1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012

Transcript of 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics &...

Page 1: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

1 BROOKHAVEN SCIENCE ASSOCIATES

LBT Diagnostics Installation Update

Dan PadrazoDiagnostics & Instrumentation Group

Feb 1, 2012

Page 2: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

2 BROOKHAVEN SCIENCE ASSOCIATES

Acknowledgements

Om Singh Timur ShaftanIgor Pinayev Kurt VetterBernie Kosciuk Yong HuRay Fliller Sergei SeletskiyDick Hseuh Tony CaracappaMike Johanson

Page 3: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

3 BROOKHAVEN SCIENCE ASSOCIATES

Overview

Diagnostics Technical Support for Installation Diagnostics for Linac To Booster Transport Line Integration Model of LBT. Illustration of LBT Diagnostics Part 1 & 2. Illustration of LINAC BPM / PUE. Installation of LBT Diagnostics Part 1 Integration of LBT Diagnostics Part 1 Electronics, Racks, Controls Interface Injector Diagnostics Installation Schedule Summary / Status

Page 4: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

4 BROOKHAVEN SCIENCE ASSOCIATES

Diagnostics Technical Support for LBT Installation

Group Leader – Om Singh

Project Engineer – Dan Padrazo

Project Engineer- Bernie Kosciuk

Engineer – Bel Bacha

Engineer – Tony Caracappa

AP – Igor Pinayev

AP - Sergei Seletskiy

Technical Supervisor- Wayne Rambo

Technical Support – Jack Tallent, Chris Danneil,

Marshall Maggipinto, Artie Munoz, Al Borelli,

Dennis Poshka,George Stenby(MOU),

Dave Tupper(JS), Bill Brannigan(JS)

Page 5: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

5 BROOKHAVEN SCIENCE ASSOCIATES

Diagnostics Supported for (LBT / LINAC) Monitor Type Total

QTYPart-1QTY

Part-2 QTY

Resolution Measured Beam Parameter

FCT 2 1 1 .6pC/bunch Fill Pattern, Bunch Charge

ICT 2 1 1 .6pC/train Injected Bunch Charge, Efficiency

BPM-(LA) 1 1 30µ Beam Position

BPM-(SA) 5 2 3 30µ Beam Position

Energy Slit 1 1 Beam Energy Spread

Flag- LA-(40mm x 90mm) 2 2 OTR-50µYAG- 30µ

Energy Spread, Beam Size, Position

Flag-SA-(40mm) 7 5 2 OTR-50µYAG- 30µ

Beam Size, Position

Faraday Cup 2 2 .05-22nC Gross Charge per Train(0-150 Bunches)

BPM – (LINAC) 5 Beam Position

Page 6: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

6 BROOKHAVEN SCIENCE ASSOCIATES

Integration Model LBT Part 1 & 2

LBTL-Part 1

LBTL-Part 2

Page 7: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

7 BROOKHAVEN SCIENCE ASSOCIATES

2 Part 1 DiagnosticsMonitor Type Part 1 Qty IdentificationBPM-(SA) 2 LB-P1, LB-P3BPM-(LA) 1 LB-P2,Flag-SA 5 LB-VF1, LB-VF1BD1, LB-VF2BD1, LB-VF3BD1, LB-VF3Flag-LA 2 LB-VF2, LB-VF1BD2FCT 1 LB-FT1ICT 1 LB-IT1Energy Slit 1 LB-SL1Faraday Cup 2 LB-FC1BD1, LB-FC2BD2

Illustration LBT Diagnostics-Part 1

Page 8: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

8 BROOKHAVEN SCIENCE ASSOCIATES

Illustration LBT Diagnostics-Part 2

2 Part 2 DiagnosticsMonitor Type Part 2 Qty IdentificationBPM-(SA) 3 LB-P4, LB-P5, LB-P6Flag-SA 3 LB-VF3, LB-VF4, LB-VF5FCT 1 LB-FT2ICT 1 LB-IT2

Page 9: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

9 BROOKHAVEN SCIENCE ASSOCIATES

BPM Supported in LINAC

LIN-P1

LIN-P2

LIN-P3

LIN-P4

LIN-P5

LINAC BPM

Page 10: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

10 BROOKHAVEN SCIENCE ASSOCIATES

LA BPM Assembly 11-12-11

SA BPM Assembly 11-12-11

LA BPM Chamber- populated w/Button Feed-thru Assembly (11-12-11)

TL Button/Feed-thru assembly 11-15-11

Pre-Installation Work (LBT-BPM Chamber/PUE)

Fixture using single wire test

40mm x 90mmElliptical

Page 11: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

11 BROOKHAVEN SCIENCE ASSOCIATES

Pre-Installation Work (Testing Energy Slit/ Flags)

Test Rack used for Diagnostics Electronics and Controls. Test Stand using SP-1005 Girder top for SA Flag testing (11-23-11)

Energy Slit & LA Flag mounted on Production Version SP-1006 Girder, captured in portable clean room (11-4-11)

Page 12: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

12 BROOKHAVEN SCIENCE ASSOCIATES

Pre-Installation Work (FCT/ICT)

In-Flange Bergoz FCT- Cleaned and prepared for install.FCT-CF6”3/4-96.0-UHV-20:1-H

FCT-Test Fixture for Pre test prior to install

In-Flange Bergoz ICT – Cleaned and prepared for install.ICT-CF6”-60.4-UHV-070-20:1-H

Beam Charge Monitor ChassisBCM-IHR Module

Page 13: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

13 BROOKHAVEN SCIENCE ASSOCIATES

Tunnel Installation Work (LBT Part 1 & 2)

LBT Girder Install Part 1(11-7-11)

LBT Component Install Part 1(1-4-12)

LBT Part 2 Diagnostics Cables Pulled (12-6-11)

LBT Part 2 (11-30-11)

Page 14: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

14 BROOKHAVEN SCIENCE ASSOCIATES

Cable Description / Specification

LMR-240FR – Low Loss Coax Cable (RF BPM / ICT) Attenuation (db/ft) .057db @500Mhz Jacket Diameter .240” Custom trim to relative timing specification of +/-25pS, with a delta phase specification of 4.5 degrees @

500Mhz.

LMR-400FR – Low Loss Coax Cable (RF BPM / FC) Attenuation (db/ft) .028db @500Mhz Jacket Diameter .400”

LMR-900FR – Low Loss Coax Cable (FCT) Attenuation (db/ft) .014db @500Mhz Jacket Diameter .900”

SIO2 – Silicon Dioxide Low Loss Coax Cable (RF BPM) Attenuation (db/ft) .06db @500Mhz Jacket Diameter .141” Semi-Rigged, fired glass hermetically sealed assembly Commercially fabricated as a straight length and a relative timing specification of +/- 25ps, with a delta

phase specification of 4.5 degrees @ 500Mhz

Page 15: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

15 BROOKHAVEN SCIENCE ASSOCIATES

BPM Cable Work

LMR-240FR Cable install (11-8-11)

Pneumatic Crimp tool

Mobile Cart for Cable Time / Terminate (1-10-12)

SIO2 Cable Assembly (1Meter)

Page 16: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

16 BROOKHAVEN SCIENCE ASSOCIATES

BPM / PUE / PTC Module Installation

LINAC PTC Module Install (11-8-11)

Patch Panel Interface to PTC for LINAC

LBT-P1 BPM SA Chamber Assembly at SP-1002 Girder w/SIO2 Cables Installed 1-20-12

LIN-P5 BPM PUE Assembly w/LMR-240FR Cables (1-15-12)

Page 17: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

17 BROOKHAVEN SCIENCE ASSOCIATES

LBT Flags Installation

SA Flag Assembly at SP-1005 Girder

LA Flag Assembly at SP-1006 Girder

Tunnel patch panels for flag Pneumatics / PLC / Controls

Tunnel patch for Energy Slit / Flag at SP-1006

Page 18: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

18 BROOKHAVEN SCIENCE ASSOCIATES

LBT Beam Dump / Faraday Cup Install

Dump 1 at SP-3000 Girder (1-20-12)

Dump 2 at SP-4000 Girder (1-20-12)

Page 19: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

19 BROOKHAVEN SCIENCE ASSOCIATES

LBT Electronics Rack Layout

cPCI CPU board

cPCI Acqiris digitizer

Page 20: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

20 BROOKHAVEN SCIENCE ASSOCIATES

PLC Controls for Flags (Rear View)

Cable Route into Rack Penetrations (Top View)

BPM receiver LINAC (Front View)

Diagnostics Electronics / Cable Management (RG-Q)

Custom patch Panel /SR for LMR Cables (Top View)

Page 21: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

21 BROOKHAVEN SCIENCE ASSOCIATES

Injector Diagnostics Installation Schedule

Page 22: 1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.

22 BROOKHAVEN SCIENCE ASSOCIATES

Implemented Resources loaded Work Plan Diagnostics Component Tunnel Installation - Complete Diagnostics Cable pull, Time, Termination - Complete Diagnostics Electronics Install in Rack RG-Q1,2,3,4 - Complete Post installation Diagnostics Sub-System Functional testing - Complete System testing in progress, expected to be complete 2-13-2012

Summary / Status