1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May 2006. CERN run August 2006. Data/MC comparisons for ECAL.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
Managed by UT-Battelle for the Department of Energy 3 MW Solid Rotating Target Design T. McManamy F. Gallmeier - Neutronics M. Rennich – Mechanical design.
Giovanni De Lellis University of Naples (Italy) An overview of the European Scanning System (ESS) Nucl.Instrum.Meth. A568 (2006) 578-587 Nucl.Instrum.Meth.
B-Production in PYTHIA Nick Brook University of Bristol Review of current use Review of current use Comparisons Comparisons B-asymmetries B-asymmetries.
Slide 1 Diamonds in Flash Steve Schnetzer Rd42 Collaboration Meeting May 14.
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta Chris Densham STFC Rutherford Appleton Laboratory, UK 1 st joint meeting of EUROnu WP2 (Superbeam)
Undulator-Based Production of Polarized Positrons An experiment in the 50 GeV Beam in the SLAC FFTB E-166 Undulator-Based Production of Polarized Positrons.
Jim Stewart Tagger Magnet Design Review July 2009.
EPAC June 2003 Undulator-Based Production of Polarized Positrons A proposal for the 50 GeV Beam in the FFTB E-166 Undulator-Based Production of Polarized.
Planning for Electromagnetic Irradiation Studies of Silicon Strip Sensors at SLAC/SCIPP Viltaliy Fadeyev, Spencer Key *, Donish Khan *, Tom Markiewicz,
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.