KEKB Design 1.Parameters 2.Collider Ring 3.Interact Region 4. Magnet, RF, Instabilities 5.Recent progress with crab crossing.
Halo calculations in ATF DR Dou Wang (IHEP), Philip Bambade (LAL), Kaoru Yokoya (KEK), Theo Demma (LAL), Jie Gao (IHEP) FJPPL-FKPPL Workshop on ATF2 Accelerator.
LEP3 Machine Design Options Frank Zimmermann LEP3 Day, 18 June 2012 work supported by the European Commission under the FP7 Research Infrastructures project.
Longitudinal Stability of Short Bunches at BESSY Peter Kuske,
Considerations on TLEP (top-up) injection