100-109-166a_Structural
European Industry Forum for Accelerators with Superconducting RF Technology Michael Peiniger ACCEL and EIFast Coordination Board Member June 02, 2007.
ILC Status After the Technical Design Phase Presentation to SiD prepared by: Marc Ross (SLAC) October 14, 2013 1 SiD, M. Ross (SLAC)
Cavity Gradient for the R&D and ILC Operation
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto, 09-12-02.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
High Altitude Payload Design – A Mechanical Aspect
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Progress Report ILC 9-cell Cavity EP and Vertical Test at JLab
Fire Safety R equirements, Standardization and T esting Electrical & Electronic Equipment
SM18 Vertical/Horizontal Test Setup