© 2012 Autodesk

“Clash of The Design Teams” using Autodesk BIM 360 Glue & RevitJason Jones Jason WaddellPES Structural Engineers The Beck GroupBIM Program Manager BIM Manager

© 2012 Autodesk

Class Summary

In this case study we will provide insight into a web based workflow where the entire design team took responsibility in identifying, reporting, and resolving clashes against their discipline’s major systems. The team utilized Autodesk BIM 360 Glue and Autodesk Revit to achieve continuous clash reporting throughout the design process. This effort was affective in mitigating the mountain of clashes that can occur at the end of CD’s had the process not been implemented early and on a consistent schedule with all design disciplines. We will identify lessons learned including both pros & cons experienced with this workflow.

© 2012 Autodesk

Learning Objectives

At the end of this class, you will be able to: Obtain design team buy-in for this proactive workflow Understand key strategies for project setup in both Autodesk Revit & BIM

360 Glue Implement a Model Coordination process that involves the entire design

team Understand the roundtrip workflow of creating Clash reports in Autodesk

BIM 360 Glue & resolving the clash in Autodesk Revit.

© 2012 Autodesk

Design Team Buy-in

© 2012 Autodesk

Design Team Buy-in

Design Fee

Licensing

Training

Process Map

© 2012 Autodesk

Project Set Up

© 2012 Autodesk

Project Set Up

• File Naming Conventions• Revit Project and Shared Coordinates• Autodesk BIM 360 Glue

© 2012 Autodesk

Revit Coordinate System• Project Internal Coordinate• Shared Coordinate or Survey Point• Relative Coordinate

State Plane Coordinate SystemNAD 83

© 2012 Autodesk

Project Set Up: File Naming

© 2012 Autodesk

Project Set Up: Coordinate System

© 2012 Autodesk

Model Coordination Process

© 2012 Autodesk

Model Coordination Process

© 2012 Autodesk

Model Coordination Process

Authoring Model

Autodesk Revit 2013

Upload Revit Model to BIM 360

Glue via add in

Perform Clash Detection in BIM

360 Glue

Send Notification to Specific Design Team Discipline

Resolve Clash in

Autodesk Revit 2013

© 2012 Autodesk

Model Coordination Process - REVIT

Coordinate System

Send Model

3D View Set Up

BIM 360 Glue Add In

© 2012 Autodesk

Model Coordination Process – BIM 360 GLUE

Merge Models

Transform Coordinate System

Visually Inspect Model

Perform Clash Detection

Send Notification

© 2012 Autodesk

Model Coordination Process - REVIT

BIM 360 Glue Add In

View Filters for Efficiency

Resolve Clash

Upload to BIM 360 Glue

© 2012 Autodesk

Workflow Demonstration

© 2012 Autodesk

Workflow Demonstration

Run a Clash Report in BIM 360 Glue

Send a Notification From BIM 360 Glue

© 2012 Autodesk

Workflow Demonstration

Utilize View Filters in Revit to Isolate Clashing Elements

Resolve the Clash

© 2012 Autodesk

• Team Buy-in• BIM Execution Plan• Proper Coordinate System• Transform Models in BIM 360 Glue• Team Communication• Revit Filters

Take Aways / Lessons Learned

© 2012 Autodesk

Autodesk, AutoCAD* [*if/when mentioned in the pertinent material, followed by an alphabetical list of all other trademarks mentioned in the material] are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. © 2012 Autodesk, Inc. All rights reserved.