Advanced machinery Troubleshooting
FFAG-ERIT R&D 06/11/06 Kota Okabe (Kyoto Univ.) for FFAG-DDS group.
LHC Upgrade Part 4: RF systems for the LHC upgrade
Damping Ring issues Overall optimization, low emittance tuning and other beam tests
Positron Source Relocation Damping Ring @ 10Hz S. Guiducci (INFN-LNF)
INTENSITY LIMITATIONS (Space Charge and Impedance)
Booster Low Level Modules, Timing and some Measurements.
Positron Source Relocation Damping Ring @ 10Hz S. Guiducci (INFN-LNF) BAW2, SLAC Tuesday 18 January 2011.
FFAG-ERIT R&D
Linac4 Drift Tube Linac LIU Day 2014
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Contents