Construction of the ATLAS SCT Endcap Modules Steve Snow Manchester University On behalf of the ATLAS SCT Collaboration Context - ATLAS, Inner Detector,
0.13 m m Pixel Test Chip Results
1 Linac/400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11.
Linac /400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11
NA62 front end Layout in DM option Jan Kaplon/Pierre Jarron.
NA62 front end architecture and performance Jan Kaplon/Pierre Jarron.
ASIC Wafer Test System for the ATLAS Semiconductor Tracker Front-End Chip.