Proton spin structure from longitudinally polarized pp collisions from PHENIXat RHIC Alexander Bazilevsky BNL The 6 th Circum-Pan-Pacific Symposium on.
MALDI
Reaksi Redoks
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
May 06, 2013 Photo by Greg Vogel. Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding.
13-Jan-07 RHIC II Upgrade and Science Program QCD Town Meeting Rutgers, NJ W.A. Zajc Columbia University.
MCTF Steve Geer SLAC/LBNL November, 2009 1 Muon Colliders
Results of the FY2012 Scientist Survey compiled November 2011 presented by Peter H. Garbincius February 6, 2012 for the rest of the team: Dean Hoffer,
Acid-Base and Donor-Acceptor Chemistry
Muon Colliders
Recent Studies on the PRISM FFAG Ring
Parametrisation of PRISM Ring and Design Options J. Pasternak Imperial College London/RAL STFC