Ica 2013021816274759
Hybrid Genetic Algorithm with Multiparents Crossover for Job Shop Scheduling Problems
Off the peg or made to measure! Timetabling and scheduling with SA and TS. Kath Dowsland Gower Optimal Algorithms Ltd [email protected] (talk.
910s-2