Scandale I
16/17 december 2004 Tango-ds project Vue de Soleil le 1 er décembre 2004.
Vertex detector optimisation: status and strategies Introduction. Performance goals. Constraints due to machine and detector. Conceptual detector design.
IDM2004 G. Gerbier LSM - Fréjus underground sites status and projects Gilles Gerbier CEA/Saclay - LSM.
EW Physics at a SuperB Flavour Factory with Polarized Beam and status of some Flavour Physics with Taus J. Michael Roney University of Victoria III Prometeo.
Prajwal Mohanmurthy, Mississippi State University with Dr. Dipangkar Dutta, Mississippi State University Medium Energy Physics Group Spin-Light Polarimeter.
3/5/20121 Lattice modeling for a storage ring with magnetic field data X. Huang, J. Safranek (SLAC) Y. Li (BNL) 3/5/2012 FLS2012, Ring WG, X. Huang.
Muon Campus Beam Transport January 23, 2013 J. Morgan 1.
E.C. Aschenauer arXiv: 1212.1701 & 1108.1713. E.C. Aschenauer EIC User Meeting 2014 2 Requirements from Physics: High Luminosity ~ 10 33 cm -2 s -1.
Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
ESRF Operation Status Report & Accelerator Upgrade Programme P. Raimondi On behalf of the Accelerator & Source Division Grenoble, November 25 - 2014.