Photon Collimation For The ILC Positron Target Lei Zang The University of Liverpool Cockcroft Institute 24 th March 2007.
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
BEAM LOSS MONITORS FOR CLIC 24/NOV/2011 S. Mallows, E.B. Holzer, J. van Hoorne, (BE/BI), CERN.
CNGS Operation Results 2008 Edda Gschwendtner AB/ATB on behalf of the CNGS team.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Shielding calculation for ESS accelerator Lali Tchelidze TAC meeting April 2, 2014.
LHC Cryogenics Schneider PLCs: Radiation tests at H4IRRAD Mitigation measures
Status of The HIE-ISOLDE Design Study Richard Catherall EN-STI ISCC Meeting 30 th October 2012 CERN.
Status of The HIE-ISOLDE Design Study