BCM 503BUILDING SERVICES ENGINEERING I
HH H OUSTON H OUSTON F IRE F IRE D EPARTMENT P UMP P UMP O PERATOR O PERATOR P ROGRAM VAL JAHNKE FIRE TRAINING FACILITY.
Initial Engine Company Operations. – Command Post location Move away from the pump panel once command is transferred from the Engineer to an Officer –
Skone Irrigation Slide Show created 7.25.11
Pump theory
Tandem Pumping Video. INITIAL SIZE-UP When approaching the structure note the location of the FDC, Hydrant and Building Access.
Intermediate SFFMA Objectives: 24-02.01 – 24-02.11 8Hrs received.
Scene Safety – Apparatus Positioning at Roadway Incidents Procedure: –4.1 Safety Premises 4.1.1 Emergency personnel are at great risk while operating.
TRAINING DIVISION
ET - 277 - 1,000 Gallons of Water- 1250 GPM Pump.
Tandem Pumping
Pumper Operations n Why do we need to be concerned about being good pump operators? n When we are good pump operators the personnel working the hand lines.