ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
Outline
HV MUX motivation and principle HV MUX devices requirements Real time test system and test results
Silicon Strip Detectors for the ATLAS HL-LHC Upgrade
High Voltage Multiplexing for ATLAS Tracker Upgrade EG Villani on behalf of the ATLAS HV group STFC Rutherford Appleton Laboratory.
High Voltage MUX for ATLAS Tracker Upgrade EG Villani STFC RAL on behalf of the ATLAS HVMUX group TWEPP-14, 22 – 26 Sept. 2014.
High Voltage Multiplexing for ATLAS Tracker Upgrade EG Villani on behalf of the ATLAS HV group
ATLAS SLHC Strip Stave Electrical Results/Plans