High Resolution Mass Spectrometers role in small molecule studies TuKiet T. Lam, PhD Chem 395: Bioanalytical Chemistry April 12, 2011 1.
Suavizado de Codigos , Minimazar Multipath
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
New Corrector System for the Fermilab Booster E.J. Prebys, C.C. Drennan, D.J. Harding, V. Kashikhin, J.R. Lackey, A. Makarov, W.A. Pellico Fermilab, Batavia,
Walter Wuensch, CERN CLIC Project meeting, 29 September2015 The CERN dc Spark System (and a little bit of theory)
Femtosecond laser ablation dynamics in wide band gap crystals. N.Fedorov CEA/DSM/IRAMIS École Polytechnique.
Western Consortium on the NanoPhysics of Electron Dynamics near Surfaces in High Power Microwave Devices and Systems Ryan Umstattd Naval Postgraduate School.
Progress in sub-picosecond event timing Ivan Prochazka*, Petr Panek presented at 16 th International Workshop on Laser Ranging Poznan, Poland, October.
Near Term* Plans for the Fermilab Proton Source Eric Prebys FNAL Accelerator Division *Near term = “prior to proton driver”
-Fact 99 cdj Experiments with liquid jets C.Johnson CERN History CERN Mercury Jet Target - version 1985 Muon Collider Collaboration Targetry Workshops.
Suite du séminaire CPPM 5/12/2011 Morceau choisi de : FLOWER Fluctuations of the Light velOcity WhatEver the Reason François Couchot, Xavier Sarazin, Marcel.
Status of the ASTA Facility Machine Protection System at Fermilab Arden Warner June 6 th, 2012.