1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation)