TR6850 TR-6850 256 33MHz,8M pattern 16 / Visual Studio.NET C++
A NEW TIMING CALIBRATION METHOD FOR SWITCHED CAPACITOR ARRAY CHIPS TO ACHIEVE SUB-PICOSECOND RESOLUTIONS 13 March 2014Workshop on Picosecond Photon Sensors,
GEANT4 simulations for the Lund R 3 B prototype Douglas Di Julio Lund University, Lund, Sweden.
An Overview of North American R&D in Gaseous Tracking Detectors for the LC
LC TPC R&D Results May 20031 Selected LC TPC R&D Results for the DESY RPC Meeting 2003 May 07 The LC TPC R&D Groups of the PRC R&D-01/03 Proposal Carleton,
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Abraham Gallas V Jornadas sobre la participación española en futuros aceleradores lineales Timepix Pixel Sensors Tracking & Timestamping for ILC.
Abraham Gallas