1 ACS Status Update STScI TIPS Meeting 19-October-2006 Ken Sembach.
Parameterized Shower Simulation in Lelaps: a Comparison with Geant4 Daniel Birt, Amy Nicholson.
Daya Bay RPC Gas Safety System FDR, June 19, 2008 1 Daya Bay RPC Gas Safety System Design Changguo Lu, Kirk McDonald Princeton University (June 19/20,
DESY 9 Dec 2004Mark Thomson 1 Software Needs for ILC Detector Optimisation Mark Thomson University of Cambridge Motivation What to Optimise ? How.
1 December 19, 2007 RPC Gas Flammability C. Lu Princeton University.
EFFICIENCY of the NEUTRON MONITOR NETWORK Functioning in the long term and real time mode E.Eroshenko, A. Belov, V. Yanke 1) Pushkov Institute of Terrestrial.
Research Education for Teachers Summer 2013
Modeling the Input Optics with e2e
Hall D infrastructure and integration
Brief review:
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Tracking Software Status Tracking Software Status Norman A. Graf for the tracking group ( prime architect: David Adams ) Software and Data Analysis Workshop.