1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics &...

Post on 11-Jan-2016

214 views 0 download

Transcript of 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics &...

1 BROOKHAVEN SCIENCE ASSOCIATES

LBT Diagnostics Installation Update

Dan PadrazoDiagnostics & Instrumentation Group

Feb 1, 2012

2 BROOKHAVEN SCIENCE ASSOCIATES

Acknowledgements

Om Singh Timur ShaftanIgor Pinayev Kurt VetterBernie Kosciuk Yong HuRay Fliller Sergei SeletskiyDick Hseuh Tony CaracappaMike Johanson

3 BROOKHAVEN SCIENCE ASSOCIATES

Overview

Diagnostics Technical Support for Installation Diagnostics for Linac To Booster Transport Line Integration Model of LBT. Illustration of LBT Diagnostics Part 1 & 2. Illustration of LINAC BPM / PUE. Installation of LBT Diagnostics Part 1 Integration of LBT Diagnostics Part 1 Electronics, Racks, Controls Interface Injector Diagnostics Installation Schedule Summary / Status

4 BROOKHAVEN SCIENCE ASSOCIATES

Diagnostics Technical Support for LBT Installation

Group Leader – Om Singh

Project Engineer – Dan Padrazo

Project Engineer- Bernie Kosciuk

Engineer – Bel Bacha

Engineer – Tony Caracappa

AP – Igor Pinayev

AP - Sergei Seletskiy

Technical Supervisor- Wayne Rambo

Technical Support – Jack Tallent, Chris Danneil,

Marshall Maggipinto, Artie Munoz, Al Borelli,

Dennis Poshka,George Stenby(MOU),

Dave Tupper(JS), Bill Brannigan(JS)

5 BROOKHAVEN SCIENCE ASSOCIATES

Diagnostics Supported for (LBT / LINAC) Monitor Type Total

QTYPart-1QTY

Part-2 QTY

Resolution Measured Beam Parameter

FCT 2 1 1 .6pC/bunch Fill Pattern, Bunch Charge

ICT 2 1 1 .6pC/train Injected Bunch Charge, Efficiency

BPM-(LA) 1 1 30µ Beam Position

BPM-(SA) 5 2 3 30µ Beam Position

Energy Slit 1 1 Beam Energy Spread

Flag- LA-(40mm x 90mm) 2 2 OTR-50µYAG- 30µ

Energy Spread, Beam Size, Position

Flag-SA-(40mm) 7 5 2 OTR-50µYAG- 30µ

Beam Size, Position

Faraday Cup 2 2 .05-22nC Gross Charge per Train(0-150 Bunches)

BPM – (LINAC) 5 Beam Position

6 BROOKHAVEN SCIENCE ASSOCIATES

Integration Model LBT Part 1 & 2

LBTL-Part 1

LBTL-Part 2

7 BROOKHAVEN SCIENCE ASSOCIATES

2 Part 1 DiagnosticsMonitor Type Part 1 Qty IdentificationBPM-(SA) 2 LB-P1, LB-P3BPM-(LA) 1 LB-P2,Flag-SA 5 LB-VF1, LB-VF1BD1, LB-VF2BD1, LB-VF3BD1, LB-VF3Flag-LA 2 LB-VF2, LB-VF1BD2FCT 1 LB-FT1ICT 1 LB-IT1Energy Slit 1 LB-SL1Faraday Cup 2 LB-FC1BD1, LB-FC2BD2

Illustration LBT Diagnostics-Part 1

8 BROOKHAVEN SCIENCE ASSOCIATES

Illustration LBT Diagnostics-Part 2

2 Part 2 DiagnosticsMonitor Type Part 2 Qty IdentificationBPM-(SA) 3 LB-P4, LB-P5, LB-P6Flag-SA 3 LB-VF3, LB-VF4, LB-VF5FCT 1 LB-FT2ICT 1 LB-IT2

9 BROOKHAVEN SCIENCE ASSOCIATES

BPM Supported in LINAC

LIN-P1

LIN-P2

LIN-P3

LIN-P4

LIN-P5

LINAC BPM

10 BROOKHAVEN SCIENCE ASSOCIATES

LA BPM Assembly 11-12-11

SA BPM Assembly 11-12-11

LA BPM Chamber- populated w/Button Feed-thru Assembly (11-12-11)

TL Button/Feed-thru assembly 11-15-11

Pre-Installation Work (LBT-BPM Chamber/PUE)

Fixture using single wire test

40mm x 90mmElliptical

11 BROOKHAVEN SCIENCE ASSOCIATES

Pre-Installation Work (Testing Energy Slit/ Flags)

Test Rack used for Diagnostics Electronics and Controls. Test Stand using SP-1005 Girder top for SA Flag testing (11-23-11)

Energy Slit & LA Flag mounted on Production Version SP-1006 Girder, captured in portable clean room (11-4-11)

12 BROOKHAVEN SCIENCE ASSOCIATES

Pre-Installation Work (FCT/ICT)

In-Flange Bergoz FCT- Cleaned and prepared for install.FCT-CF6”3/4-96.0-UHV-20:1-H

FCT-Test Fixture for Pre test prior to install

In-Flange Bergoz ICT – Cleaned and prepared for install.ICT-CF6”-60.4-UHV-070-20:1-H

Beam Charge Monitor ChassisBCM-IHR Module

13 BROOKHAVEN SCIENCE ASSOCIATES

Tunnel Installation Work (LBT Part 1 & 2)

LBT Girder Install Part 1(11-7-11)

LBT Component Install Part 1(1-4-12)

LBT Part 2 Diagnostics Cables Pulled (12-6-11)

LBT Part 2 (11-30-11)

14 BROOKHAVEN SCIENCE ASSOCIATES

Cable Description / Specification

LMR-240FR – Low Loss Coax Cable (RF BPM / ICT) Attenuation (db/ft) .057db @500Mhz Jacket Diameter .240” Custom trim to relative timing specification of +/-25pS, with a delta phase specification of 4.5 degrees @

500Mhz.

LMR-400FR – Low Loss Coax Cable (RF BPM / FC) Attenuation (db/ft) .028db @500Mhz Jacket Diameter .400”

LMR-900FR – Low Loss Coax Cable (FCT) Attenuation (db/ft) .014db @500Mhz Jacket Diameter .900”

SIO2 – Silicon Dioxide Low Loss Coax Cable (RF BPM) Attenuation (db/ft) .06db @500Mhz Jacket Diameter .141” Semi-Rigged, fired glass hermetically sealed assembly Commercially fabricated as a straight length and a relative timing specification of +/- 25ps, with a delta

phase specification of 4.5 degrees @ 500Mhz

15 BROOKHAVEN SCIENCE ASSOCIATES

BPM Cable Work

LMR-240FR Cable install (11-8-11)

Pneumatic Crimp tool

Mobile Cart for Cable Time / Terminate (1-10-12)

SIO2 Cable Assembly (1Meter)

16 BROOKHAVEN SCIENCE ASSOCIATES

BPM / PUE / PTC Module Installation

LINAC PTC Module Install (11-8-11)

Patch Panel Interface to PTC for LINAC

LBT-P1 BPM SA Chamber Assembly at SP-1002 Girder w/SIO2 Cables Installed 1-20-12

LIN-P5 BPM PUE Assembly w/LMR-240FR Cables (1-15-12)

17 BROOKHAVEN SCIENCE ASSOCIATES

LBT Flags Installation

SA Flag Assembly at SP-1005 Girder

LA Flag Assembly at SP-1006 Girder

Tunnel patch panels for flag Pneumatics / PLC / Controls

Tunnel patch for Energy Slit / Flag at SP-1006

18 BROOKHAVEN SCIENCE ASSOCIATES

LBT Beam Dump / Faraday Cup Install

Dump 1 at SP-3000 Girder (1-20-12)

Dump 2 at SP-4000 Girder (1-20-12)

19 BROOKHAVEN SCIENCE ASSOCIATES

LBT Electronics Rack Layout

cPCI CPU board

cPCI Acqiris digitizer

20 BROOKHAVEN SCIENCE ASSOCIATES

PLC Controls for Flags (Rear View)

Cable Route into Rack Penetrations (Top View)

BPM receiver LINAC (Front View)

Diagnostics Electronics / Cable Management (RG-Q)

Custom patch Panel /SR for LMR Cables (Top View)

21 BROOKHAVEN SCIENCE ASSOCIATES

Injector Diagnostics Installation Schedule

22 BROOKHAVEN SCIENCE ASSOCIATES

Implemented Resources loaded Work Plan Diagnostics Component Tunnel Installation - Complete Diagnostics Cable pull, Time, Termination - Complete Diagnostics Electronics Install in Rack RG-Q1,2,3,4 - Complete Post installation Diagnostics Sub-System Functional testing - Complete System testing in progress, expected to be complete 2-13-2012

Summary / Status