Steinback tri state_2010
Tim Roughan, Director of Distributed Resources National Town Meeting on Demand Response and Smart Grid July 14, 2009 National Grids Smart Grid Efforts.
Federal & State Regulatory Issues Elizabeth W. Whittle Nixon Peabody LLP 401 9th Street, N.W. Washington, D.C. 20004 (202) 585-8338 [email protected].
1 Introducing the Specifications of the Metro Ethernet Forum MEF 26.1: ENNI - Phase II External Network to Network Interface.
Daniel Cooper - November 11, 2011
Wind Power Susan Zobitne, Chelsea Fufaro, Tim Bousson.
Mapping the Broadband Ecosystem A Presentation at: Faceoff: A Fact-Based Debate on U.S. Internet Policy and Access Networks Organized by The Internet Ecosystem.
Redes Multimedia Copyright 2004M.C. Juan Antonio Guerrero Ibáñez CAPÍTULO III Frame Relay M. En C. Juan Antonio Guerrero Ibáñez.
Tim Roughan, Director of Distributed Resources
Frame Relay Overview n Frame Relay defines the interconnection process between the DTE and the DCE (the Frame Relay network switch, not the CSU/DSU).
Large Generator Interconnection Procedures Reform 2 nd Stakeholder Meeting May 5, 2009.
Mod 5 – Frame Relay. Overview Frame Relay has replaced X.25 as the packet-switching technology of choice in many nations, particularly the United States.