LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September 20041 Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
8 th Workshop on Electronics for LHC experiments - Colmar- September 9 th -13 th 2002Gilles MAHOUT Prototype Cluster Processor Module for the ATLAS Level-1.
DOE Site Visit: Daya Bay7/18/20111 Daya Bay Steve Kettell BNL 1)Status 2)BNL roles.
A 72 Channel 125 MSPS Analog-to-Digital Converter Module for Drift Chamber Readout for the GlueX Detector G. Visser 1, D. Abbot 2, F. Barbosa 2, C. Cuevas.
Super-Belle Vertexing
GlueX Collaboration Meeting 12GeV Trigger Electronics 16 – 18 February 2012 R. Chris Cuevas
Gating grid concept for ALICE upgrade Howard Wieman 4/2/2014 1.
Efi.uchicago.edu ci.uchicago.edu ATLAS Experiment Status Run2 Plans Federation Requirements Ilija Vukotic XRootD Workshop @ UCSD San Diego 27 January,
gating grid concept for ALICE upgrade
Super-Belle Vertexing Talk at Super B Factory Workshop Jan 20 2004 T. Tsuboyama (KEK) Super B factory Vertex group Please visit .
TRBnet for the CBM MVD-Prototype Borislav Milanović In cooperation with: J. Michel, M. Deveaux, S. Seddiki, M. Traxler, S. Youcef, C. Schrader, I. Fröhlich,