Chap009 Ma
Chap009 7e edited
15-27 August 2005ILC Snowmass Workshop – Chris Damerell 1 Vertex Detectors – How to Overcome Electromagnetic Interference Chris Damerell Rutherford Appleton.
Vertex detector optimisation: status and strategies Introduction. Performance goals. Constraints due to machine and detector. Conceptual detector design.
January 9 2004US LC Workshop SLAC – Chris Damerell 1 Strategies for pickup and noise suppression with different vertex detector technologies Chris Damerell.
Proteus Product Demo. Customers Overview Proteus is an enterprise level suite of software for Enterprise Asset Management with both MSSQL and Oracle.
ATLAS Pixel Detector Upgrade: IBL – Insertable B-Layer Tobias Flick University Wuppertal 17.09.2009, VERTEX 2009 Putten, Netherlands Preliminary.
LHCC – ATLAS IBL G. Darbo - INFN / Genova LHCC, 16 February 2009 o ATLAS Insertable B-Layer (IBL) LHCC Upgrade Review CERN, February 16, 2009 G. Darbo.
Slide Development Of A Laser Driver Chip Test Set‑Up For Slhc Experiments
1 DESY Zeuthen - Technical seminar - 23.10.2012 ALICE ITS Upgrade Project and Contribution of NPI in Řež Jozef Ferencei Nuclear Physics Institute Czech.
THE VACUUM BOX FOR COMPASS CRYOSTAT MUNICH 23/10/2007 G. GIRAUDO I.N.F.N. TORINO 1.MECHANICS – OVERWIEV 2.WINDOWS 3.INTEGRATION WITH HODOSCOPE.
Status report on A 2D position sensitive microstrip sensor with charge division. A segmented Low Gain Avalanche Detector for tracking E. Currás, M. Fernández,