THE WONDER OF CERN...by Stefano Gallizio
Federico Alessio Supervisors Diego Gamba, Angelo Rivetti Richard Jacobsson A complete system for controlling and monitoring the timing of the LHCb experiment.
Preparation of Review R. Assmann et al CWG, 6.6.2011 CWG 6.6.2011 R. Assmann.
Upgrade R&D January 2005 A. Seiden U.C. Santa Cruz.
1 Summary of Session E: Electron Cloud an Ion Desorption A. Kraemer and S.Y. Zhang Three Workshops in one year: Beam Induced Pressure Rise in Rings, BNL,
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
LHC Status Report UK HEP Forum 2010 20-Sep-2010Cosener’s HouseMassimiliano Ferro-Luzzi 1 LHC status report Massimiliano FERRO-LUZZI, LHC Programme Coordinator.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
LHC – New era ? Large Hadron Collider (protons + protons) C.H. Wang/nuu.
“Bringing the first LHC beams into collision at all 4 IP's”
Observations and measurements on the ZS during the SPS MD 27-29 April 2010
Injector MD planning and requests for 2014 Giovanni Rumolo and Hannes Bartosik Thanks to all MD users, machine supervisors, operators, experts … MSWG meeting,