DEVELOPMENT OF THE GAS DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MARKET IN SERBIA AND
MONTENEGROMONTENEGRO
Athens, November 2005
22
BASIC ACTIVITIES OF NISBASIC ACTIVITIES OF NIS – – PETROLEUM INDUSTRY OF SERBIAPETROLEUM INDUSTRY OF SERBIA
EXPLORATION AND PRODUCTIONEXPLORATION AND PRODUCTION
NATURAL GAS AND LPG TRANSPORT, NATURAL GAS AND LPG TRANSPORT, DISTIBUTION AND MARKETINGDISTIBUTION AND MARKETING
REFINERY PROCESSINGREFINERY PROCESSING
MARKETING AND TRADEMARKETING AND TRADE
ENGINEERING SERVICESENGINEERING SERVICES
RELATED ACTIVITIES (NON CORE)RELATED ACTIVITIES (NON CORE)
33
BOARD OF DIRECTORS
NIS-PETROLEUM INDUSTRY OF SERBIA
BOARD OF DIRECTORS
GENERAL DIRECTOR
SUPERVISORY BOARD
EXECUTIVE BOARD-General director-Deputy general director- Assistant general director- Directors of operative divisions
NIS-NAFTAGAS NOVI SAD
NIS-GAS NOVI SAD
NIS-ENERGOGAS BEOGRAD
NIS-RNP PANCEVO
NIS-RNS NOVI SAD
NIS-RNB BEOGRAD
NIS-FAM KRUSEVAC
NIS-JUGOPETROL BEOGRAD
NIS-NAP NOVI SAD
NIS-ENGINEERING NOVI SAD
44
NIS-GAS NOVI SAD
NIS-ENERGOGAS BEOGRAD
JP SRBIJAGASINVOLVED IN FOLLOWING ACTIVITIES CONNECTED TO NATURAL GAS:
TRANSPORTATION, TRANSPORTATION,
DISTRIBUTION, DISTRIBUTION,
STORAGE STORAGE , ,
SYSTEM OPERATING, SYSTEM OPERATING,
TRADINGTRADING
55
PIPELINE SYSTEM OF SERBIA
SRBIJAGAS - GAS - Energogas
YugoROS gas
•Max. capacity Max. capacity 6.100 mil. m3 per 6.100 mil. m3 per yearyear•Maximum working pressure 50 Maximum working pressure 50 barbar
•Total length of high-pressure Total length of high-pressure pipeline pipeline is 2135 km is 2135 km
•Dimensions range from DN 150 Dimensions range from DN 150 to to DN 750 DN 750
•Average age of pipeline: 25 yearAverage age of pipeline: 25 year
•533 metering and regulating 533 metering and regulating stations stations from 100 to 100.000 Sm3/hfrom 100 to 100.000 Sm3/h
MAIN FEATURES MAIN FEATURES OF PIPELINE OF PIPELINE
SYSTEMSYSTEM
66
THE CONSUMPTION OF THE CONSUMPTION OF NATURAL GAS IN SERBIA NATURAL GAS IN SERBIA DURINGDURING THE THE
PERIOD 1989-2004PERIOD 1989-2004
0500
1.0001.5002.0002.5003.0003.500
YearNat
ural
gas
con
sum
ptio
n ex
pres
sed
in m
ilion
Cu.
m.
77
The Heating Plant and Household share The Heating Plant and Household share in yearly gas consumption in Serbiain yearly gas consumption in Serbia
38%
62%
Heating Plant &Hoseholds Industry
88
NATURAL GAS DEMAND FORECAST FOR NATURAL GAS DEMAND FORECAST FOR THE PERIOD 2000-2010THE PERIOD 2000-2010
0
500
1000
1500
2000
2500
3000
3500
4000
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
Year
Natu
ral g
as c
on
su
pti
on
exp
ressed
in
milio
n C
u.m
.
Other
Power plants (for theproduction of electricity )
Schools, Hospitals,medications
Households, generalconsumption
District heating
I ndustry, Consumptionfor raw materials
I ndustry, Consumptionfor energy
99
GAS PIPELINE SYSTEM DEVELOPMENT GAS PIPELINE SYSTEM DEVELOPMENT PLAN UNTIL 2010.PLAN UNTIL 2010.
CONSTRUCTION OF HIGH PRESSURE CONSTRUCTION OF HIGH PRESSURE PIPELINESPIPELINES
UNDERGROUND GAS STORAGE UNDERGROUND GAS STORAGE “BANATSKI DVOR”“BANATSKI DVOR”
DISTRIBUTION NETWORKSDISTRIBUTION NETWORKS
REHABILITATION AND UPGRADING OF REHABILITATION AND UPGRADING OF EXISTING PIPELINE SYSTEMEXISTING PIPELINE SYSTEM
1010
PLANNED HIGH PRESSURE PLANNED HIGH PRESSURE PIPELINES IN NORTHERN PIPELINES IN NORTHERN
PART OF SERBIAPART OF SERBIA
ESTIMATED COST OF ESTIMATED COST OF INVESTMENT EUR 82 mil.INVESTMENT EUR 82 mil.
No.No. DNDN LengthLength Inch mInch m
1.1. 3030”” 30 km30 km 900,000900,000
2.2. 2424”” 170 km170 km 4,000,0004,000,000
3.3. 20”20” 70 km70 km 1,400,0001,400,000
4.4. 1212”” 27 km27 km 324,000324,000
5.5. 1010”” 84 km84 km 840,000840,000
6.6. 8 8 55//88”” 37 km37 km 319,000319,000
7.7. 6 6 55//88” ” 40 km40 km 265,000265,000
8.8. 4 ½”4 ½” 12 km12 km 54,00054,000
TotalTotal 470 km470 km 8 182,0008 182,000
PIPELINE SYSTEM OF SERBIA
Planned pipelines in Northern part of Serbia
1111
Ref Ref no.no.
DNDN LengthLength Inch mInch m
1.1. 28”28” 248 km248 km 6 944 0006 944 000
2.2. 20”20” 70 km70 km 1 400 0001 400 000
3.3. 1818 88 km88 km 1 584 0001 584 000
4.4. 14”14” 216 km216 km 3 024 0003 024 000
5.5. 12”12” 68 km68 km 816 000816 000
6.6. 10”10” 62 km62 km 620 000620 000
TotalTotal 752 km752 km 14 388 14 388 000000
PLANNED PLANNED HIGH PRESSURE HIGH PRESSURE PIPELINES IN CENTRAL PIPELINES IN CENTRAL
AND SOUTHERN PART OF AND SOUTHERN PART OF SERBIASERBIA
ESTIMATED COST OF ESTIMATED COST OF
INVESTMENT EUR 140 mil.INVESTMENT EUR 140 mil.
PIPELINE SYSTEM OF SERBIA
Planned pipelines in Central and Southern part of Serbia
1212
Ref Ref no.no.
DNDN LengthLength Inch mInch m
1.1. 1616”” 221515kmkm 3,440,003,440,0000
2.2. 110”0”210210 km km 2,100,002,100,00
00
TotalTotal 425425 km km 5,540,005,540,0000
PLANED PLANED HIGH PRESSURE HIGH PRESSURE PIPELINES PIPELINES FOR AND IN FOR AND IN
MONTENEGROMONTENEGRO
ESTIMATED COST OF ESTIMATED COST OF INVESTMENT EUR 55 mil.INVESTMENT EUR 55 mil.
PIPELINE SYSTEM OF SERBIA
Planned pipelines in Montenegro
1313
BASIC PARAMETERS FOR BASIC PARAMETERS FOR UNDERGROUND GAS STORAGE UNDERGROUND GAS STORAGE
CONSTRUCTIONCONSTRUCTION
GAS CONSUMPTION IN 1997, 2.6 billion mGAS CONSUMPTION IN 1997, 2.6 billion m33
ESTIMATED GAS CONSUMPTION UNTIL 2010,ESTIMATED GAS CONSUMPTION UNTIL 2010, 3.3 billion m3.3 billion m33
DOMESTIC GAS PRODUCTION DOMESTIC GAS PRODUCTION 300300 million m million m33
DOMINANT IMPORTATION OF RUSSIAN GAS UNTIL DOMINANT IMPORTATION OF RUSSIAN GAS UNTIL 20102010
UNEVEN GAS CONSUMPTION DYNAMICSUNEVEN GAS CONSUMPTION DYNAMICS
EVEN GAS IMPORTATION DYNAMICSEVEN GAS IMPORTATION DYNAMICS
REQUIRED GAS STORAGE FOR 25-30% OF YEARLY REQUIRED GAS STORAGE FOR 25-30% OF YEARLY CONSUMPTIONCONSUMPTION
1414
PIPELINE SYSTEM OF SERBIA
SRBIJAGAS - Gas - Energogas
- Yugorosgas
- Gas Storage
LOCATION , AND TECHNICAL LOCATION , AND TECHNICAL FETURES OF UNDERGROUND FETURES OF UNDERGROUND
GAS STORAGEGAS STORAGE
• CAPACITY :CAPACITY :
• MAX 800 million MAX 800 million m3m3
• I phase 300 I phase 300 million million m3m3
• INJECTION CAPACITY:INJECTION CAPACITY:
• max. 7 million m3/daymax. 7 million m3/day
• min. 1.3 million m3/daymin. 1.3 million m3/day
• PRODUCTION CAPACITY: PRODUCTION CAPACITY:
• max. 10 million m3/day max. 10 million m3/day
• min. 1.6 million m3/daymin. 1.6 million m3/day
• WELL PRODUCTIVITY: WELL PRODUCTIVITY:
• max. 0,55 million m3/daymax. 0,55 million m3/day
• min. 0,3 million m3/daymin. 0,3 million m3/day
1515
PROJECT INVESTMENTSPROJECT INVESTMENTS
REQUIRED INVESTMENT 128 million EURREQUIRED INVESTMENT 128 million EUR
EQUIPMENT AND WORKS 65 million EUREQUIPMENT AND WORKS 65 million EUR
CUSHION GAS 63 million EURCUSHION GAS 63 million EUR
GAS STORAGE IS PLANED TO BE CONSTRUCTED IN TWO GAS STORAGE IS PLANED TO BE CONSTRUCTED IN TWO PHASESPHASES
PHASE IPHASE I 2004./200 2004./20066. 50 million EUR. 50 million EUR
EQUIPMENT AND WORKS 7 million EUREQUIPMENT AND WORKS 7 million EUR
CUSHION GAS 43 million EURCUSHION GAS 43 million EUR
PHASE IIPHASE II STAGE 200 STAGE 20066.-20.-201111. 78 million EUR. 78 million EUR
1616
CONSTRUCTION OF MUNICIPAL CONSTRUCTION OF MUNICIPAL NATURAL GAS DISTRIBUTION NATURAL GAS DISTRIBUTION
NETWORKSNETWORKS
Distribution network compriseDistribution network comprise
steel pipelines diameter 2”-12” steel pipelines diameter 2”-12” - metering and - metering and regulation stations 300-30.000. Sm3/hregulation stations 300-30.000. Sm3/h
PE pipes diameter d40 - d225PE pipes diameter d40 - d225 - residential and - residential and commercial stations G-4 to G-25commercial stations G-4 to G-25
Municipal gas networks could be constructed in more Municipal gas networks could be constructed in more than 80 districts all over the Serbia. than 80 districts all over the Serbia.
The construction of the said municipal networks The construction of the said municipal networks would allow the connection of 650.000 households would allow the connection of 650.000 households
1717
FUNDS FOR MUNICIPAL NATURAL GAS FUNDS FOR MUNICIPAL NATURAL GAS DISTRIBUTION NETWORKSDISTRIBUTION NETWORKS
The construction of the municipal networks would be The construction of the municipal networks would be funded partly from J.P.”SRBIJAGAS” own assets, funded partly from J.P.”SRBIJAGAS” own assets, from credits, and partly by local municipalities and by from credits, and partly by local municipalities and by domestic and foreign qualified partners .domestic and foreign qualified partners .
The participation of foreign partner is expected in the The participation of foreign partner is expected in the realization of this project in technical and financial realization of this project in technical and financial terms.terms.
The construction of municipal networks is planned The construction of municipal networks is planned for the next ten years.for the next ten years.
The estimated value for the construction of municipal The estimated value for the construction of municipal gas distribution networks amounts to EUR 500.mil.gas distribution networks amounts to EUR 500.mil.
1818
REHABILITATION OF THE EXISTING REHABILITATION OF THE EXISTING GAS PIPELINE SYSTEMGAS PIPELINE SYSTEM
Goals: to provide reliable and safe gas transportation Goals: to provide reliable and safe gas transportation - Modernization of technological systems for:Modernization of technological systems for:
- Remote control and surveillanceRemote control and surveillance- Measurement of the delivered and received quantities of energyMeasurement of the delivered and received quantities of energy
- Inspection of pipeline with the modern pipeline inspection toolsInspection of pipeline with the modern pipeline inspection tools- Replacement of battered pipes and equipment on the pipelinesReplacement of battered pipes and equipment on the pipelines- Environmental protectionEnvironmental protection- Replacement of pipeline section for the purpose of increasing the Replacement of pipeline section for the purpose of increasing the
reliability of transportation.reliability of transportation.- Reconstruction of existing metering and regulation stations.Reconstruction of existing metering and regulation stations.
Estimated cost of the investment: EUR 30 milEstimated cost of the investment: EUR 30 mil
1919
RECAPITULATION OF INVESTMENTSRECAPITULATION OF INVESTMENTS
HIGH PRESSURE PIPELINES 277 million EURHIGH PRESSURE PIPELINES 277 million EUR
UNDERGROUND GAS STORAGE “BANATSKI UNDERGROUND GAS STORAGE “BANATSKI DVOR” 128 million EURDVOR” 128 million EUR
DISTRIBUTION NETWORKS 500 million EURDISTRIBUTION NETWORKS 500 million EUR
REHABILITATION AND UPGRADING OF REHABILITATION AND UPGRADING OF EXISTING PIPELINE SYSTEM 30 million EUREXISTING PIPELINE SYSTEM 30 million EUR
TOTAL 935 million EURTOTAL 935 million EUR
2020