Spectrometer compensation in IR2 and IR8 during the 450 GeV collision run September 11, 2006 LOC meeting Y. Papaphilippou Thanks to S. Fartoukh, W. Herr,
Spectrometer compensation in IR2 and IR8 during the 450 GeV collision run
450 GeV Optics: IR aperture and IR Bumps
450 GeV Optics: IR aperture and IR Bumps September 20th, 2006 LHC C ommissioning W orking G roup W. Herr and Y. Papaphilippou Thanks to R. Assmann, R.