Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
26.09.2009 1 Dark matter research at the MESA facility ( MESA=M ainz E nergy recovering S uperconducting A ccelerator) Kurt Aulenbacher Institut für Kernphysik.
26.09.2009 1 ELSA: slow extracting stretcher ring at BONN University Energy 0.5--3.5 GeV external beam current a few nA (--100na?) Contact: Wolfgang Hillert.
COBALT MICROSTRUCTURE BY DC MAGNETRON SPUTTERING
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
HYBRIS: R. Keller 041021Page 1 A Hybrid Ion Source Concept for a Proton Driver Front-End R. Keller, P. Luft, M. Regis, J. Wallig M. Monroy, A. Ratti, and.
Signal to Noise Comparison PEEM-3 and SPHINX Gilbert Group 7.11.2011.
Accelerator/RFQ Alain FRANCE for the ESS RFQ Team at CEA Saclay April 21, 2015.
Characterization of Ti-6Al-4V open cellular foams fabricated by additive manufacturing using electron beam melting L.E. Murr 1,2, S.M. Gaytan 1,2, F. Medina.
Vector Modulation of High Power RF
Kurt Aulenbacher Institut für Kernphysik Universität Mainz SLAC, 26.09.2009
Hypernuclear spectroscopy up to medium mass region through the (e,e’K + ) reaction in JLab