RHIC, STAR computing towards distributed computing on the Open Science Grid Jérôme LAURET RHIC/STAR.
EPICS 2008, ShanghaiBEPCII Timing System1 BEPC-II Event Timing System Ge LEI for BEPC-II timing team Institute of High Energy Physics, Beijing Mar. 2008.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
RHIC Heavy Ion Run-11 Status Meeting Updates. Heavy Ion Run Final Update 6/24-27 ● Physics running, 41 stores – Tandem intensity issues – Access controls.
Overview Run-6 - RHIC
Report to IDAG
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline 1 Feb – Start of the Run-6. Start of the cooldown.
Günter Sigl, Astroparticules et Cosmologie, ParisURJA2005, Banff, July 11-15 General facts and the experimental situation Acceleration (“bottom-up”
G ü nter Sigl Astroparticule et Cosmologie, Université Paris 7
Report to IDAG ILD concept group From simulation to an “engineered” proposal.
RHIC Heavy Ion Run-11