Raising Startup Capital: Arie Abecassis/General Assembly
Future large scale accelerator projects for particle phys
Tech Cocktail_2012 startup accelerator report
Wir schaffen Wissen – heute für morgen Vienna, 08.05.2014 Paul Scherrer Institut Profile Measurements at Light Sources and FELs Volker Schlott.
SuperKEKB Construction Plan Kazunori AKAI KEK 7 Feb. 2011 Accelerator Review Committee.
4/18/2009TILC’09 Electron Cloud Studies at LBNL S. De Santis Center for Beam Physics.
European design study on Neutrinofacilities - Euronu within FP7.
Electron Cloud Studies at LBNL
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Towards GDI Report from ACFA and KEK Shin-ichi Kurokawa KEK, Japan ACFA LC Physics and Detector Workshop NTU, Taipei, November 9, 2004.