LHC Upgrade Kai Hock. 1.The LHC 2.Motivation and Activities 3.The Science Case 4.Technical Issues and Challenges 5.Opportunities for us 6.Scale of project.
Booster and PS LIU workunits EPC Project Meeting 06-09-2011 Serge Pittet TEEPC.
LHC Baseline = BCMS 25ns S. Hancock. Background 2 For given LHC optics and energy, luminosity scales roughly as the product of the beam brightness in.
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Design Study High Luminosity LHC (HL-LHC) Collaborative Project FP7-INFRASTRUCTURE-2010 By Lucio Rossi – CERN 1st Meeting @ CERN 20 July.
SPS LS1 Planning meeting (N09) 13/03/13 David Mcfarlane [email protected].
Evolution of nuclear shape in the light Radon isotopes Andrew Robinson, David Jenkins, Stewart Martin-Haugh University of York Jarno Van De Walle CERN.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
E. Benedetto, 29/04/14, OP Shutdown Lecture, Res. Compensation in the PSB Resonance compensation in the PS Booster (1 st part) E. Benedetto + M. McAteer.
Final Review Meeting, 22-26 September 20141 * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
THE LHC INJECTORS UPGRADE (“LIU”) PROJECT
Laser Stripping and H 0 monitor systems 10/18/2011B.Cheymol, E. Bravin, U. Raich, F. Roncarolo BE/BI1.