1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many...

Post on 21-Jan-2016

216 views 1 download

Tags:

Transcript of 1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many...

1

L1CAL for

DAQ Shifter

By Selcuk Cihangir3/20/2007

Representing

L1CAL group (slides from many people)

2

Outline

• Why?• What?• When and where? (Obvious)• How?• What to do with it? (Procedures)• Last Word, until……

3

Why?

• Obsolete components of old system (1988)• Operate with 132 ns and 396 ns bunch spacing at

L=2x1032

• Improved sampling and filtering to more precise measurement of Et on trigger towers, better threshold and better background rejection

• Additional rejection from cal-track matching• Able to do clustering, finding objects (electron, jets,

taus, etc): Used to be done at L2 for RunIIa• More compact system, easy maintenance

4

What?

5

Patch PanelPatch Panel Card

BLS CablePleaded Foil Cable

Components

in MCH1

Front pins to BLS signals

6

ADF CardsLVDS Cables

Pleaded Foil Cables

ADF Crate-Front ViewADF Crate-Rear View

7

TAB’s GAB TAB’s

TAB/GAB Crate-Front ViewTAB/GAB Crate-Rear View

LVDS Cables

8Readout Crate Communication Crate1

2

3

4

5

6

7

8

L1 Calorimeter Trigger Control Path: Hardware

9

L1 Calorimeter Trigger Control Path: Schematics

L1Cal ExpertPrograms

L1Cal TCC

COOR

Monitoring Clients

Bit3B

it3

V.I

. Mas

ter

(to

AD

F)

V.I

. Mas

ter

(to

VR

B)

VM

E/S

CL

(to

TA

B)

SC

L D

istr

ibu

tor

(to

AD

F)

L1Cal Comm.Crate VME-9U

ADF Crate #1 of 4VME-6UA

DF

#20

V.I

. Sla

ve

AD

F #

20

… ADF Crate #4 of 4VME-6UA

DF

#20

V.I

. Sla

ve

AD

F #

1

……

TAB/GABCrateCustom-9U

TA

B #

1

TA

B #

8

GA

B

…L1CalReadoutCrateVME-9U

V.I

. Sla

ve

VR

B

VR

B

VR

BC

SB

C

L3

L2

Ethernet

Optical Fiber Splitters to L2Cal Crate

P. Laurens Rev: 31-May-05 (ALS, PAL)

TFW

SCL

1 SCLVME

2 Bit3

3 VIM

4 VIS

5 SCLD

6 VRBC

7 VRB

8 SBC

10

Experts Do

• Download Firmware• Initialize the system• Do pedestal runs (not anymore)• Adjust Pedestals• Power up and down the system• Do Pulser Runs• Others• What does the shifter do?

11

L1Cal ExpertPrograms

L1Cal TCC

COOR

Monitoring Clients

Bit3

Ethernet

TFW

SCL

Procedures-Monitoring Tools (for Experts)

L1Cal TCC GUI

12

New Tool: Adjust Pedestals (for Experts)

Possibility to return the previous values

Records of changes are kept

Click to run. Takes a minute

Get to this from Control/StatusButton of the L1Cal TCC GUI

13

L1Cal ExpertPrograms

L1Cal TCC

COOR

Monitoring Clients

Bit3

Ethernet

TFW

SCL

L1Cal TT Monitor GUI

Menu:Take MeanMeanx100SDx100

OperationCondition

BX Choice

Max ADC

Detector Region

One turn of data every 5 seconds

14

How to Run

On an Online machine• Setup d0online• cd

/projects/D0l1/l1cal2b/l1cal2b_monitor/py/• ./L1CalIIB_TTMon.py• ./L1CalIIB_TabGabMon.py

15

Record TT’sbeyond range

Best Indicator to problem TT: Large SD

16

Record TT’soutside range

Chose E or Et

Logfile_2007_03_10_14_17_39In directory this is run from

New Tool: Recording problems (for Experts)

17

HAD TT (-9,22)

Catching a Hot TT

Information fromRecorded monitoring

GUI

18

L1Cal ExpertPrograms

L1Cal TCC

COOR

Monitoring Clients

Bit3

Ethernet

TFW

SCL

L1Cal TAB/GAB Status GUI

Displays the ERROR codes at TABs and GAB as they occur

19

New Tool-Coming Soon

should always be running without any human intervention as long as one of several online host is available. -> checks the full digital chain of the L1Cal:    -> parity, sync and BC errors for digital transmission in ADF->TAB->GAB    -> parity of TAB/GAB -> L2/L3 data    -> BC synchronization between ADF/TAB/GAB and VRBs.    -> Bitwise agreement of simulated and/or terms from measured raw TTs.

20

New Tool-Cont.

This requires some judgment from the shifter.  If it's the start of a new store or new run, or between stores and the L1Cal is out of the crate, then it might be stalled for up to a few minutes.

Problem detected, page L1Cal

21

L1Cal ExpertPrograms

L1Cal TCC

COOR

Monitoring Clients

Bit3

Etherne

t

TFW

SCL

Tower ExclusionOnline ExaminePulser RunPedestal CalibrationGain Calibration

More Procedures (for Experts)

22

Online Examine

Warm TT’sConfirm withMonitoring GUI SD display

Hot Cal Tower?

Adjustable threshold

23

Different threshold

Dead Towers?

Online Examine

24

Last Word….

• A versatile system• Still improving• We are learning more about its capabilities • Developing new tools as needs arise

Until …… We re-write this presentation once we know

more…………