Introduction to CLIC and breakdown in rf structures W. Wuensch Breakdown physics workshop 6-5-2010.
L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures.
Structure Preparation Techniques and New Materials DC breakdown testing –Test of new materials –Test of in situ and ex-situ heating, plasma treatments,
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Status of X-band program at RadiaBeam Luigi Faillace RadiaBeam Technologies, LLC. Santa Monica, CA 5th Collaboration Meeting on X-band Accelerator Structure.
Fifth International Linear Collider SchoolW. Wuensch 30 October 2010 Room Temperature rf High Gradients: Physics, rf design and Technology When Maxwell’s.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE
OUTLINE Two beam acceleration feasibility issue
Beam characteristics
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.