1 Rail_test_system.pptx Aug 12, 2010 version. 2 TPC – Time Projection Chamber (main detector in STAR) HFT – Heavy Flavor Tracker SSD – Silicon Strip Detector.
1 DIMENSIONING AND TOLERANCING. 2 prismatic.sldasm.
ES1050 – Introductory Engineering Design and Innovation Studio 1 Computer Aided Design (CAD) Part 6 Prof. Paul Kurowski.
Notes on beam pipe collars and support brackets for MSC 2012-07-05 Silber.
HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1.
1 Link A component forming a part of a chain; generally rigid with provision at each end for connection to two other links Mechanism A combination of rigid.
Piston Exercise Objectives: The purpose of this exercise it to make the user familiar with the process for manually defining constraints on assemblies.