S. Lisgo 1, G. Counsell 2, A. Darke 1, G. De. Temmerman 1, J. Huang 3, G. Maddison 1 1 UKAEA 2 F4E 3 ASIPP MAST Activities for 2008-2009 EU-PWI SEWG: FUEL.
Discharge initiation and plasma column formation in aspect ratio A=2 tokamak. R.R. Khayrutdinov 1 E.A. Azizov 1, A.D. Barkalov 1, G.G.Gladush 1, I.L.Tajibaeva.
AT Pilot Plant EM and Structural Studies P. Titus.
Assembly and Installation Information Day – 21 st May 2015 © 2015, ITER Organization Page 1IDM UID: XXXXXX Keynotes on Assembly and Installation of ITER.
September 26-29, 2005 Knoxville. Tennessee USA Progress and Plan of the PROTO-SPHERA Program Outline of the Talk 1)Introduction to PROTO-SPHERA 2)The PROTO-PINCH.
IEA IA PolDiv ExCo-Meeting, Cadarache 28 June 20061 AUG Physics Program to prepare / in parallel to ITER Aim is to establish the physics base for ITER.
CONTENT
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept. 14-16, 2004 1 EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
Status of US ITER Neutronics Activities Outline Examples of US activities during EDA US ITER neutronics activities in the past year Possible future.
WBS 3 - Diagnostics
HT-7
Analysis of Technical and Programmatic Tradeoffs with Systems Code