HPK L1 teststructures HPK L1 half moon teststructure corresponding to main chips 6,7 Results on Diode C-V Coupling capacitors polysilicon arrays.
Department of Physics VERTEX 2002 – Hawaii, 3-7 Nov. 2002 Outline: Introduction ISE simulation of non-irradiated and irradiated devices Non-homogeneous.
Irradiation Goals Confirm that the breakdown performance improves with dose-Done Check that breakdown does not appear after inversion on n-type sensors-Done.
HPK L1 teststructures
Field and Charge Collection studies on pion irradiated p-type Float Zone strip detectors