Model-Based Systems Engineering in an Integrated Environment Christi A. Gau Pagnanelli, Barbara J. Sheeley, Ronald S. Carson, PhD, INCOSE Fellow The Boeing.
CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.
1 Measurements & Validation R G Stamp Head of Department of ATM Research National Air Traffic Services Ltd, UK.
The Validation Planning Process The EUROCONTROL Validation Planning Process A brief presentation on the outcome of TRS139/04 Presentation Prepared by:
3) The third reason responsible for Collection 3 product anomalies is mismatch between model simulated and MODIS surface reflectances. This mismatch still.
NPP Calibration and Validation Rehearsals Janna H. Feeley NASA JPSS Ground Project Greenbelt, MD The Aerospace Corporation El Segundo, CA AMS 2012 Overview.
19Jun2013_v1 Quality Day Orange Empire ASQ – November 1, 2013 Larry Bartkus Validation & Sample Size Selection.
© 2014 SPEC Innovations and Teaching Science and Technology, Inc. All Rights Reserved Model-Based Reviews The Next Step in Model-Based Systems Engineering.
1 Software Quality Assurance Industry statistics for 1994 (WW. Gibb): –For every 6 systems that work, 2 are cancelled –It is worse for large systems: 3.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 20 Slide 1 Critical systems development.
Risk_Based Approach to Validation - TPPL 14 10 10
Irma Project Profile V 2.2