Gis
GeneratorWinding Heaton
Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa 1.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
Status of the LHCb experiment
The ATLAS Hadronic Endcap Calorimeter
TE-MPE LS1 review 02/06/2015, Mateusz Bednarek, TE/MPE-EE ELQA during LS1 – the “unexpected” activities New developments Exceptional NCs Other tests.
(Selected Items on) Quality Control at Aachen
Standards ATAMER DIŞ TİC. A.Ş. 0312 473 44 24. Content Introduction Standards -IEC 60502-2014 -CENELEC HD 620 -IEEE 400 - 2012 -IEEE 400.2 – 2013 -IEC.
Report on tests ongoing in Perugia
K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.