09/12/2009 ALICE TOF General meeting 2
The Detector Control System (DCS) has to provide:
A full detector description and a direct access to devices (HV and LV power supplies, VME crates, electronics cards, …);
Finite State Machine (FSM) based mechanism to synchronize the state of the detector with the operation of the physics data acquisition system and with LHC state;
Online controls.
09/12/2009 ALICE TOF General meeting 3
Online controls means:
Continuously monitoring of important parameters as:• environmental parameters (Cavern temperature, pressure and
humidity, magnets current and voltage, …)• services (gas distribution, cooling water circulation, …)• detector operational parameters (HV and LV channels current,
readout status, …)
Archiving of most relevant parameter values (HV and LV channels current, boards temperature, …) to allow a further access to this information. At present 4520 parameters are being archived.
Alarm handling which provide a way to signal in real time any abnormal behavior with defined manual or automatic actions to be taken in order to recover it. More than 6480 alarms have been defined.
09/12/2009 ALICE TOF General meeting 4
Services:
• Gas Distribution system
• Cooling system
09/12/2009 ALICE TOF General meeting 5
Gas Distribution system
TOF total gas flow 40 l/h per SM
Ingoing and outgoing fluxes for each half of SM are monitored
At present the SMs are fluxed with an 93% C2H2F4 and 7% SF6 gas mixture
09/12/2009 ALICE TOF General meeting 6
Water temperature at the beginning of the cooling line
Water temperature at the end of the cooling line
Water Cooling system
Cooling water fluxes for Read-out and Front-end electronics
TOF startup on 25 September 2009
Day and time
14°C
15°C
16°C
17°C
09/12/2009 ALICE TOF General meeting 7
TOF Operational parameters:
• TOF temperature
• Front-end cards online monitor
• Full TOF dark current
09/12/2009 ALICE TOF General meeting 8
TOF Temperature
The temperature of the TOF is continuously monitored by means of 576 + 8064 = 8640 temperature sensors.
Average crate internal temperature ≈ 32°C
Average temperature in the SM electronic volume ≈ 17°C
09/12/2009 ALICE TOF General meeting 9
TOF Temperature
TOF turned off
The increase of L3 temperature due by the TOF is of the order of 0.6°C in a good agreement with the ALICE request.
09/12/2009 ALICE TOF General meeting 10
TOF Temperature
SuperModules
Side C
Side A
Electronic cards off because of power supply failures
A non uniformity has still to be completely understood.
09/12/2009 ALICE TOF General meeting 11
Front-end cards online monitor
The FEAC cards distribute the power supply and the threshold level to the FEAs and get back the OR signal of each couple of deasy-chained FEAs.
The main Front-end card parameters are read back by the Local Trigger Module (LTM). There are 1 LTM and 8 FEA Controller cards for each quarter of SM.
FEAController
x8
LTM
09/12/2009 ALICE TOF General meeting 12
Front-end cards online monitor
macro-pad (48 pads) single rate ≈ 33.6 Hz 0.08 Hz/cm2
FEAController
x8
LTM
09/12/2009 ALICE TOF General meeting 13
HV channels OFF, average current 1.7uA
Average current drawn by full TOF @ 13 kV is less than 1uA (1568 MRPCs in total less then 1nA per MRPC).
Full TOF Dark Current
HV channels @ 1kV (safe condition with unstable beams)
09/12/2009 ALICE TOF General meeting 14
Conclusions:
All the environmental parameters, services and detector operational parameters are continuously monitored.
Tools have been developed to signal in real time any dangerous or abnormal behavior and to automatically recover it.
From an hardware point of view the TOF detector looks working fine.
09/12/2009 ALICE TOF General meeting 15
RESERVE
09/12/2009 ALICE TOF General meeting 16
Water temperature at the beginning of the line
Water temperature at the end of the line 355 (l/min) * 1.5 kQ ≈ 2,23 MJ/min
47kW/sec ≈ 2.82 MJ/min
Water Cooling system
09/12/2009 ALICE TOF General meeting 17
09/12/2009 ALICE TOF General meeting 18
pp collisions