Institut für Angewandte Physik LINAC AG Max school, October 2nd 2013 1 Florian Dziuba Status of the sc cw LINAC Demonstrator Florian Dziuba Institut für.
FP420 Low and high voltage supply
Block 4 vertical test facility: status and perspectives
EVLA Receiver Issues EVLA Advisory Committee Meeting, March 19-20, 2009 Robert Hayward - Systems Engineer for EVLA Front-Ends Gordon Coutts- Microwave.
Status and prospective of cryogenics for cold-powering systems at LHC P7, P1 and P5