Fiplex Engineering Services - Coverage Extension
Fiplex Engineering Services
Dayle Kotturi LCLS Diagnostics and Commissioning Workshop [email protected] September 23, 2004 LCLS Controls and Data Acquisition September 23, 2004.
A_RD_03 R/D for the High Power Couplers for ILC
1 E. KAKO (KEK) 2012' May 28 FJPPL'2012 @ Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF 30 GHz power production 12 GHz power production.
RF Power production at CTF3
Coupler Multipactor Studies F. Wang, B. Rusnak, C. Adolphsen, C. Nantista, G. Bowden, Lixin Ge.
Drift Tube Linac Andrea Pisent INFN Italy April 21, 2015.
Recent developments for the LCLS injector Feng Zhou SLAC Other contributors: Brachmann, Decker, Ding, Emma, Gilevich, Huang, Iverson, Loos, Raubenheimer,
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
SPS 800 MHz RF Power upgrade