1 BROOKHAVEN SCIENCE ASSOCIATES
LBT Diagnostics Installation Update
Dan PadrazoDiagnostics & Instrumentation Group
Feb 1, 2012
2 BROOKHAVEN SCIENCE ASSOCIATES
Acknowledgements
Om Singh Timur ShaftanIgor Pinayev Kurt VetterBernie Kosciuk Yong HuRay Fliller Sergei SeletskiyDick Hseuh Tony CaracappaMike Johanson
3 BROOKHAVEN SCIENCE ASSOCIATES
Overview
Diagnostics Technical Support for Installation Diagnostics for Linac To Booster Transport Line Integration Model of LBT. Illustration of LBT Diagnostics Part 1 & 2. Illustration of LINAC BPM / PUE. Installation of LBT Diagnostics Part 1 Integration of LBT Diagnostics Part 1 Electronics, Racks, Controls Interface Injector Diagnostics Installation Schedule Summary / Status
4 BROOKHAVEN SCIENCE ASSOCIATES
Diagnostics Technical Support for LBT Installation
Group Leader – Om Singh
Project Engineer – Dan Padrazo
Project Engineer- Bernie Kosciuk
Engineer – Bel Bacha
Engineer – Tony Caracappa
AP – Igor Pinayev
AP - Sergei Seletskiy
Technical Supervisor- Wayne Rambo
Technical Support – Jack Tallent, Chris Danneil,
Marshall Maggipinto, Artie Munoz, Al Borelli,
Dennis Poshka,George Stenby(MOU),
Dave Tupper(JS), Bill Brannigan(JS)
5 BROOKHAVEN SCIENCE ASSOCIATES
Diagnostics Supported for (LBT / LINAC) Monitor Type Total
QTYPart-1QTY
Part-2 QTY
Resolution Measured Beam Parameter
FCT 2 1 1 .6pC/bunch Fill Pattern, Bunch Charge
ICT 2 1 1 .6pC/train Injected Bunch Charge, Efficiency
BPM-(LA) 1 1 30µ Beam Position
BPM-(SA) 5 2 3 30µ Beam Position
Energy Slit 1 1 Beam Energy Spread
Flag- LA-(40mm x 90mm) 2 2 OTR-50µYAG- 30µ
Energy Spread, Beam Size, Position
Flag-SA-(40mm) 7 5 2 OTR-50µYAG- 30µ
Beam Size, Position
Faraday Cup 2 2 .05-22nC Gross Charge per Train(0-150 Bunches)
BPM – (LINAC) 5 Beam Position
6 BROOKHAVEN SCIENCE ASSOCIATES
Integration Model LBT Part 1 & 2
LBTL-Part 1
LBTL-Part 2
7 BROOKHAVEN SCIENCE ASSOCIATES
2 Part 1 DiagnosticsMonitor Type Part 1 Qty IdentificationBPM-(SA) 2 LB-P1, LB-P3BPM-(LA) 1 LB-P2,Flag-SA 5 LB-VF1, LB-VF1BD1, LB-VF2BD1, LB-VF3BD1, LB-VF3Flag-LA 2 LB-VF2, LB-VF1BD2FCT 1 LB-FT1ICT 1 LB-IT1Energy Slit 1 LB-SL1Faraday Cup 2 LB-FC1BD1, LB-FC2BD2
Illustration LBT Diagnostics-Part 1
8 BROOKHAVEN SCIENCE ASSOCIATES
Illustration LBT Diagnostics-Part 2
2 Part 2 DiagnosticsMonitor Type Part 2 Qty IdentificationBPM-(SA) 3 LB-P4, LB-P5, LB-P6Flag-SA 3 LB-VF3, LB-VF4, LB-VF5FCT 1 LB-FT2ICT 1 LB-IT2
9 BROOKHAVEN SCIENCE ASSOCIATES
BPM Supported in LINAC
LIN-P1
LIN-P2
LIN-P3
LIN-P4
LIN-P5
LINAC BPM
10 BROOKHAVEN SCIENCE ASSOCIATES
LA BPM Assembly 11-12-11
SA BPM Assembly 11-12-11
LA BPM Chamber- populated w/Button Feed-thru Assembly (11-12-11)
TL Button/Feed-thru assembly 11-15-11
Pre-Installation Work (LBT-BPM Chamber/PUE)
Fixture using single wire test
40mm x 90mmElliptical
11 BROOKHAVEN SCIENCE ASSOCIATES
Pre-Installation Work (Testing Energy Slit/ Flags)
Test Rack used for Diagnostics Electronics and Controls. Test Stand using SP-1005 Girder top for SA Flag testing (11-23-11)
Energy Slit & LA Flag mounted on Production Version SP-1006 Girder, captured in portable clean room (11-4-11)
12 BROOKHAVEN SCIENCE ASSOCIATES
Pre-Installation Work (FCT/ICT)
In-Flange Bergoz FCT- Cleaned and prepared for install.FCT-CF6”3/4-96.0-UHV-20:1-H
FCT-Test Fixture for Pre test prior to install
In-Flange Bergoz ICT – Cleaned and prepared for install.ICT-CF6”-60.4-UHV-070-20:1-H
Beam Charge Monitor ChassisBCM-IHR Module
13 BROOKHAVEN SCIENCE ASSOCIATES
Tunnel Installation Work (LBT Part 1 & 2)
LBT Girder Install Part 1(11-7-11)
LBT Component Install Part 1(1-4-12)
LBT Part 2 Diagnostics Cables Pulled (12-6-11)
LBT Part 2 (11-30-11)
14 BROOKHAVEN SCIENCE ASSOCIATES
Cable Description / Specification
LMR-240FR – Low Loss Coax Cable (RF BPM / ICT) Attenuation (db/ft) .057db @500Mhz Jacket Diameter .240” Custom trim to relative timing specification of +/-25pS, with a delta phase specification of 4.5 degrees @
500Mhz.
LMR-400FR – Low Loss Coax Cable (RF BPM / FC) Attenuation (db/ft) .028db @500Mhz Jacket Diameter .400”
LMR-900FR – Low Loss Coax Cable (FCT) Attenuation (db/ft) .014db @500Mhz Jacket Diameter .900”
SIO2 – Silicon Dioxide Low Loss Coax Cable (RF BPM) Attenuation (db/ft) .06db @500Mhz Jacket Diameter .141” Semi-Rigged, fired glass hermetically sealed assembly Commercially fabricated as a straight length and a relative timing specification of +/- 25ps, with a delta
phase specification of 4.5 degrees @ 500Mhz
15 BROOKHAVEN SCIENCE ASSOCIATES
BPM Cable Work
LMR-240FR Cable install (11-8-11)
Pneumatic Crimp tool
Mobile Cart for Cable Time / Terminate (1-10-12)
SIO2 Cable Assembly (1Meter)
16 BROOKHAVEN SCIENCE ASSOCIATES
BPM / PUE / PTC Module Installation
LINAC PTC Module Install (11-8-11)
Patch Panel Interface to PTC for LINAC
LBT-P1 BPM SA Chamber Assembly at SP-1002 Girder w/SIO2 Cables Installed 1-20-12
LIN-P5 BPM PUE Assembly w/LMR-240FR Cables (1-15-12)
17 BROOKHAVEN SCIENCE ASSOCIATES
LBT Flags Installation
SA Flag Assembly at SP-1005 Girder
LA Flag Assembly at SP-1006 Girder
Tunnel patch panels for flag Pneumatics / PLC / Controls
Tunnel patch for Energy Slit / Flag at SP-1006
18 BROOKHAVEN SCIENCE ASSOCIATES
LBT Beam Dump / Faraday Cup Install
Dump 1 at SP-3000 Girder (1-20-12)
Dump 2 at SP-4000 Girder (1-20-12)
19 BROOKHAVEN SCIENCE ASSOCIATES
LBT Electronics Rack Layout
cPCI CPU board
cPCI Acqiris digitizer
20 BROOKHAVEN SCIENCE ASSOCIATES
PLC Controls for Flags (Rear View)
Cable Route into Rack Penetrations (Top View)
BPM receiver LINAC (Front View)
Diagnostics Electronics / Cable Management (RG-Q)
Custom patch Panel /SR for LMR Cables (Top View)
21 BROOKHAVEN SCIENCE ASSOCIATES
Injector Diagnostics Installation Schedule
22 BROOKHAVEN SCIENCE ASSOCIATES
Implemented Resources loaded Work Plan Diagnostics Component Tunnel Installation - Complete Diagnostics Cable pull, Time, Termination - Complete Diagnostics Electronics Install in Rack RG-Q1,2,3,4 - Complete Post installation Diagnostics Sub-System Functional testing - Complete System testing in progress, expected to be complete 2-13-2012
Summary / Status