03100_QT-09-2008_CONCRETE
REPLACING EAST SIDE OF BRIDGE in 2009. WEST Section Sank in 1979 Storm REBUILT and Opened in 1982 EAST Section REBUILDING Shown here 2004-2009 HOOD CANAL.
Pouring concrete is a difficult thing to do correctly. It must have the correct heat distribution to dry. This allows the water to bleed out at the correct.
Site Inspection Report at Construction School
Courage is What Counts - The Story of Hall Contracting Corporation