klallam Tribe (JSKT) Sequim-Dungeness Valley Agricultural Water Users Association (WUA) Washington Department of Ecology (Ecology) Washington Department of Fish and Wildlife (WDFW) United States Forest Service (USFS) (advisory) Protect the Peninsula’s Future (PPF) North Olympic Land Trust DQ planning process (DQ) Sports fishers Clallam Conservation District (CCD) (advisory) Puget Sound Action Team (PSAT)
The DRMT periodically advertises for members. Public comment is welcomed at all meetings.
Elwha-Morse Management Team (EMMT)
The Elwha-Morse Management Team (EMMT) was formed to serve as the West WRIA 18 counterpart to DRMT in the watershed planning process. Established under the Intergovernmental Agreement in December 1998, EMMT held initial public outreach in April-May 1999. A Facilitator’s Report for EMMT was published in June 1999 and the Planning Unit held its initial meeting that summer.
EMMT contains governments, tribes and citizen interests, including representatives of these governments and caucuses:
West WRIA 18 property owners Clallam County City of Port Angeles Lower Elwha Klallam Tribe (LEKT) Washington Department of Ecology West WRIA 18 water purveyors Commercial and economic development caucus Education caucus Environment caucus Recreation caucus Sport fishing caucus
Several other caucuses were represented early in the EMMT process (civics, forestry, industry), however representatives from these interests did not participate throughout the planning process.
AdvisoryOlympia National Park
GovernmentsClallam Country - City of Port Angeles
Lower Elwha Tribe - Ecology
EMMTWRIA 18 WEST
Watershed Planning
GovernmentsClallam County - City of Sequim
Jamestown Tribe - DRAWUAEcology - WDFW
DRMTWRIA 18 EAST
Watershed Planning
Figure 1.2-1. WRIA 18 Watershed Planning Unit Organizational Chart.
Angew Irrigation District
Initiating GovernmentsClallam County - City of Port Angeles
Lower Elwha - Jamestown S’Kallam Tribes
Other StakeholdersWater Purveyors - Economic Development - Industry Private Landowners - Recreation Education - Sport Fishers - Environment
Advisory US Forest Service - PSATClallam Conservation District
Other StakeholdersProperty Owners - DQ Planning Sport Fishers - Environment Land Trust - PPF
Chapter 1 Introduction and Planning Framework Page 1-12
ENTRIX, Inc. WRIA 18 Watershed Plan
This page intentionally left blank.
Chapter 1 Introduction and Planning Framework Page 1-13
ENTRIX, Inc. WRIA 18 Watershed Plan
Integration of Planning Units with Other Watershed and Salmon Efforts
Table 1.2-1 illustrates the integration of members of the Planning Units with other natural resource management and salmon recovery efforts underway in WRIA 18, including:
North Olympic Peninsula Lead Entity (NOPLE) Comprehensive Irrigation District Management Plan Technical Advisory Committee (CIDMP TAC) Marine Resources Committee (MRC) Clean Water Work Group (CWWG) Elwha River Restoration Work Group (ERRWG) Dungeness River Restoration Work Group (DRRWG) Clallam Conservation District (CCD)
Phase 3 Grant Agreement
The Initiating Governments and Ecology signed a Grant Agreement setting forth objectives for the WRIA 18 Watershed Plan (Box 2). The “head start” given the DRMT through the Dungeness-Quilcene Water Resource Management Plan (see below) is recognized in the Grant Agreement. The Grant Agreement does not address West WRIA 18 in the same detail as East WRIA 18, but recommends a general planning process.
1.2.2 History of Watershed Planning in East WRIA 18
The Dungeness watershed has a long-established tradition of collaborative water resource and watershed planning. The areas covered under plans for the Dungeness have varied; current boundaries of the “Dungeness watershed” are considered to include Sequim Bay and its tributaries (partially in WRIA 17), the Dungeness River and its tributaries, and small independent drainages as far west as Bagley Creek. For a broad, general introduction to the literature concerning the Dungeness River Basin, see Clark and Clark (1996), whose extensive annotated bibliography includes many agency reports produced at local, state, and federal levels. (Chapter 2 includes a full bibliography of source material.)
Sequim Bay Watershed Management Plan (1989, revised 1991)
The Sequim Bay Watershed Management Plan was developed in 1989 (revised in 1991) by a committee of local citizens (Sequim Bay Watershed Management Committee [SBWMC]) appointed by the Clallam County Board of Commissioners to carry out planning under an “early action” shellfish protection grant from Ecology. It framed water quality as a quality of life issue and was based on these shared concerns and values, as stated in the Plan:
• Recognize the importance of water quality and shellfish, not only for their economic and resource values but also for their irreplaceable contribution to quality of life.
Chapter 1 Introduction and Planning Framework Page 1-14
ENTRIX, Inc. WRIA 18 Watershed Plan
• Articulate the desire to proactively protect these values.
• Address increased threats to public health and wildlife, and the prospect of shellfish closures.
• Stimulate widespread community support for stewardship and water quality protection.
The Sequim Bay Watershed Management Plan (SBWMC 1989) was developed through a collaborative, diverse, citizen-based, and consensus-driven process that set the stage for years to come in East WRIA 18 watershed planning, leading to the DQ Plan in 1994, the formation of DRMT, and this Watershed Plan. It anticipates not only many of the issues that continue to require attention today in East WRIA 18, but also the priorities and approaches to watershed planning and management that have become widely used standards in attempts to protect watersheds, deal with nonpoint pollution sources, restore habitats, and recover fish populations.
The Sequim Bay Watershed Management Plan (SBWMC 1989) built on the Sequim Bay Watershed report issued the previous year (1988) by the Puget Sound Cooperative River Basin Team (PSCRBT), funded under a technical assistance program in cooperation with the United States Department of Agriculture (USDA), Soil Conservation Service (SCS), and the State’s Puget Sound Water Quality Plan. The PSCRBT characterized the watershed, beneficial uses (fisheries, recreation and irrigation), nonpoint sources of pollution (categorized as rural/agricultural, forestry, urban, and other), and stream corridors in the watershed (Jimmycomelately, Johnson, Bell, Dean and Chicken Coop Creeks).
Water quality in the watershed at the time of the Sequim Bay Watershed Management Plan was reported to be generally good (rated by the State as Class AA). The Management Plan focused on nonpoint sources of pollution stemming from animal wastes directly entering waterways, lack of adequate riparian buffers, failing or poorly maintained septic systems, marine and land misuse, poor water conservation, and improper use of or disposal of hazardous products. Among the resources identified as threatened by these sources were recreational and commercial shellfish beds, fisheries, property values, tourism, and both surface and groundwater, including potable drinking water supplies.
Part 1 of the Plan describes why and how it was developed. Part 2 characterizes the watershed and lists threats to water quality. This part includes a discussion of environmental values and beneficial uses (these include high water quality, recreation and aesthetics, shellfish, fisheries, wildlife, stock watering and irrigation, and wetlands). Part 3 identifies four priority policy goals and lists necessary actions to protect water quality (specific source control programs are recommended for both agricultural and forest practices, onsite sewage disposal, and development and urban runoff). The four priority policy goals are:
• Priority 1: Education—Increase widespread public education and involvement, to foster a sense of stewardship among all residents of the watershed.
Table 1.2-1. Integration among Members of Watershed Planning Units and Other Natural Resource Management and Salmon RecoveryEfforts in WRIA 18.
Entities
EM
MT
DR
MT
IG
NO
PL
E
TR
G
MR
C
CW
WG
CID
MP
TA
C
DR
RW
G
ER
RW
GClallam County x x x x x x x x x
Clallam Conservation District xCity of Port Angeles x x xCity of Sequim x x xLower Elwha Klallam Tribe x x x x x xJamestown S'Klallam Tribe x x x x x x x xSDVA Water Users Association x x xWA Department of Agriculture xWA Department of Ecology x x x x x x x xWA Department of Fish & Wildlife x x x x x xPuget Sound Action Team x x x xUSDA Forest Service x x xUSDI Olympic National Park x xUSDI Fish & Wildlife Service xUSDI National Marine Fisheries Service xUS Environmental Protection Agency xNorth Olympic Salmon Coalition x xIndustry Representative x xLocal Citizens x x x x x
LegendCWWG Sequim-Dungeness Clean Water District Work GroupCIDMP TAC Comprehensive Irrigation District Management Plan Technical Advisory CommitteeDRMT Dungeness River Management TeamDRRWG Dungeness River Restoration Work GroupEMMT Elwha Morse Management TeamERRWG Elwha River Restoration Work GroupIG Initiating Governments for WRIA 18 2514 Watershed PlanningNOPLE North Olympic Peninsula Lead Entity GroupMRC Clallam County Marine Resources CommitteeTRG NOPLE Technical Review Group
Note: DRMT and EMMT also function as 2496 Citizen Facilitation Group
xxx
xx
x
x
x
x
Chapter 1 Introduction and Planning Framework Page 1-16
ENTRIX, Inc. WRIA 18 Watershed Plan
This page intentionally left blank.
Chapter 1 Introduction and Planning Framework Page 1-17
ENTRIX, Inc. WRIA 18 Watershed Plan
Box 2: Grant Agreement Objectives for WRIA 18 Watershed Plan Entire WRIA 18 (Phase 2 Completion) • Estimate surface water present in the management area. • Estimate surface and ground water available in the management area, taking into account seasonal
and other variations. • Estimate water in the management area represented by claims in the water rights claims registry,
federally reserved rights, and any other rights to water. • Estimate surface and ground water actually being used in the management area. • Estimate water needed in the future for use in the management area. • Identify areas where aquifers are known to recharge surface water bodies and areas known to provide
recharge of aquifers from the surface. • Estimate surface and ground water available for further appropriation, taking into account minimum
instream flows adopted by rule or to be adopted for streams in the management area. • Develop a detailed scope of work for watershed planning. • Identify and seek funding for projects to address gaps in information crucial to a thorough watershed
assessment and effective watershed management plan. • Identify and seek funding for immediate action projects for water conservation, water quality, habitat
restoration, or other appropriate activities identified by the planning unit. East WRIA 18 (DRMT) • Explore funding and approach for a Dungeness subregional groundwater model. • Synthesize East WRIA 18 existing information and data. • Address critical issues (surface water under influence of groundwater, salmon recovery, water
conservation and establishment of instream flows). • Update the DQ Plan. • Conduct detailed review of regional and watershed recommendations. • Summarize changes to DQ Plan recommendations. • Identify tasks implemented since the DQ Plan and major issues needing further analysis. • Revisit issues listed as unresolved in the DQ Plan. • Describe problems which have surfaced since the DQ Plan • Recommend a strategy for integrating salmon recovery with water quantity and quality
recommendations. • Review instream flow study (Instream Flow Incremental Method (IFIM)) results and the Limiting
Factors Analysis done by the Washington Conservation Commission. • Review options to establish minimum instream flows via rule-making or the Endangered Species Act • Recommend a pathway to establish instream flows. • Complete water management strategies for salmon recover West WRIA 18 (EMMT) • Address conflicting instream and out-of-stream uses of the Elwha River, with and without removal of
one or both dams, such as impacts to salmon from withdrawals during summer low-flow periods and options for managing water supply.
• Address the need for interim instream flow recommendations on the Elwha, given the likelihood of dam removal and the need to repeat the work.
• Address high- and low-flow management issues in Morse Creek and other drainages within the planning area.
• Integrate the 2514 process with other local, State, and federal watershed and salmon recovery processes, to recommend a pathway to establish instream flows
• Investigate alternative strategies of water management.
Chapter 1 Introduction and Planning Framework Page 1-18
ENTRIX, Inc. WRIA 18 Watershed Plan
• Priority 2: Keep Things Out of the Water—Eliminate contaminants from polluting the water, including (1) bacteria; (2) sediment; (3) toxins, chemicals, and plastics; and (4) nutrients.
• Priority 3: Habitat and Diversity—Protect and enhance the habitat and biological diversity in the watershed including fisheries, wildlife, and vegetation.
• Priority 4: Implementation—Implement this plan through long-term (1) coordination; (2) funding; (3) ongoing monitoring; and (4) evaluation and adaptation as necessary to ensure protection of water quality resources in the watershed.
Part 4 of the Plan details an implementation strategy, envisioning a coordinated effort among state agencies, local government, irrigation districts, water purveyors, and the JSKT. At the heart of the strategy lies a comprehensive monitoring and implementation plan adopted by Clallam County as lead agency, including the establishment of a Water Quality Division with the Department of Community Development.
Dungeness River Comprehensive Flood Control Management Plan (1990, revision underway)
The Dungeness River Comprehensive Flood Control Management Plan was completed by KCM, a consulting team in 1990 under funding from Washington’s Flood Control Assistance Account Program (FCAAP) administered by Ecology. The Plan was developed under the direction of the first Dungeness River Management Team, which set long-term goals and objectives for flood hazard planning.
The 1990 Flood Plan focused on the 100-year floodplain of the lower Dungeness River both because of its tendency to flood and because federal agencies have management responsibility for the upper basin. It provided general and conceptual guidance and addressed chronic problems and specific problem areas attributed to aggradation, erosion, excursion (forming of new channels), log jams, and steep slopes. Recommendations for flood management and control included nonstructural solutions (e.g., public education, planning, or regulations) and structural measures (e.g., bank stabilization, dikes, channelization, levees, gravel bar scalping, placing instream boulders, and reestablishing riparian vegetation). Locations of some problem sites included:
Burlingame Bridge approach Railroad Bridge approach and downstream Upstream of Highway 101 Bridge Dungeness Meadows and upstream irrigation diversions Ward Road (near bridge) Cut bank upstream of School House Road Bridge Corps of Engineers levee
Most of the problem areas and specific recommendations of this plan have been implemented, and Clallam County has received a new FCAAP grant from Ecology to update the Flood Plan and integrate flood management with habitat restoration
Chapter 1 Introduction and Planning Framework Page 1-19
ENTRIX, Inc. WRIA 18 Watershed Plan
underway on the Dungeness (Clallam County RFP for Dungeness River Flood Plan Amendment, August 2002; also see Section 2.8.3).
Aquatic Resource Assessment of the Dungeness River System (1992 and 1994)
In support of the DQ process, Orsborn and Ralph (1992) reviewed Dungeness River-related literature, providing a matrix showing whether the citation addresses basins, streams, fish, hydrology, hydraulics, and habitat. For each citation, the authors review content, applications, related fisheries topics for which the source may be of use, completeness, and information needed. The report recommended further study of stream flows, channel geometry, and a fish habitat assessment. Additional recommendations addressed regional water supply, storage, conservation, flood management, sewage and waste water, and land use. A second report, in 1994, provided the recommended physical channel analysis, hydrology and hydraulics, and fish habitat survey. This report goes beyond the 1990 Flood Plan to provide:
Analysis of the river channel and its historical changes Bridge influences Gravel traps and riprapping Land use impacts Hydrologic influences Spawning habitat characteristics Stream temperatures Fish habitat Potential habitat and channel stabilization projects Solutions to passage problems Monitoring guidelines
The 1994 report includes recommendations on linking habitat surveys with salmon life history; rearing and spawning habitat; upstream migration and adult holding habitat; habitat modifications; stream management; stabilization and habitat improvement projects.
Dungeness River Area Watershed Management Plan (1993)
The Dungeness River Area Watershed Management Plan (Dungeness Area Plan) (DRMC and CCDCD 1993) was prepared to identify water quality problems affecting beneficial uses. It established a framework for maintaining and improving water quality in eastern Clallam County. Continuing the direction begun in the Sequim Bay Watershed Management Plan, it was developed over a two-year period (1991-1993) by the Dungeness Watershed Management Committee through a collaborative, diverse, citizen-based, and consensus-driven process. The Puget Sound Cooperative River Basin Team (PSCRBT) provided technical support, studying the watershed to provide a detailed watershed characterization.
A predecessor to the Port Angeles Regional Watershed Plan (Clallam County Planning Division et al. 1994) described below, the Dungeness River Area Watershed Plan (DWMC and CCDCD 1993) summarized watershed resources, beneficial uses and nonpoint sources of pollution. It presented recommendations for five major goals
Chapter 1 Introduction and Planning Framework Page 1-20
ENTRIX, Inc. WRIA 18 Watershed Plan
(develop a community stewardship ethic; maintain and improve water quality; improve knowledge and understanding; encourage interagency cooperation; and fully implement the Plan). The Plan found indications that nonpoint sources threatened future water use for recreation, wildlife, finfish and shellfish, and domestic water supply. The Plan highlighted issues and needs for study in salmonid stock status, habitat degradation, low flows, and groundwater. The Dungeness River Area Watershed Plan also pointed toward a need for coordinated, collaborative action.
Sequim-Dungeness Groundwater Protection Strategy (1994)
The Sequim-Dungeness Groundwater Protection Strategy (Sequim-Dungeness Groundwater Committee and the CCDCD 1994) was prepared over a three-year period by a committee made up of citizens and agency staff, coordinated by the Clallam County Water Quality Program. The Committee’s tasks included education, groundwater monitoring, threat identification and other research, and development of a plan to protect groundwater resources in eastern Clallam County. An approximately 82-square-mile area was addressed, bounded roughly by Siebert Creek to the west, Sequim Bay to the east, the Strait of Juan de Fuca and Dungeness Bay to the north, and to the south by a line from approximately King Hill to Sequim Bay State Park. The Committee’s goal was “to protect groundwater quality and quantity for present and future inhabitants.”
The Sequim-Dungeness Groundwater Protection Strategy included a description of the physical setting, findings, and recommendations. The study area corresponded generally to East WRIA 18 boundaries, including all of Clallam County east of Bagley Creek. The Strategy notes that aquifers in this area provide most of the drinking water as well as fish and wildlife benefits. It cites water level declines in public and private drinking water wells over a two-year period, and a precedent-setting case in which a building permit had to be conditioned because a nitrate test did not meet potable standards.
Due to coarse soils in the central Sequim-Dungeness “prairie,” underlying aquifers are susceptible to contamination from activities at the land surface. The Strategy builds on key studies of groundwater resources and effects upon them of changes in land use, conducted during the 1980s by the United States Geological Survey (USGS) (Drost 1983, 1986). It responded to concerns regarding the effects of irrigation diversions on the original hydrology of the area and nitrate levels in wells.
Recommendations of the Groundwater Protection Strategy are organized by issue, and address nitrates, pesticides, stormwater, underground storage tanks, seawater intrusion, well construction and abandonment, water supply permitting, information management, public involvement, and funding. Significant recommendations include:
• Establishing “areas of special concern” where nitrate concentrations are documented to exceed 3 ppm.
• Initiating inspection programs for on-site sewage disposal systems and water well construction.
Chapter 1 Introduction and Planning Framework Page 1-21
ENTRIX, Inc. WRIA 18 Watershed Plan
• Encouraging Best Management Practices (BMPs) for agriculture and landscaping.
• Studying the hydrogeology of the area to determine patterns of groundwater flow and availability.
• Establishing a central data repository in custody of the County.
While some recommendations addressed relatively straightforward adjustments to current programs or regulations, others involved funding of ongoing key services or major new initiatives.
Dungeness-Quilcene (DQ) Water Resources Management Plan (1994)
A key document in the history of Dungeness watershed planning is the Dungeness-Quilcene Water Resources Management Plan (DQ Plan 1994). This watershed plan builds upon and updates the DQ Plan, and integrates recommendations found to remain applicable. The Intergovernmental Agreement acknowledges this planning effort and states: “It is not the intent of the Initiating Governments to repeat, overturn, or delay implementation of technical studies, management recommendations, and water use agreements which were included in the [DQ Plan].” Chapters 5 and 6 of the DQ Plan contain the recommendations of the Regional Planning Group (RPG).
The DQ Plan itself reflects important milestones in the history of watershed planning for the Dungeness watershed and Washington State. It was created under the Chelan Agreement, consummated in 1990 by tribes, the State of Washington, and water stakeholders throughout the State. The Chelan Agreement was prompted by emerging water resource concerns and tribal interests and rights in water and water management. It created a Statewide forum to review water management policies and a framework for the development of regional water management plans. The DQ Plan provides further detail as to the Chelan Agreement goals and principles and reproduces the Agreement itself (Chapters 11 and 12).
In 1991, the Washington Legislature authorized Ecology to select two watersheds to develop pilot regional water management plans under the Chelan Agreement. The Dungeness-Quilcene was one of two pilots funded to test the process. Local leadership formed eight caucuses comprising State, local and tribal governments, agriculture, business, environmental groups, and recreation interests. These caucuses prepared the DQ Plan and submitted it to Ecology in1994.
The DQ Plan (1994) in turn built upon preexisting positive relationships fostered through initiatives by the Jamestown S’Klallam Tribe (Tribe), Ecology, the County, and others. In 1986, the County initiated a series of discussions on the Dungeness River, together with an Ecology-funded comprehensive water quality planning effort in the adjacent Sequim Bay watershed. These processes brought together the Tribe, riparian landowners, irrigators, business and industry representatives, realtors, educators, and several State and federal agencies with jurisdiction over river management. They laid a groundwork for cooperative water planning and convinced key parties, particularly in the agricultural community, that they offered a constructive opportunity to resolve resource management conflicts.
Chapter 1 Introduction and Planning Framework Page 1-22
ENTRIX, Inc. WRIA 18 Watershed Plan
The DQ Plan includes chapters describing the information resources collected in the planning process (Chapter 4, containing topical summaries of the extensive libraries of materials housed at the Jamestown S’Klallam Tribal Administration Building in Blyn, Washington) and the technical support structure established for data management (Chapter 9, containing analysis of information needs and data gaps as well as strategies and recommendations for research and data management). Chapter 4 of the DQ Plan also provides overviews of project reports commissioned for the Plan and technical studies undertaken by Plan participants; inventories planned and recent habitat studies and projects; and inventories stream flow data.
Chapter 11 of the DQ Plan contains its mission statement and regional planning goals and objectives, which adopt those of the Chelan Agreement. Chapter 12 of the DQ Plan provides the original water resources planning agreements, which created a foundation for collaborative water and watershed planning in Washington. These include the Tribal/State Environmental Protection Memorandum of Understanding and the subsequent Chelan Agreement, as well as the Regional Planning Group (RPG) ground rules. Chapters 13-15 describe the RPG committees, the pilot project itself, and its linkages.
Dungeness Area Watershed Analysis (1995) and Modules for Sedimentation and Stream Channels (2002)
As part of regional forest management planning at the federal level, a watershed analysis was prepared for the Dungeness River. An interagency team (Dungeness Area Watershed Analysis Cooperative Team [DAWACT]) was formed in 1994 to complete the analysis, including the Olympic National Forest, United States Fish and Wildlife Service (USFWS), Olympic National Park (ONP), Natural Resources Conservation Service (NRCS), Washington Department of Fish and Wildlife (WDFW), Clallam County, Jamestown S’Klallam Tribe (JSKT), Quilcene Ancient Forest Coalition, and Merrill & Ring Timber Company. The team followed federal guidelines for watershed analysis, referencing the Olympic National Forest Plan, DQ Plan (1994), Dungeness River Area Watershed Management Plan (DRMC and CCDCD 1993), and Sequim Bay Watershed Management Plan (SBWMC 1989).
The Dungeness Area Watershed Analysis (DAWACT 1995) area included the Dungeness River and its tributaries, as well as Johnson Creek to the east and McDonald and Siebert creeks to the west. “Key questions” were defined in five categories: fish/fish habitat; water quality/quantity; wildlife; vegetation; and riparian areas. Each of these categories forms a “module” in the plan. For each key question, values and uses are described; past and current conditions are characterized; desired conditions and trends are projected; opportunities are identified; and monitoring and information gaps are addressed.
The Olympic National Forest (Sasich et al. 2002) prepared updated sedimentation and stream channel modules to supplement the1995 Dungeness Area Watershed Analysis in these critical areas. The modules present a similar approach in defining key questions and describing resource conditions. They do not present recommendations related to these findings, however.
Chapter 1 Introduction and Planning Framework Page 1-23
ENTRIX, Inc. WRIA 18 Watershed Plan
Keys to an Understanding of the Dungeness River System (1996)
A fundamental information source of broad scope, the Keys to an Understanding of the Dungeness River System was compiled by Clark and Clark (1996). This document includes an overview of the river as a system; a detailed account of the history of human resource development and use in the watershed; summaries of fish and wildlife, geology and climate history; a detailed presentation of hydrologic and hydrogeologic data; and an extensive, annotated bibliography. It also includes a milepost description of the Dungeness River and its tributaries. A manual to using the “Keys” also was published.
Trust Water Agreement (1998)
Washington State’s first Trust Water Rights agreement was negotiated between the WUA and Ecology, and signed as a Memorandum of Understanding (MOU) to Transfer Water Under Trust Water Rights Program Chapter 90.42 RCW, dated April 13, 1998. Substantially all of the perfected surface water irrigation rights on the Dungeness River are brought under this MOU. Under the MOU, the irrigators have agreed to divert no more than half the flow of the Dungeness River1 and transfer water saved through conservation and efficiency measures to trust status. The MOU (WUA 1998) contains other notable purposes and provisions for watershed planning:
• It establishes certainty and a collaborative basis for water conservation and efficiency improvements for agricultural water use, to extend limited water supplies.
• It protects the water placed in the program from relinquishment under Washington law.
• It reserves one-third of the water for future irrigation use, as needed, under adjudicated rights of the water users, and transfers two-thirds to instream flow.
Innovative uses of the Trust Water MOU could be incorporated within any of the “pathways” for ESA (e.g., as part of a program qualifying for 4(d) Rule exception, as part of reasonable and prudent alternatives leading to a “no jeopardy” opinion, or as part of a Habitat Conservation Plan [HCP]).
Sequim-Dungeness Valley Agricultural Water Users Association Comprehensive Water Conservation Plan (1999)
The Montgomery Water Group (MWG) completed a Comprehensive Water Conservation Plan in 1999 for the WUA, detailing options for infrastructure improvements to reduce Dungeness River diversions, implement DQ recommendations, and meet the conditions of the Trust Water Agreement. The Plan projects an increase in
1 With conservation measures now implemented, even during the 2001 drought the WUA did not divert more than about 37 percent of the flow at any time.
Chapter 1 Introduction and Planning Framework Page 1-24
ENTRIX, Inc. WRIA 18 Watershed Plan
Dungeness River flows of up to 28 cfs if all recommendations are implemented, equating to a 16 percent gain in streamflows in average and dry years (see Section 1.3.4 below for further detail).
Floods in Lower Sequim Bay Tributaries (1999)
Orsborn and Orsborn (1999) prepared flood hazard analysis and planning in five drainages in the Blyn Basin, all tributaries of Sequim Bay. The five, including Dean, JCL, and Chicken Coop creeks (and two unnamed streams) were described in terms of existing hydrology and potential for increased flooding with future development. Recommendations were provided to minimize impacts for wetlands, streams, and fish.
Washington State Conservation Commission Salmon and Steelhead Habitat Limiting Factors for WRIA 18 (1999)
The Limiting Factors Analysis (Haring 1999) summarizes technical information on the role of habitat in healthy populations of natural spawning salmon and habitat limiting elements; watershed descriptions for WRIA 18 streams; species-by-species summaries of distribution and condition of salmon and steelhead stocks; an extensive and detailed analysis of fresh water habitat limiting factors by subbasin; analysis of marine habitat limiting factors; an assessment of the severity of limiting factors; a summary of high quality habitats in need of protection; and a review of data gaps. Each subbasin analysis addresses fish access, floodplain modifications, channel condition, substrate, riparian condition, water quality, water quantity, biological processes, and estuarine conditions and present recommendations to address limiting factors.
Hydrogeologic Assessment of the Sequim-Dungeness Area (USGS 1999)
The DQ Plan recognized critical interactions between groundwater and surface water in the Dungeness watershed, and recommended an extensive program of hydrogeologic research. The USGS (Thomas et al. 1999) accomplished significant progress toward these recommendations in its 1999 Water Resources Investigations Report, Hydrogeologic Assessment of the Sequim-Dungeness Area. The report was prepared in cooperation with Clallam County and Ecology. Its objectives are to:
• Describe and quantify the hydrogeologic framework, groundwater flow, and hydraulic properties of the groundwater system, including the Miller Peninsula to the east and extending to Morse Creek in the west, the Strait of Juan de Fuca to the north, and the Olympic foothills to the south.
• Improve estimates of groundwater recharge.
• Estimate flows between the groundwater system and streams and irrigation ditches.
• Describe the magnitude and distribution of nitrate and estimate the probable major sources of nitrate in the groundwater system.
• Determine pumpage from the major aquifers for one calendar year.
• Estimate subsurface inflow from bedrock areas to the south.
Chapter 1 Introduction and Planning Framework Page 1-25
ENTRIX, Inc. WRIA 18 Watershed Plan
Three aquifers were described, including their boundaries, confining beds, and rate and direction of flow across them. These three are termed the “shallow,” “middle,” and “lower” aquifers. Water budgets were created for both the long-term and the study period (December 1995 to September 1997), based on analyses of precipitation, runoff, evapotranspiration, and groundwater recharge and discharge. The report is extensively reviewed in Chapter 2 of this Plan.
1.2.3 History of Watershed Planning in West WRIA 18
Elwha River Ecosystem and Fisheries Restoration Act (PL 102-495) and Dam Removal (1992)
Elwha River resources were addressed in a previous watershed planning process leading to the Elwha River Ecosystem and Fisheries Restoration Act (Public Law (PL) 102-495, 1992). The Act established a framework for evaluating the effects of the two dams on the Elwha mainstem, and for their removal if necessary for the full restoration of the Elwha River ecosystem and native anadromous fisheries. The Act explicitly does not abridge or modify existing rights to Elwha River water or affect any tribal rights.
Implementation of the Act to date by the United States Department of Interior (USDI) has included a Secretarial Report to Congress (The Elwha Report, USDI et al. 1994), two Environmental Impact Statements (USDI et al. 1995, 1996), and a Record of Decision. The WRIA 18 Intergovernmental Agreement states that “planning carried out under this agreement shall complement, not reopen or otherwise prejudice, that preexisting and ongoing process.”
The Elwha Report (USDI et al. 1994) includes terms of acquisition for the dam projects, alternatives in lieu of dam removal, specific proposals for management of all lands acquired outside the boundaries of the ONP, measures to protect existing quality and availability of water from the Elwha River for municipal and industrial purposes: An Elwha River Restoration Mitigation and Information Work Group (ERRWG) meets monthly to address mitigation options for the City of Port Angeles, Dry Creek, and Elwha Homeowners water systems prior to dam removal. A supplemental EIS by the National Park Service (NPS) is expected to be completed in 2004.
Port Angeles Regional Watershed Characterization (1994)
Concerned with potential effects of nonpoint pollution on beneficial uses of water, in 1993 Clallam County Commissioners requested the Puget Sound Cooperative River Basin Team (PSCRBT) to assist in characterizing the Port Angeles Area watershed. A local watershed committee was formed to guide the characterization, including representatives from Clallam County, the City of Port Angeles, Port of Port Angeles, Clallam Conservation District, ONP and the PSCRBT. A draft characterization was prepared in 1994 (Clallam County Planning Division et al. 1994), which the County used to develop and implement both a watershed plan and regional comprehensive land use planning under the Growth Management Act (GMA). The characterization divides the Port Angeles watershed into four zones, including:
Chapter 1 Introduction and Planning Framework Page 1-26
ENTRIX, Inc. WRIA 18 Watershed Plan
The area east of Morse Creek (to Siebert Creek);
The west side of Morse Creek, west through the lower Elwha River drainage and Lake Sutherland, including the City of Port Angeles and Ediz Hook;
Eden Valley and the upper Colville and Salt creek areas; and
National Park lands to the south.
The characterization (Clallam County Planning Division et al. 1994) summarizes watershed natural resources, land use and socio-economics; reviews beneficial uses of water (including drinking water, fish, shellfish and wildlife habitat, recreation, commerce and navigation) and describes nonpoint sources of pollution (forestry, agriculture, urban, and residential). Lake Sutherland is identified and profiled as an Area of Special Concern; water quality in the lake was considered adequate but potentially at risk from onsite septic systems.
Generally, the report found that the Port Angeles Harbor and urban streams were the most severely impacted; urban and high density residential growth were considered the most important threats to future water quality. Uncontrolled stormwater was greatly affecting many urban streams, particularly turbidity in Peabody and Valley creeks. Fecal coliforms were high in Peabody Creek and were elevated above standards in Dry, Tumwater, and White creeks. Road construction and timber harvest in forestlands adjacent to streams affected salmon habitat, but agricultural impacts were limited. Stream baseflows were fed by groundwater recharge and wetlands, and low flows were limiting to both anadromous and resident fish populations.
Washington State Conservation Commission Salmon and Steelhead Habitat Limiting Factors for WRIA 18 (1999)
The Limiting Factors Analysis (Haring 1999) described above also includes West WRIA 18 streams.
1.2.4 WRIA 18 Watershed Planning Process
WRIA 18 Watershed Plan Roadmap
Figure 1.2-2 illustrates the WRIA 18 watershed planning “roadmap.” The figure combines information on the duration and timing of activities in the several phases of watershed planning; it shows stakeholders involved and their major activities; and it lists for each phase the key agreements and products. A key at the bottom of the figure identifies the various icons.
Following the organization and grant agreement steps described above, Phase 3 watershed planning began with a “visioning” workshop, moving into plan development, review, and approval. The two Planning Units participated in watershed planning on separate and parallel tracks. Both EMMT and DRMT held a series of workshops, drawing on existing watershed assessments and resource studies to identify issues, develop alternative solutions, and prepare plan recommendations.
Agreements
Activities
Phase
Time
Products
Key
To Feb 2001 March 2001 2002-2003 Feb - June 2003 September 2003
Start-up Vision PlanDevelopment PlanReview PlanAdoption
• Contract• Work Plan
• Process• “Headlines”
IssuesAction
• Visions
• Outline ofPlan
•CharacterizationofIssues•IdentificationofAlternatives•RankingofAlternatives•PlanRecommendations
• Draft Plan• Draft SEPA
(NPRF)
• County CommissionersApproveFinal WRIA18WatershedPlanandSEPA
• Contract• Work Plan• Office Set-up
• Outline• Public Involvement WorkPlan
• Phase2 Data Synthesis (EMMT)• Phase2 Report (DRMT)• WorkshopMaterials• OutreachMaterials
•EMMT/DRMTApprovePlan•EMMT/DRMTApproveSEPA
• Final WatershedPlan• Final SEPA
STOP
Midpoint Review
andtake stock ofprogressre“combinedplan” document
EMMT DRMT IG’s Facilitator Documents PublicMeetings
Dept.Ecology
CountyCommissioners
StakeholderInterviews
OutreachCoordinator
OW RKLANP
A P O EP R V
WORKPLAN
Interviews
Workshop
VisionWorkshop
Workshop
Morse Creek
.P I.
PH.2
Small Basins
PH.2
Workshops Workshops
PH.2Rpt
ElwhaRiver
PH.2
Workshops Workshops
EMMTPublicProcess
P AE I W
R VSP R V
L NR VE ,
E I E,A P O E
fDratSEPA
OpenOpenOpen
DraftPlan
IG’s
Select
Select
NON- PROJECT REVIEWFORM
Draft PlanPublic Review
County Commissioners
Fi alnPlan
Figure 1.2-2. WRIA 18 Watershed Plan Roadmap.
Chapter 1 Introduction and Planning Framework Page 1-28
ENTRIX, Inc. WRIA 18 Watershed Plan
This page intentionally left blank.
Chapter 1 Introduction and Planning Framework Page 1-29
ENTRIX, Inc. WRIA 18 Watershed Plan
EMMT used a geographic focus to organize its work, proceeding from Morse Creek in the east, through the smaller urban independent drainages in the center of West WRIA 18, and completing its work with the Elwha River. For each subbasin, EMMT developed characterizations of resources (including salmon stocks and status, habitat condition and limiting factors) as a basis for issues identification, alternatives analysis and plan recommendations.
DRMT took a somewhat different approach, building on and updating the existing DQ Plan. A series of workshops were held to update that plan and deal with new and emerging issues. These issues included habitat, flows, groundwater, water quality, estuarine/nearshore, irrigation, water conservation, flood-hazard planning, stormwater, land use, forest practices, roads, water supply, water use, water budget, education and public involvement, as well as issues specific to Sequim Bay (WRIA 17).
The East and West WRIA 18 planning processes culminated in joint meetings in which EMMT and DRMT plans were integrated, resulting in this Watershed Plan. This Plan links local resource knowledge and planning to regional and State salmon recovery guidelines and processes, including the Joint Natural Resources Cabinet Guidance on Watershed Assessment for Salmon (JNRC 2001), the Shared Strategy (discussed below), and the North Olympic Peninsula Lead Entity Strategy and Process - 2001 Project Strategy (NOPLE 2001). As part of the watershed planning process, pathways to ESA resolution and salmon recovery were explored. Through links to a Comprehensive Irrigation District Management Plan (CIDMP) being developed by the WUA, a Habitat Conservation Plan (HCP) may also become incorporated in the longer-term WRIA 18 planning process.
East WRIA 18 Flow of Planning
Figure 1.2-3 depicts the flow of planning in East WRIA 18, linking the watershed planning, salmon recovery, and habitat restoration processes. The figure illustrates the origin of East WRIA 18 planning in the DQ Plan (described above). As shown, DRMT carries forward the watershed planning process begun under DQ. As provided by County ordinance, it also advises Clallam County Commissioners.
DRMT is integrating responses to the listings of salmonid species under the Endangered Species Act (shown in blue in the center axis of the figure); the completion of 2514 watershed planning (shown in blue to the right side of the figure); and the restoration of Dungeness River habitat and recovery of salmon (shown in green to the left side of the figure).
A number of the governments represented on DRMT are pursuing 4(d) Rule compliance with ESA, as shown by the black arrows connecting their “seats around the table” to that box in the ESA pathways. The USFS, a federal agency, is complying with ESA through Section 7 consultation. The irrigators have undertaken a pilot Comprehensive Irrigation District Management Plan (CIDMP, shown in yellow) funded by the Washington Department of Agriculture (WDA). The CIDMP process was negotiated with the federal
Chapter 1 Introduction and Planning Framework Page 1-30
ENTRIX, Inc. WRIA 18 Watershed Plan
Agencies National Marine Fisheries Service (NMFS) and USFWS through Washington’s Agriculture Fish and Water process. This was carried forward from the Governor’s Extinction is Not an Option salmon recovery initiative (JNRC 1999). The WUA has been selected for this pilot project, based on its track record of collaboration with groups pursuing watershed management and salmon recovery in the Dungeness, predating the DQ process and continuing to the present. A key success of the DQ Plan has been the implementation by the WUA of two keys to Dungeness River restoration:
• A Trust Water Memorandum of Agreement (see discussion above).
• The development of a Comprehensive Water Conservation Plan, which the WUA is now implementing.
These two cornerstones of East WRIA 18 watershed planning are also shown in yellow, leading into the current CIDMP process. The CIDMP process is intended to result in Implementing Agreements with the federal agencies that will satisfy federal requirements under Endangered Species Act (ESA) and the Clean Water Act (CWA). Because of the scale of the irrigators’ river diversions, it is not likely that they will be able to pursue a 4(d) pathway to comply with the ESA, but they may incorporate a Habitat Conservation Plan (under Section 10 of the ESA) in their Implementation Agreement. The Implementation Agreement for Clean Water Act compliance would likely be in the form of a Total Maximum Daily Load analysis (TMDL). An Environmental Impact Statement (EIS) is also required under the State Environmental Policy Act (SEPA).
Similar outcomes are expected from the watershed planning process, shown in the blue box on the bottom right corner of Figure 1.2-3. The outcomes of watershed planning include:
Recommendations for an instream flow rule (instream flow element) A water supply assessment (water quantity element) Habitat recommendations (habitat element) Draft Non-Project Review Form for SEPA compliance Strategies for meeting water needs of fish and humans
SharedStrategyShared
StrategyShared
Strategy
2496Salmon
Recovery
2496Salmon
Recovery
2496Salmon
Recovery
SRFBoardSRF
BoardSRF
Board
DRRWGDRRWGDRRWG
DRMTDRMTDRMTAssociated Members
Associated Members
Associated Members
2514Watershed
Plan
TargetFlowsTargetTargetFlowsFlows
CleanWater
District
CIDMPComprehensiveIrrigation DistManagement
Plan
HCP
TMDL?
EIS
Trust WaterMOU
ConservationPlan
ESAPathways
Section 7
4(d) Rule
HCP
ToESA
InstreamFlow Rule
WaterSupply
PlanSEPA
HabitatPlan
Water
ToHabitat
Plan
PropertyOwners
NOLT
WUA
PPFJSKT City County
Ecology
WDFW USFS CCD
SportFish
DQPlan
Clallam County
Commiss-ioners
Figure 1.2-3. Flow of East WRIA 18 Planning.
DQPlan
Quality
Chapter 1 Introduction and Planning Framework Page 1-32
ENTRIX, Inc. WRIA 18 Watershed Plan
This page intentionally left blank.
Chapter 1 Introduction and Planning Framework Page 1-33
ENTRIX, Inc. WRIA 18 Watershed Plan
These watershed planning elements incorporate a number of activities and plans already underway in the watershed and overseen by DRMT. These are shown directly linked to the DRMT watershed management functions, with ESA pathways shown in blue and the irrigation compliance activities shown in yellow. All three of these—ongoing DRMT watershed management, the 2514 Watershed Plan, and the Comprehensive Irrigation District Management Plan—are directly linked to the habitat restoration and salmon recovery activities shown in green.
In completing watershed planning, DRMT has held workshops on habitat restoration, salmon recovery and ESA compliance; Dungeness River instream flows; small streams, wetlands, riparian areas, and wildlife; water quality; estuaries and nearshore marine habitat; groundwater; City of Sequim water supply; flood hazard and stormwater; irrigation; water conservation; forest practices and roads; land use; Siebert Creek; and water supply, water management and water use (see Appendix 1-E for the DRMT focus workshop schedule). A separate workshop on Sequim Bay addressed WRIA 17 issues contained within the Dungeness planning area.
Another significant result of the DQ process was the establishment of a Dungeness River Restoration Work Group (DRRWG), a technical working group responsible for identifying and driving forward the implementation of key habitat restoration projects on the Dungeness. The DRRWG has developed a detailed habitat restoration plan (“Blue Book”) for the Dungeness River, which is a key source for 2496 projects and 2514 habitat planning. Since the adoption of the DQ Plan, Washington has created a Salmon Recovery Funding Board (SRFB) to review project proposals prepared under regional strategies developed by Lead Entities, including the North Olympic Peninsula Lead Entity (not named in the figure, but included within the 2496 Salmon Recovery oval). Both the DRRWG Blue Book and NOPLE Strategy and Process (NOPLE 2001) are incorporated by reference in the Watershed Plan habitat element. All three are interacting directly with the Puget Sound Salmon Forum Shared Strategy, providing the local level planning functions and technical resources needed to ground that regional strategy in effective local action. All three, plus the irrigators’ CIDMP, also feed directly into the development of target flows, a key outcome for salmon recovery, ESA compliance, and watershed planning.
West WRIA 18 Flow of Planning
The flow of planning in West WRIA 18 is considerably simpler than that in East WRIA 18 (Figure 1.2-4 and Appendix 1-G), for several reasons:
EMMT does not have a history rooted in an earlier generation of watershed planning, as DRMT does with the DQ Plan. EMMT made a recommendation for a Westside watershed council comparable to the DRMT (see Chapter 3).
Chapter 1 Introduction and Planning Framework Page 1-34
ENTRIX, Inc. WRIA 18 Watershed Plan
Irrigated agriculture is minimal in West WRIA 18, and is not represented in EMMT. There is no comparable CIDMP process. Shellfish closures have not affected nearshore waters off West WRIA 18, and there is no Clean Water District.
EMMT lacks a technical committee, and has not established a working relationship with a restoration work group (such as the Olympic National Park’s Elwha River Restoration Work Group) comparable to that which exists between DRMT and the DRRWG. EMMT made a recommendation for the creation of a technical committee to advise the Westside watershed council (see Chapter 3).
The West WRIA 18 flow of planning (Figure 1.2-4) shares with DRMT the 2514 process, the 2496 salmon recovery process, and the ESA compliance pathways. Each of these processes are proceeding similarly in the two Planning Units, with similar linkages.
Target flows are of equal concern on the West side, particularly as they may affect Morse Creek and the Elwha River.
Watershed Visions
DRMT and EMMT met in a joint Watershed Vision Workshop on March 29, 2001. The two Planning Units considered watershed functions and values that members wanted the Watershed Plan to reflect and defined the pressing needs to which it must respond. They identified indicators of stress in WRIA 18 watersheds as well as drivers of change (such as population growth and land development). High-quality preservation and restoration areas were listed as those places in WRIA 18 that remain in good condition and those that need attention. Visions of the future were elicited as a guide to the planning process. These included visions of habitat and instream flows in 50 years, and of water supply and water quality in 20 years.
The Planning Units also developed an overview of the larger planning framework used to orient watershed planning within the larger context of laws and regulations. The “human dimensions” of watershed planning were explored to identify watershed planning stakeholders, their needs, and how they will use or be served by the plan for long-term resource management. Joint implementation of Watershed Plan recommendations was discussed, to identify what parts of the watershed plan might be implemented across all of WRIA 18 and what parts could lead to independent recommendations and actions in East and West WRIA 18. A draft Watershed Plan outline was developed, considering the scope of issues and the constraints of time and budget. The joint Planning Units reviewed the watershed planning process to define the flow of work and “road map” for Plan development.
SharedStrategyShared
StrategyShared
Strategy
2496Salmon
Recovery
2496Salmon
Recovery
2496Salmon
Recovery
SRFBoardSRF
BoardSRF
Board
ERRWGERRWGERRWG
EMMTEMMTEMMT2514
WatershedPlan
TargetFlowsTargetTargetFlowsFlows
ESAPathways
Section 7
4(d) Rule
HCP
ToESA
InstreamFlow Rule
WaterSupply
PlanSEPA
HabitatPlan
WaterQuality
ToHabitat
Plan
HomeOwners
Edu.
Rec.
LowerElwhaTribe
City County Ecology
Industry
SportFish
Comm./Econ.Dev.
Water Purveyors
Environ.
Figure 1.2-4. Flow of West WRIA 18 Planning.
Chapter 1 Introduction and Planning Framework Page 1-36
ENTRIX, Inc. WRIA 18 Watershed Plan
This page intentionally left blank.
Chapter 1 Introduction and Planning Framework Page 1-37
ENTRIX, Inc. WRIA 18 Watershed Plan
Summary of Public Involvement Process
Both Planning Units have followed the Watershed Management Act’s mandated process to organize, secure the involvement of key stakeholders in the watershed, and invite the participation of tribes. Each Planning Unit prepared a public outreach plan and held a total of four public meetings (two in Sequim and two in Port Angeles) during the course of Watershed Plan preparation. A public hearing was held by Clallam County Board of Commissioners at the time the final plan was considered for approval.
The WRIA 18 Watershed Plan is the result of a lengthy, collaborative, and consensus-based process involving all key stakeholders in the watershed. Each Planning Team developed its approach to watershed planning through a planning process characterized by open public meetings; active public outreach; full involvement of all key stakeholders as members of the Planning Teams; and lengthy consideration of watershed issues, alternatives, and solutions. In DRMT’s case, planning has extended over more than a decade, rooted in the previous Dungeness-Quilcene Watershed Plan.
The Watershed Plan represents the collective wisdom and collaborative work of many participants over an extended period. The Intergovernmental Agreement mandates that interim decisions reached during the planning process be reached by consensus (which the Agreement defines as “unanimous agreement”), and both Planning Teams have proceeded under consensus-based decision-making.
ADDENDUM, May 2005
• 2003 amendments to Chapter 90.82 RCW describe and authorize funding opportunities for implementation (a.k.a. Phase 4), including a requirement for a complete implementation plan within the first year of funding.
• SEPA documentation may be found in Appendix 1-H.
• The planning unit submitted their approved watershed plan to the Board of Clallam County Commissioners in the fall of 2004 for its adoption. Following three public hearings and a variety of outreach activities extending into spring 2005, the joint planning unit amended some of the recommendations from Chapter 3.
• On June 7, 2005, the Board of Clallam County Commissioners unanimously approved the WRIA 18 Watershed Plan as amended by the joint planning unit. Documentation of the extended public hearing process may be found in Volume 2: Appendix 3-E.