LHC Status and CERNs future plans Lyn Evans. L. Evans – EDMS document no. 859415 2 Machine layout.
Beamline Overview Collaboration Meeting 16 June 2014 Ken Moffeit 1:30pm - 3:00pmBeamline overview (15’+5’)Ken Moffeit Status of the beamline construction.
Using Cyber-Vulnerability Assessment (CVA) to Optimize Control System Upgrade Activities During Turnaround
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Introductory comments on: “ How will the low level rf systems required for bunch compression, cavity tuning, machine protection, etc. be designed so as.
Eva Barbara Holzer ICFA HB2006, Tsukuba, Japan June 1, 2006 1 Eva Barbara Holzer, CERN CLIC Workshop CERN, October 18, 2007 Machine Protection system:
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
BEAM LOSS MONITORS FOR CLIC 24/NOV/2011 S. Mallows, E.B. Holzer, J. van Hoorne, (BE/BI), CERN.
[email protected] William Berg 1.24.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor William Berg ANL/APS Diagnostics Group.
[email protected] William Berg 6.17.08 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor Status Report, FAC 6.17.08 William Berg ANL/APS Diagnostics.
A New Vision for the Evolution of Controls J. Patrick, C. Briegel, B. Hendricks APT Seminar February 21, 2008.
1 A Summary of CHEP 2007 Dmitry Emeliyanov, RAL PPD Victoria, BC, Canada, 2-7 Sept. 2007.